LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS 2015-2016 PSB PS.

Slides:



Advertisements
Similar presentations
HOW TO SET UP AND ACCESS YOUR LEGAL FRAMEWORK ACCOUNT Exit at Service Road:
Advertisements

1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Exercise Exercise3.1 8 Exercise3.1 9 Exercise
Exercise Exercise Exercise Exercise
Exercise Exercise Exercise Exercise
Exercise Exercise6.1 7 Exercise6.1 8 Exercise6.1 9.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
1 times table 2 times table 3 times table 4 times table 5 times table
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup TIMING IN C.C.C - SPS Purpose, Scope CHERY.R.
Space for Nicole Maria J. G. Borge & Magdalena Kowalska.
40m OAN telescope. First experience with ACS Observatorio Astronómico Nacional P. de Vicente, R. BolañoMarch 2004.
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Introduction S. Baird 12 th September Accelerator Consolidation Workshop  Why are we here?  Boundary conditions  What is (not) included?  Outcome.
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Update to Deans’ Council October 14 th, 2011 Bookstore Liaison Team Update Fall 2011.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
NetCom – One ProductGuide A Practical Customer Case, TM by Rune Rysstad, Avenir.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Adding SubtractingMultiplyingDividingMiscellaneous.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
YETS PS&TT2 list of works planned and planning Simon Mataguez EN/MEF-OSS More info about the PS machine? Many thanks.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Review POSTING Refer to link: Note%20-%20Posting.html Note%20-%20Posting.html.
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
Tables Learning Support
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
NLD-WRT Brief October 2008 US Army Corps of Engineers NLD-WRT Submission Library Primer.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
ACC 491 Week 2 Learning Team Auditing Attestation and Assurance Services Paper Team-Auditing-Attestation-and-Assurance-Services-Paper.
Electrial Safety LS2 days November 2016 AP
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
Applied Software Testing
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
Injector De-cabling Project
LIU–PLI report LIU PSB meeting.
EC Activities Status for the LIU
YETS & LS2 Reminder G. Girardot 20 juin 2017.
prepared by R.A.Barlow 30/056/2016
Survey on “Chargés de Consignation” Follow-up
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
Times Tables.
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
3 times tables.
6 times tables.

LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

LIU–PLI report LIU Project Team meeting

Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS

Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS SPS

Follow-up on the requests to EN-EL-CF The requests concern the DEC: Demande d’Enlèvement de Cables DIC: Demande d’Installation de Câbles DIR: Demande d’Installation de Racks DIF: Demande d’Installation de Fibres PSB Lots of work has been done with Georgi but after compiling the requests he received and the list of activities, it appears that some information are still missing. We (MEF and EL) would like to repeat the exercise to complete the missing information. PS Only few requests received SPS Only few requests received

EN-EL-CF requests status for the PSB October 2015LIU PLI meeting - J.Coupard5 Need to be sure that all the other activities do not require any cabling

PLAN tool Activities created under LIU Project = 73 PSB = 41 PS&TT2 = 18 SPS = 7 Contributions requested in activities under LIU Project = 453 Cross-check of all requests in PLAN with the list of activities establish for the LIU Project. A new column will be added in the LIU-PLI follow-up tables to refer to the activities in PLAN. 29 October 2015LIU PLI meeting - J.Coupard6