Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.

Slides:



Advertisements
Similar presentations
Manual Flo-tap Installation Instructions
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
LCLS-II Cryomodules Production Plans at Fermilab
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
CRYO PIPING & INTER-MODULE CONNECTIONS Yun He, Daniel Sabol, Joe Conway External Review of MLC Daniel Sabol, MLC External Review 10/3/2012.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Installation of the T600 at Fermilab CSN2, September 22,
Overview of Main Linac Cryomodule (MLC)
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Overview of Main Linac Cryomodule (MLC) Yun HE MLC Internal Review 9/5/2012Yun HE, MLC Internal Review1.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
LCLS-II Cryomodules Production at Fermilab Tug Arkan, 7/17/2014.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Cryomodule Interconnect Design Yun He, Tom Peterson, Yuriy Orlov, Tug Arkan July 29, 2015.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug Arkan February 21, 2012.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
1.3-GHz Cavity Vacuum Furnace at IB4
Overview of Mechanical Design
Definition of work flow for string DESY Example on critical operation
S1-G Webex meeting Global Design Effort
Far Detector Activities Late 2017 – Early 2018
UK RFD Pre-Series cryomodule
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
IMP Cryomodule Assembly and Alignment
IHEP Cryomodule Status
Cryomodule Assembly Plan
SNS PPU Helium Vessel Design and Assembly
SNS Coupler Shipping Plans
SNS PPU Cryomodule Space Frame
SC1R Cold Box PDR Assembly Sequence
SNS PPU Cryomodule Design Overview
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015

2 Introduction Design of LCLS II Interconnection based upon XFEL design -Major Difference in Size of Tunnel & Location CM within Tunnel -Minor Difference in Build to Install Sequence XFEL: Assembly Transport Accept Test RFI Install LCLS-II: Assembly Test RFI Transport Accept Install 3.35m (11’) 3.05m (10’) LCLS-II XFEL (Graphics to scale)

3 SLAC Interconnect Installation Assumptions FNAL design team has checked that CM interconnections are achievable within SLAC tunnel space and ergonomic constraints This FDR covers only string interconnect string (CM to CM, not to End/Feed caps) Prototype and Production CM interconnects are identical CM delivered to SLAC Ready for Installation Incoming acceptance inspection confirms no change or damage during long transit -Checks for vacuum, electrical continuity, alignment, shipping FNAL provides designs for interconnect tooling and fixturing SLAC procures interconnect tooling and fixturing FNAL will develop interconnect procedures SLAC will develop interconnect travelers

4 Receiving and Off-Loading Truck Arrives from SACLAY Remove Ceiling and Walls Check Data Shock Logger Attach Lifting Beam CM removed from Transport Frame CM Lowered onto Supports

5 Receiving and Prep for Test Check Vacuum Gauges and Alignment Shipping Caps Removed Portable Clean Room to Remove Vacuum Gauges Accessory Box to Check Pipes and Vacuum

6 Pipe Preparation-Cut, Face, Clean & Package Tooling to Measure and Mark Pipe Length Inserting Wire Brush to Keep Pipe Clean Cutting Pipe to Length with Band SawRemoving Brush after Cutting

7 Pipe Preparation-Cut, Face, Clean & Package Tooling to Face Ends of Pipes All Pipes are Cut and Faced Pipes Capped and Ready for Installation Desiccant Humidity Indicator

8 Assembly of Large Bellows on CM Prep to Lift Bellows Install Complete Transport Bellows to CM Prepare to Install on CM

9 CM Transport Test to Tunnel CM Transported from Test Facility CM Arrives at Install Site Preparing to Lower into Tunnel CM Transporter Viewed from Above

10 CM into Tunnel CM Transporter CM Transporter-Attachment Cradle Lowering CM to Tunnel Preparing to Install CM on Transporter

11 Tunnel Transport and Ceiling Mount Moving CM through Tunnel Raising CM to Supports Attaching CM to Supports CM Installed

12 Welding the HGRP Qualify the weld Tack interconnect pipe in place Checking weld set-up Performing weld-workers on both sides of CM Orbital Track Welder with Custom Head

13 Welding Cryogenic Pipes LCLS-II Planning Meeting, Oct 9-11, 2013 Qualify the weld Install paddle weld head Tack interconnect pipe in place Head oriented to fit location Perform the weld Completed weld

14 Leak Checking Cryogenic Pipes Elastomer Leak Check Fixtures Leak Checking HGRP Welds Leak Checking Cryogenic Pipes Welds with Elastomer Fixture Aluminum Leak Check Fixtures Aluminum Leak Check Fixtures Installed Leak Checking Cryogenic Pipes Welds with Aluminum Fixture

15 HOM Installation Class 10 Portable Cleanroom HOM Install Fixture Placing HOM on Fixture in CR Prep Gate Valves in CR

16 HOM Installation Raising HOM into Position Removing Flange Caps HOM Ready to Interconnect HOM Installed HOM with Clean Room Removed

17 Thermal Shield Connection Solid Aluminum Thermal Shield Covers Perforated Aluminum Shield Covers Final Layer of MIL Installed-Ready for Lg Bellows Shield and Cryo-Pipe Bellows Restraint Installed

18 Large Bellows Installation Bellows Install Fixture Top Supported (Tunnel) Bellows Install Fixture Bottom Supported (Test Facility) Bellows Prep’d to Move Sliding Bellows into Position Bellows in Position

19 Large Bellows Installation Sliding Ring into Position Bolting Ring to Bellows Attaching Clamps Aisle Side Attaching Clamps Wall Side Bellows Installed and Threaded Rods Removed

20 Example of Vacuum Pump Station Installed on Large Bellows

21 Testing the Design LCLS-II Planning Meeting, Oct 9-11, 2013 Recommend FNAL and/or JLAB “interconnect” 2 CM for fit up check In next few months SLAC will build weld test fixture to confirm design -Use pipe X, Y coordinates, materials, dimensions as defined in CM Interconnect Assembly Procedure -Model to confirm clearance work for weld tracker, custom weld head, paddle heads, insulation shield fit -Development of weld sequence and parameters, purge and leak check tooling -Model to check ergonomics, special tooling requirements not already identified -Develop pressure test or X-ray procedures

22 Some Areas of Concern or Issues to Resolve Tube cutting prior to ship Receiving Inspection and Acceptance Vacuum gages attached during transit in tunnel Tube welding Purge, welding gas (space for 12 pack) Thermal Insulation Shield – XFEL fit problems Installation of HOM absorber Pressure test vs X-ray Big Bellows installation and connection Continuous dry air purge vs desiccants Class 10 cleanroom in tight environment Installation required from wall side? – ergonomics, special tooling

23 Summary LCLS-II Planning Meeting, Oct 9-11, 2013 LCLS II CM Interconnect similar but not identical to XFEL CM interconnect SLAC personnel observation & participation at XFEL extremely useful for understanding and recording installation process Photos all courtesy K. Ratcliffe and J. Garcia - Complete set of photos can be found at: ab_Info/Partner%20Labs%20Photos%20and%20Videos.aspx Major differences identified Working with FNAL design team to identify, address and resolve gap/issues So far don’t see any show stoppers

End