Sébastien MICHALMarch 2009. Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.

Slides:



Advertisements
Similar presentations
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Advertisements

Health and Safety Executive Health and Safety Executive Dropped Objects Update September 2013 Donald Dobson Health & Safety Executive Offshore Division.
Typical Walk-in Closet with elfa® décor
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
Components for the low- maintenance switch Components for the low maintenance track Schwihag RBH system.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
1 ZDC Status, 9th December ‘07 Fitting in the TAN slot Getting in and out of the TAN Schedule Trigger Yasar Onel (Michael Murray) for ZDC group.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Installation of Delphi Frame  ITS Installation.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Jigs and Fixtures.
Disassemble, Assemble and Perform a Function Check on the M9
Health and Safety Training Standards in Design and Technology
PRESENTATION OF GROUP B
SQXF Shell & Yoke Assembly Procedure
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
Miter Saw Safety Description:
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
The vertical milling machine
Presentation by ANAS AHMAD ME1 B1 batch Submited to
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
VTX Half LAYER 4 LAYER 3 LAYER 1 LAYER 2 EACH LAYER’S BARRELL MOUNT NEEDS TO BE REFERENCED TO KINEMATIC MOUNTS AND IT’S MOUNTED LADDERS.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
BY B.JITHENDRA KUMAR Shaper Machine. Introduction The shaping machine is used to machine flat metal surfaces especially where a large amount of metal.
BORING MACHINE ENROLLENMENT NO:588,589,590,591,592,593
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Disassembly and Cleaning of the M9 Beretta
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
Handling Discussions LAGUNA-LBNO/Layout Study Group - Friday 19/7/2013 Keith Kershaw EN-HE.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
SX1 manipulation VERSION 1 Version
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Escalator Installation
Present status of the flux return yoke design
INSTALLATION SEQUENCE
Installation step 4. (3 days)
Remaining lectures Last lecture by Dr. Darpe: Wed, 3rd Oct
Initial BIS installation
Taper Turning on the Centre Lathe
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
Additional Upstream Coil Shielding
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Presentation transcript:

Sébastien MICHALMarch 2009

Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally EES frame crossing bar

Sébastien MICHALMarch 2009 EES ASSEMBLY EES1 and EES2 fixed on assembly table and lifted EES1 and EES2 fixed on assembly table and lifted EES chamber struts and temporary pin inserted EES chamber struts and temporary pin inserted

Sébastien MICHALMarch 2009 EES ASSEMBLY EES frame mounted, alignment bar in REST position EES frame mounted, alignment bar in REST position EES assembly fixed to the table, lifting beam connected to the assembly EES assembly fixed to the table, lifting beam connected to the assembly EES frame REST position Adjustable supports

Sébastien MICHALMarch 2009 EES ASSEMBLY Crane fixed to the assembly table. Crane fixed to the assembly table. EES assembly (chambers, alignment bar, frame, lifting beam) are rotated until the vertical position. EES assembly (chambers, alignment bar, frame, lifting beam) are rotated until the vertical position. Assembly table rocking fixation connected to the floor. Assembly table rocking fixation connected to the floor. Crane connected to the lifting beam. Crane connected to the lifting beam. Fixation btw assembly table and EES assembly disconnected. Fixation btw assembly table and EES assembly disconnected. EES assembly lifted and fixed to the EO rack. EES assembly lifted and fixed to the EO rack. EO rack with two EES assemblies transported to point 1 and lowered into the pit. EO rack with two EES assemblies transported to point 1 and lowered into the pit.

Sébastien MICHALMarch 2009 EES SUPPORTING STRUCTURE Fixed to barrel struts and voussoirs Fixed to barrel struts and voussoirs Surveyed Surveyed Removable in sector 5 Removable in sector 5 Supports Curved aluminum pipes (rails)

Sébastien MICHALMarch 2009 RAIL SUPPORT Adjustable connecting pin Adjustable connecting pin

Sébastien MICHALMarch 2009 EES INSTALLATION TOOLING Fixed to sector 5 strut Fixed to sector 5 strut Removed for the sliding of chambers and walkways Removed for the sliding of chambers and walkways Before EES installation, installation of walkways and gangways Before EES installation, installation of walkways and gangways

Sébastien MICHALMarch 2009 WALKWAYS AND GANGWAYS Modular and divided in two portions. Modular and divided in two portions. They surround the EES assembly. They surround the EES assembly. Installation step: Installation step: –First portion introduced –EES assembly introduced and positioned –Second portion introduced They will be inserted using EES rails They will be inserted using EES rails

Sébastien MICHALMarch 2009 EES ASSEMBLY LOWERING EES assembly lowered with lifting beam EES assembly lowered with lifting beam Installation of the hanging fixations, lifted to sector 5 Installation of the hanging fixations, lifted to sector 5 Hanging fixations

Sébastien MICHALMarch 2009 EES INSTALLATION TOOLING Trolleys positioned on the rails Trolleys positioned on the rails 4 trolleys

Sébastien MICHALMarch 2009 EES ASSEMBLY INSERTION Pass trough struts and voussoirs Pass trough struts and voussoirs Ladder placed in sector 5 must be removed Ladder placed in sector 5 must be removed

Sébastien MICHALMarch 2009 EES ASSEMBLY INSERTION EES assembly fixed to the strut, IPN profiles partially removed, installation of missing rails EES assembly fixed to the strut, IPN profiles partially removed, installation of missing rails

Sébastien MICHALMarch 2009 EES ASSEMBLY INSERTION Tireforts and rail hoist slightly tensioned, strut fixation and trolleys detached, hanging fixation removed. Tireforts and rail hoist slightly tensioned, strut fixation and trolleys detached, hanging fixation removed. EES assembly EES assembly pulled with rail hoist and safely guided by tireforts

Sébastien MICHALMarch 2009 ALIGNMENT BAR POSITIONING Before arriving at correct location, alignment bar move up by 40 mm Before arriving at correct location, alignment bar move up by 40 mm REST position WORK position Camera mount Metallic safety strip and rest support removed Metallic safety strip and rest support removed Safety strip

Sébastien MICHALMarch 2009 EES ASSEMBLY INSERTION Survey clamp (two pieces): correct azimuthal location Survey clamp (two pieces): correct azimuthal location EES assembly locked up in position with the second clamp EES assembly locked up in position with the second clamp Tireforts detached Tireforts detached Gangways installed Gangways installed Chamber aligned Chamber aligned using adjustable support and struts