New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/2011 1 https://edms.cern.ch/file/1016233/0.3/L4-CIB-ES-0001-01-30.pdf BIS: Beam Interlock.

Slides:



Advertisements
Similar presentations
1 The 2-to-4 decoder is a block which decodes the 2-bit binary inputs and produces four output All but one outputs are zero One output corresponding to.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
The TIMING System … …as used in the PS accelerators.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
DEVICES AND COMMUNICATION BUSES FOR DEVICES NETWORK
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
8 Channel Fiber Optically Linked Data Acquisition System for Booster Modulators Tsatsu Nyamadi Norfolk State University Supervisor Rene Padilla Fermilab.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
PSB Injection Sequencing in the Linac 4 Era PSB Injection Sequencing in the Linac 4 era Alfred BLAS 1 Synthesized information from: M.E. Angoletta, P.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
27 August cp EPTAB5 1. Electronic Systems Support EPTAB 5 27 August 2003 News & Information Chris Parkman Catherine Moine.
Sept-2003Jean-Claude BAU1 SEQUENCING AT THE PS Let’s take a quick tour.
1 LTC Timing AB/CO/HT Central timing hardware layout Telegrams and events Postmortem, XPOC LHC Central Timing API Fill the LHC Use Case Julian Lewis.
EPC Power Converters and the Linac4/PSB Beam Interlock System B. Mikulec, B. Puccio & J-L. Sanchez.
New PSB Beam Control Upgrade of daughter cards Alfred Blas PSB rf Working group meeting 24/03/ Generation of REV clocks 2.Synchronization with.
Adapting the LHC 1TFB electronic circuit to other equipments The candidates are: PS 1TFB PS TFB PS CBFB PSB TFB PSB 1TFB 1 Alfred Blas Working group meeting.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
LLRF FOR CHOPPER Grégoire Hagmann Philippe Baudrenghien BE/RF/FB February 24th, 2013.
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
PSB ring inhibit in the Linac 4 era A. Blas PSB LIU meeting 07/03/ Summary of discussions involving (mainly): Jose-Luis Sanchez Alvarez Philippe.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
ESS LLRF and Beam Interaction
RF acceleration and transverse damper systems
Generic Remote Interface Unit (RIU) Interface Control Document (ICD)
0v1.
Data providers Volume & Type of Analysis Kickers
Beam Interlock System SPS CIBU Connection Review
Overview of the Beam Interlock System
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Overview of CERN BIS and Communication Hardware
SLS Timing Master Timo Korhonen, PSI.
Injectors BLM system: PS Ring installation at EYETS
LINAC4 50 MeV phase BIS STATUS
RF interlocks for higher intensities (LMC 15 June)
Outcome LBDS Dry Run – week 7
BE-BI Software for LINAC4
The ELENA BPM System. Status and Plans.
Digital Communication
1v0.
Safe mode transmission
Directional Driver Hazard Advisory System
PSB Injection scheme in the Linac 4 era
Local Asynchronous Communication (RS-232)
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Combiner functionalities
Interlocking of CNGS (and other high intensity beams) at the SPS
New PSB beam control rf clock distribution
BCM-BIS Interface Szandra Kövecses
Power Supply Control for BEPCII
Beam Interlocks for Detectors and Movable Devices
Towards final BCM firmware and interface to MPS Hooman Hassanzadegan BI forum, Nov 2018, Lund
The LHC Beam Interlock System
Interlocking strategy
Beam Charge Measurement &Injection efficiency
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
SPS Injection BIS - Draft requirements
Presentation transcript:

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock system - Global: not ring specific - PPM : related to an interlock zones, which in the L4 - PSB context corresponds to 5 Linac 4 destinations (in green) PS

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ The BIC signal is PPM (destination related!) One cycle for ISOLDE might be OK when the next towards PS is not or vice-versa. This “Beam Permit” will be used as an interlock to all 4 rf Beam controls => stop acceleration on 4 rings Our input to the BIS

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ Up to 14 CIBUS connected to one BIC Here we need to create 2 redundant signals (and cables) to indicate a global rf fault Here we are also !

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ We will have one of these modules for the RF-LL to propagate our interlock We will only feed the CIBUS input with a redundant ( 2channels) “all rf down” signal

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ USER_PERMIT is guaranteed FALSE when the diff. voltage 3V (with courant limited to 12 mA)

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ Output available on the CIBUS for local use This CIBUS “beam info” output is of no interest to us It is only a logic function of a limited number of “user permit” values

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ CIBUS Burndy Connector from/to User

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/

New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ The BIS interlock is global – all 4 rings – In the “BEAM INTERLOCK SPECIFICATIONS FOR LINAC4, TRANSFER LINES AND PS BOOSTER WITH LINAC4” document These are referred to as external conditions with name BR1->4.RF N.B.: there are other pieces of information called external conditions (see next slides) The ring specific interlock indicates, to the Chopper mainly, but not to the BIS that a specific ring is not available for acceleration

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ different interlock signals per ring have been considered to input the RF (each may trigger a different response from the rf). 1) Interlock from the BIS (PPM, synchronous with the cycle, all rings) 2) Interlock due to external conditions (PPM, synchronous with the cycle, ring specific) 3) Interlock due to a real time measurement (ring specific, response time in the order of a couple of ms) 4) Interlock from the RF power equipment (real time “over current” + “gap closed” +... for each of the up-to-3-per-ring cavities) Interlocks 2) and 4) will have to be analyzed to create a ring specific interlock (or external condition) to be sent to the Chopper. Ex: if for a ISOLDE cycle the C16 cavity is not ready, the cycle should still remain => not ring specific interlock

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ ) The BIS signal will be activated as a result of upstream detected faults. The list of these faults is out of the scope of this presentation. Source: BIC of the chopper-pre-chopper chain, located in the Linac 4 building. Signal and type of media: pair of optical fibbers (for connectors and cables see annex) RF response to the interlock: For the time being the action will be: rf voltage brought to zero volt and rf frequency brought to injection value. Contact person: Bruno + Bettina + José

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ ) Interlock signal due to external conditions (ex: experiment not requiring anymore the beam) Source: Software chain ending on a CTRV within the RF VME/VXS crate Signal type: TTL-bar timing pulse with an appropriate (programmable) length to be defined. The C-time occurrence value within the interlocked cycle needs to be defined to suit the RF DSP process. RF response to the interlock: For the time being the action will be: rf voltage brought to zero volt and rf frequency brought to injection value. Contact person: Ioan Kozsar + Bettina + José

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ )Interlock due to real time beam current measurements: All the 4 beam currents are sampled at a specific C-time (programmable? to be decided by OP). If the specified ppm current-threshold, for a given ring is exceeded, an rf interlock is sent to the specified ring. We have first planned to use a CTRV TTL-bar output as the source of the interlock signal, but Lars Jensen and Ioan are now proposing, to simplify the integration, to use a simple VMOD TTL (still the standard to use for this kind of application, according to Javier Serrano). Source: DPSBBDR, bât 361, R758, very close to the rf cage (<10 m). The general idea (Ioan) is that the ADCs measuring the 4 beam intensities should be within the BI group crates where the beam transformer signals are available. A sample of the beam current value at a specific time value within the cycle should then possibly propagate an interlock within a couple of ms. This necessitates that the VMOD TTL creating the TTL-bar interlock pulse for each of the 4 rings sits in the same crate as the ADCs. Signal type: TTL-bar bit from a VMOD TTL on a line to be defined (high level means OK). RF response to the interlock: For the time being the action will be: rf voltage brought to zero volt and rf frequency brought to injection value. Contact person: Lars Soby (BI), Ioan for the control aspect, Lars Jensen for the Fesa class update of the BCTs, José for the software and Bettina for the overall view.

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ ) Interlock from the RF power equipment Source: BRF Signal type: Multiplexed information on a single fibber for each cavity. An electronic module on the power side will collect all the error bits and combine the information on a single link. The idea is that the time information remains present on the link with a precision in the order of 1 ms This means that, if an over-current lasts 20 ms for example, this 20 ms value should be decoded on the LL side (communication protocol to be defined) RF response to the interlock: the LL RF will abort the acceleration (rf voltage brought to zero volt and rf frequency to injection value) Moreover if 10ms before injection, all the cavities selected by the operation are not ready, the faulty ring injection will be cancelled at the Chopper stage in real time (details to be discussed with Ioan and Philippe). Contact person: Philippe, Ioan, Bettina, José

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ Still under discussion: Ring specific interlocks to the chopper. From the RF-LL side there is no way to know if a cavity is strictly required for a specific user. A fault on 1 or 2 cavities doesn’t necessarily mean that the cycle needs to be cancelled! The OP needs to decide if they are willing to send us a mask of required cavities for each cycle. Ring specific interlock hardware: to be discussed with Philippe Communication protocol and hardware between Power RF and LL

New PSB beam control Interlocks A. Blas PSB Beam Control 20/01/ VD 80 : SCL description: \\cern.ch\dfs\Departments\AB\Groups\RF\Machines\General\Documentation\ElectronicDesignDocumentationOverview.pdf\\cern.ch\dfs\Departments\AB\Groups\RF\Machines\General\Documentation\ElectronicDesignDocumentationOverview.pdf Possible implementation

New PSB beam control Interlocks (Annex) A. Blas PSB Beam Control 20/01/ version=1&p_tab=TAB1

New PSB beam control Interlocks (Annex) A. Blas PSB Beam Control 20/01/ version=1&p_tab=TAB1

New PSB beam control Interlocks (Annex) A. Blas PSB Beam Control 20/01/ version=1&p_tab=TAB1

New PSB beam control Interlocks (Annex) A. Blas PSB Beam Control 20/01/ version=1&p_tab=TAB1

New PSB beam control Interlocks (Annex) A. Blas PSB Beam Control 20/01/ version=1&p_tab=TAB1

New PSB beam control Interlocks (Annex) A. Blas PSB Beam Control 20/01/ version=1&p_tab=TAB1 Proposed solutions for the Beam permit reception