ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November 2014 - Lund Sébastien Bousson WP 4 leader.

Slides:



Advertisements
Similar presentations
ESS SPOKE LINAC (WP4) Sebastien BOUSSON Guillaume OLRY ESS/SPL Meeting - Lund – 2010/07/01.
Advertisements

2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Spoke Cryomodules (WP4) Guillaume OLRY (CNRS/IPN Orsay) WP4 Deputy Leader April 21, 2015.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
ESS Spoke Cryomodules: QA / QC Plans Workshop on Requirements Conformance for SRF Cryomodules, 15 th -16 th October 2014 Denis Reynet, Veronique Poux Sebastien.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
The ESS Linear Accelerator
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Spoke test in vertical cryostat IPNO-UU Meeting on spoke test program, 2 nd -3 st October 2013 IPNO Team.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Spoke Cryomodules Sébastien BOUSSON (IPNO), Christine DARVE (ESS) On behalf of the CNRS/IPNOrsay and ESS teams April, 2016.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
Mnemonics Using letters to make up phrases that help you remember.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
EURISOL CB MEETING – PSI – 15 JUNE 2006 Sébastien Bousson IPN Orsay – Accelerator Division TASK 8 STATUS REPORT INFN – Legnaro IPN Orsay.
Status of the French-Swedish Cooperation Agreement 10 th Oct, 2012 Christine Darve.
ESS Program Plan and Schedule Update
Status of the M-ECCTD F. Peauger - P. Bosland
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
WP5 Elliptical cavities
Medium beta cryomodule demonstrator M-ECCTD
CSP 25th November 2010 Technical agreement number 3: overview
Cryogenic C&C Scope of work
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Centralized Classroom and Event Scheduling: Fall 2018
Centralized Classroom and Event Scheduling: Summer 2018
13-block rotation schedule
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
McDonald’s Kalender 2009.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
PBIS Update November 2005.
2300 (11PM) September 21 Blue line is meridian..
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
April May April May June July July June August Sept August
McDonald’s calendar 2007.
Status of the CNRS Contribution to the ESS Accelerator
Teacher name August phone: Enter text here.
Prototype cryomodule development
Overall time schedule of SRF activities
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
XFEL cryomodule production and Reliability improvement
CNRS contribution to ESS – 01/02/17
MONTHS OF THE YEAR January February April March June May July August
Prototype cavities development
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke The ESS construction plan for the spoke cryomodules is relying on the following : A spoke prototype cryomodule tested at full RF power in Uppsala (in end 2015) premises to check 95% of the required performances A set of procedures (cavity preparation, cavity string assembly, cryomodule assembly) defined and tested during prototyping phase (2014 – 2015). A 6 months time available between experimental results on cryomodule and start of series production for a “design adjustments” (i.e. mainly mechanical slight modifications to potentially improve or facilitate cryomodule assembly): between 1 st nov & 30 th April 2016

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke 1.Niobium procurement & lead time Scheduled between March 2015 and Sept Several suppliers world wide Niobium for prototype is from Tokyo Denkaï Order all niobium for spokes in one single procurement Supplier strategy: only 1 (for the ~ 4 tons of Nb) Spare strategy: to be defined, but it will probably be a low percentage (i.e equivalent to 1 more cavity). Questions: - Any potential gain (cost) to group with niobium supply for the elliptical part ? → probably not, so it is not foreseen to group.

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke 2.Spoke cavity procurement & lead time Scheduled between Feb and Feb Several companies world wide, several in Europe (3) Reminder: Prototypes from SDMS (Fr) and Zanon (It) Order the 26 spoke cavities in one single procurement Supplier strategy: - only 1 (preferred scenario) – it’s cost effective & less required work for fabrication follow-up - 2 contractors is of course possible, but no clear advantages (not necessary for schedule reasons for instance) Spare strategy: no spare, as decided by ESS Allocated production lead time will allow 2 phases: - a pre-production (2 or 4 units) to check production processes and quality, constituting a Go/NoGo for phase 2. - a series production for the remaining (22 or 24) units

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke 3.Spoke power coupler procurement & lead time Scheduled between May 2016 and February 2018 Several companies world wide, several in Europe Reminder: prototypes from SCT (Fr) and PMB (Fr) Order the 26 power couplers in one single procurement Supplier strategy: - only 1 (preferred scenario) – it’s more cost effective & required less work for fabrication follow-up - 2 contractors is of course possible, but no clear advantages (not necessary for schedule reasons for instance) Spare strategy: no spare, as decided by ESS Allocated production lead time will allow 2 phases: - a pre-production (2 or 4 units) to check production processes and quality, constituting a Go/NoGo for phase 2. - a series production for the remaining (22 or 24) units

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke 4.Spoke cold tuning system procurement & lead time Scheduled between June 2016 and Dec Several companies world wide (but very limited for motor and piezo) Order the 26 CTS in one single procurement Supplier strategy: only 1 Allocated production lead time will allow 2 phases: - a pre-production (2 or 4 units) to check production processes and quality, constituting a Go/NoGo for phase 2. - a series production for the remaining (22 or 24) units Spare strategy: no spare, as decided by ESS

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke 5.Cryomodule parts procurement & lead time Scheduled between July and Déc Several companies world wide, several in EU Order the parts for 26 cryomodules in one single procurement Supplier strategy: only 1 Spare strategy: no spare, as decided by ESS

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke A.Cavity preparation and test Scheduled between 1 st March 2017 and 31 st June 2018 Preparation (chemical etching, HPR & clean room assembly) and tests in VT at IPNO premises - Corresponds to 1 VT (and 1 preparation) per 17 days Under study: a new VT for testing 2 cavities at the same time to double the test rate B.Power coupler preparation and RF conditioning Scheduled between 1 st Dec and 28 th Feb 2018 Preparation and RF conditioning in IPNO premises - Corresponds to a conditioning rate of less than one coupler pair per month (as 1 week conditioning time is foreseen, we have margin here)

 S. Bousson, WP4 Strategy for series production, ESS TAC10 – 5 th – 6 th November Lund Construction plan for the spoke C.Cryomodule series assembly Scheduled between 1 st May 2017 and 30 th October 2018 Corresponds to a rate of 1 cryomodule assembled per 5.5 weeks 2 scenarios under study - Assembly (in and out clean room) to be done by industry at IPNO premises (most probable scenario) - Assembly (in and out clean room) to be done by industry at the company premises Last spoke cryomodule delivered to ESS on Xmas of 2018 ! D.Spoke cryomodule tests at high power in Uppsala Scheduled between 1 st August 2017 and Dec Corresponds to a test rate of one cryomodule per 1.3 month