MALĒ DECLARATION NETWORK MEETING TEHRAN,IRAN Oct. 11-12,2004 Progress Review By C.K.Amaratunga NIA-SRI LANKA.

Slides:



Advertisements
Similar presentations
<<Date>>
Advertisements

Pay-For-Performance in Oklahoma The Oklahoma Experience Presented by: Richard McKay Petroleum Storage Tank Division.
Why do we lose analyzer data? Monitor malfunction DAS malfunction Power outages Environmental problems Wildlife damage Vandalism Operator error.
TECH Project Title Payroll Fund Analysis Phase Date:12 Nov, 2013 Team members: Matt Unger.
1 Climatographs. 2 How to Read a Climatograph:  Every place on Earth has weather.   However, different places on Earth have different types of "typical"
Famine Early Warning Systems Network CURRENT CLIMATE SITUATION AND FORECAST June 16 Kabul, Afghanistan.
Ticket to Work: All EN Payments Call Part III Tuesday, August 27, 2013.
Eighteen Years of Acid Wet Deposition at Mt. Mansfield Goals & Objectives One goal of the VMC is to understand the sources, mechanisms, and effects of.
1 WP1 Technical Overview Progress since last meeting Budapest 24 – 25 th November 2004 Mike Fitch, BT.
It’s Getting HOT! HOT! HOT!
Male’ Declaration Report on the progress since the Seventh Session of the Intergovernmental Meeting by Secretariat UNEP RRC.AP.
Malé Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Presentation on the Bangladesh National.
Fresh Fruit and Vegetable Program SY Grant Training Module 2.
Male’ Declaration by Secretariat UNEP Progress in 2007.
IMPLEMENTATION OF MALÈ DECLARATION ON CONTROL AND PREVENTION OF AIR POLLUTION AND ITS LIKELY TRANSBOUNDARY EFFECTS FOR SOUTH ASIA SITUATION IN SRI LANKA.
“End of Year Review” All EN Payments Call
The Malé Declaration Monitoring and Data reporting 2008/09.
Department of Meteorology Maldives Implementation of Male’ Declaration on Control and Prevention of Air Pollution and its Likely Transboundary Effects.
International Centre for Integrated Mountain Development Kathmandu, Nepal Malé Declaration Implementation in NEPAL Pradeep Dangol.
MALÈ DECLARATION ON CONTROL AND PREVENTION OF AIR POLLUTION AND ITS LIKELY TRANSBOUNDARY EFFECTS FORSOUTH ASIA By R.N.R.Jayaratne Senior Environmental.
MALÈ DECLARATION ON CONTROL AND PREVENTION OF AIR POLLUTION AND ITS LIKELY TRANSBOUNDARY EFFECTS FOR SOUTH ASIA ANNUAL NETWORK MEETING-2005 NEW DELHI BY.
The Duke of Edinburgh’s Award 2015 Oakgrove School.
The Male’ Declaration Data reporting September 2007.
Audits performed during Karin Sjöberg IVL The Refresher Training Programme for Malé Declaration Monitoring March 2008 AIT, Bangkok, Thailand.
Malé Declaration - UNEP Data Analysis Report December 2012.
AMFUCoimbatorePalampurJothpur LocationCoimbatore Kangra Kullu Jothpur Crop – RainfedSorghumWheat 1.Preal millet 2.Clusterbean Crop – IrrigatedMaize - Rice.
MANAGING Tough Times Irrigation 101 Maximizing the value of Irrigation Kris Kohl ISU Extension Ag Engineer.
International Centre for Integrated Mountain Development Kathmandu, Nepal Emission Inventory of Nepal for the Year 2005.
Malé Declaration Report on the Progress of. Malé Declaration: Phase IV Objectives Malé Declaration/IG11/2/1 1. Strengthen Regional Cooperation for addressing.
Malé Declaration on Control and Preservation of Air Pollution and its Likely Trans-boundary Effects for South Asia Presentation on Monitoring Activity.
Training Program and Refresher under the Malé Declaration Country Report: Pakistan By: Muhammad Ahmad Khan (Manager/DeputySecretaryMinistry of Climate.
Line Graph- a graph that uses a line to show the relationship between two sets of data. Line graphs show how data changes over time.
1 Climatographs. 2 How to Read a Climatograph:  Every place on Earth has weather.   However, different places on Earth have different types of "typical"
Malé Declaration Joint Training on Regional Refresher Course and Soil Acidification Asian Institute of Technology (AIT), Bangkok, Thailand from
Sulfate Ion Wet Deposition
Ammonium Ion Wet Deposition
Inter-laboratory calibration of Male’s monitoring network: preliminary findings Kim Oanh N. T. EEM/SERD, AIT Male’ Declaration Refresher course March 25-28,
UNEP/EAP-AP Data Reporting UNEP RRC.AP. CONTENTS  NEED FOR HIGH QUALITY DATA  DATA REPORTING  DATABASE MANAGEMENT SYSTEM UNEP RRC.AP.
INDOFLUX NETWORK POSSIBLE CONTRIBUTION OF RRL BHUBANESWAR DR. G. ROY CHAUDHURY SCIENTIST REGIONAL RESEARCH LABORATORY, BHUBANESWAR.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. Status.
Male’ Declaration Male’ Declaration Work Programme for 2010 by Secretariat UNEP.
IN THE NAME OF GOD 1. IRAN Report Hamoun Station at East of Iran By: Reza Mirshekar Malé Declaration Joint Training on Regional Refresher Training Workshop.
The Male’ Declaration Progress Since Network Meeting 2005.
Phase II Malé Declaration on control and prevention of transboundary air pollution and its likely transboundary effects for South Asia Nepal Ministry of.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Implementation of Male’ Declaration on Control and Prevention of Air Pollution and its Likely Transboundary Effects for South Asia MALDIVES 12 – 13 September.
1 OUTLINE OF THE NATIONAL MONITORING PLAN FOR THE PHASE II OF MALE DECLARATION SRL LANKA by Anura Jayathilake & C.K.Amaratunga.
Annual Network Meeting:2004 Male Declaration of on Control and Prevention of Air Pollution And Its Likely Transboundary Effects for South Asia Project.
Order Instituting Rulemaking (OIR): Customer Electric & Natural Gas Service Disconnection Issues OIR Update Low Income Oversight Board Meeting September.
By Alexandra Mercurio. Climate Overview The main seasons are dry and wet, during the rainy season the savanna is lush and rivers typically overflow and.
Accruals & Prepayments. Example The rent for the office is £6,000 per annum The business pays £5,000 in the year and therefore owes £1,000 for rent. (Accrued.
Regional Stakeholder’s Meeting on Male Declaration NEW DELHI 2005 by C.K.Amaratunga SRI LANKA
Male’ Declaration Networking Meeting 13 October 2005 New Delhi Nedup Tshering National Environment Commission NIA/IA October 2005.
Between November and April Antananarivo (Madagascars largest city) receives 55.1 in of rain. I would have thought there would have been more but the facts.
225 square miles 20 inches/yr rainfall From the Main Street Bridge, Ventura River: Feb. 2, 2005 (above), Oct. 2, 2004 (below) looking downstream.
Ticket to Work Program Payment Processes. Course Objectives Identify the three criteria needed for standard payment Describe the split payment process.
The Malé Declaration Monitoring and Data reporting 2008.
1 Hydrological Regime of the Mekong River Hydrological Regime of the Mekong basin depends on climatic conditions of the wet and dry seasons. High water.
Be able to describe the Ancient civilization and it’s achievements.
Department of Meteorology Maldives Implementation of Male’ Declaration on Control and Prevention of Air Pollution and its Likely Transboundary Effects.
Passive sampler inter - comparison study for the Malé Declaration Options open to the Malé Declaration: 1.Laboratory in the region registered to analyse.
A checking account is an account held at a bank or credit union into which account owners deposit funds.
Outline and Objective of MSME Survey (2017)
Calibration in the Ambient Air Quality Monitoring Network
National Trade Union Federation Lanka Jathika Estates Workers’ Union
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Wet deposition trends in Sweden during 1955 – 2011
The Steam Jet Aerosol Collector SJAC
Presentation transcript:

MALĒ DECLARATION NETWORK MEETING TEHRAN,IRAN Oct ,2004 Progress Review By C.K.Amaratunga NIA-SRI LANKA

PHASE II MILESTONES MoU signed- End of May, 2002 In-country training & Equipment Received End of June, 2003 Passive Sampling Started on August 15, 2003 Wet Deposition Monitoring Started in November, 2003

PM 10 SAMPLING Trials have been carried out, found that leaks in the sampling system and rectified the problem However, PM 10 sampling at the site is yet to be continued due to the following facts; Non availability of a suitable power supply SO2 & NO2 very difficult to measure accurately as the concentrations are very low Do we need to monitor those using active sampling?

CONTINUOUS MONITORING We have conducted one week of AAQ monitoring with the use of continuous automated analyzers covering SW monsoon at Site from July 22-29,2004.

WET DEPOSITION MONITORING Since Nov.,2003 No QC/QA yet Problems Encountered; Non durability of plastic material of the lid and the funnel holder of the wet only collector in Sri Lanka’s climatic condition, mainly due to hot sunshine, the material became brittle. Spare lid provided also broken. We have managed with a local plastic plate Need spare lids at least one for every 03 months

BULK COLLECTOR PROBLEM ENCOUNTERED FUNNEL WAS BROKEN AT THE NECK DUE TO STRONG WIND AT THE SITE CONTINUING SAMPLING WITH THE USE OF SPARE FUNNEL NEED TWO SPARE FUNNELS

FINANCIAL ASSISTANCE We are now facing serious financial problem for the continuation We therefore kindly request to consider the balance payment considering the data collected sofar.

RAIN WATER ANALYSIS We are now paying much attention to the use of Ion Chromatograph for the rain water analysis The results sofar are given below;