When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.

Slides:



Advertisements
Similar presentations
Because the client has a need, We have a job to do;, Because the client has a choice, We must be the choice; Because the client.
Advertisements

HOT & COLD WATER SYSTEMS
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
Steps Toward Decent, Affordable Housing Habitat for Humanity in Amecameca, Mexico ©, 2006 © Scott Moore, 2006.
Surface Area & Volume of Prisms, Pyramids, Cones and Cylinders
SHOTCRETING K.V.SUBBA RAO.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Compiled by HV Kamdar. The kitchen from the outside ¬a three-storey building which uses Gravity Flow Mechanism developed in-house by our team. Each kitchen.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Why wait 110 days for your screed to dry when you have a choice of 7, 14 or 21 days?
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
Form screeds and granolithic finishes. Learning outcomes The purpose of damp proof membranes The recommended area of separate construction flooring that.
Story of a Cellar Conversion Click to start Slideshow.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
DONNING & REMOVING Personal Protective Equipment (PPE) for SARS
KOECH KIPLANGAT JOSEPH ADM NO 2012/BC/25432 CLASS 2012BCBC1B.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Spray Painting. Primer Paint A primer is a preparatory coating put on materials before painting. Priming ensures better adhesion of paint to the surface,
Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with.
Preparing & Exposing Photographic Silkscreens For use with Lesson 3 FOR EDUCATION USE ONLY ©2009 The Andy Warhol Museum, a museum of Carnegie Institute.
CONSTRUCTING A FIVE CABIN LATRINE
10 Energy Saving Advices. 1- Lowering of the temperature at night Limit the lowering of the temperature at night. If the temperature is reduced too much,
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
How to build a two storey house
Ben Craig, Operations Director 25 April 2013 DECC Fuel Poverty Project The Delivery Experience.
Insulation Ashfield Direct Learning Tim Gregorczyk Your Photo Will go Here! Ks4 Energy.
Site Report Poroton Home to Building shell – in record time.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Insulated rendering systems General Principles of Thermal Insulation.
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
WebQuest Example Picture of finished house here with a title.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
By, David Sessions. Buildings come in many shapes and sizes The tallest buildings in the city are called skyscrapers.
Plumbing Theory. DWV System The DWV Drain-waste- vent system in plumbing a system that removes sewage and greywater from the house/building and it also.
The Natural Pool To advance to the next slide, click your mouse button. To end the show, close the window.
A Guide to Solid Wall Insulation INSTALLATION. Surveys Properties need to be fully surveyed Is substrate suitable for mechanical fix? Is there sufficient.
Khulanathi “grow with us” Children’s home Khulanathi “ Grow with us”
The joiners fit all the internal doors. They have to cut out all the hinge positions and fix these in place as well as the locks and keepers and fit the.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Pool Schedule Delay. Pool Delays Pool phase began as scheduled on June 1 st. Removal of plaster revealed concrete degradation of the shell. Walls have.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Installing a Backflow Cage. Verify the Backflow and Area.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
VIA / TCU 5th semester workshop A2016 CASE 3: Multistory Building VIA University CollegeTCU-VIA Workshop – A20161 Wall elements.
Concrete Products Manufacturers in Dubai
Weber Tile Fixing.
CONCRETE AND SUSPENDED TIMBER
Objective 6.02 part 2: Recognize components of construction
CASE 2: Multistory Building
Substructure Construction Sequence
Progress Charts.
The Steps for Basement Renovations
Keeping a house warm heat moves from regions of high temperature to
Building Construction I Sofia Sebastian 1
International Building Materials and components
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Building Construction I Sofia Sebastian 1
MATERIALS AND CONSTRUCTION I
Floor screeding.
Name____________________________ Tutor Group _____
Apply Plaster Materials to Internal Surfaces
Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists.
CASE 3: Multistory Building
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
The blades.
Steps of Swimming Pool Construction in Adelaide Statewide Pools -
Timber Frame Panel with opening Typical panel comprises a series
Presentation transcript:

When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a DPM layer is put down which in turn is covered with four inches of insulation. A 100 mm concrete floor screed is then placed in position. After this has thoroughly dried the final fitting out of the house can begin

Plumbing second fix pipes

Radiators are also fitted now

Heavy duty DPM placed over the floor covering all pipes

Floor insulation with round the wall insulation in the bag as it arrives on site

100 mm of insulation placed over the DPM

Floor screed mix as delivered

Ready to be levelled inside

A finished floor. Note the insulation on the outside walls