Management hoo-hah Created short list for DPG coordinator (2014-2015) – Talked with several people to converge on the list – Tiziano now has the list and.

Slides:



Advertisements
Similar presentations
Never lose your data again!
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Introduction to Rational Rose 2000 v6.5 Copyright © 1999 Rational Software, all rights reserved 1 Rational Rose 2000 Interaction Diagrams.
18/05/2005Kamil Sedlak1 ATLAS Data Acquisition and Controls DAQ … data characterised by event and run number. DCS … data characterised by (valid for) some.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
TOOL MANAGEMENT INTRODUCTION
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
20 Oct 2009G. Rakness (UCLA)1 Powering on… Last week: CMS off to give evaporation time to dry out the experiment Monday – Tuesday: Began powering on CSCs.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Long-Baseline Neutrino Facility LBNF Summary of FSCF Final Design Parameters Meeting at SURF, 10 Aug 2015 Elaine McCluskey, LBNF Project Manager EFIG 19.
Software Engineering Management Lecture 1 The Software Process.
Objectives 4 Understand the importance of communication in projects 4 Understand the need and importance of project management.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
How could the CMS control room be improved? Greg Rakness University of California, Los Angeles.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Technical Support Activities in PH-ADO-PO
1 “Production Management Software for the Coal Industry”
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
Operational Planning Opening the House & Standard Operating Procedures.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Supplier Capacity Worksheet User Instructions September 2015 Revised December 2, 2015.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
LIGO-G Z Detector Characterization Summary K. Riles - University of Michigan 1 Summary of the Detector Characterization Sessions Keith.
Making Improvements Improve Kaizen Facilitation. Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run 
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Developing Kids Ministry Teams -pros and cons Prepared by Teachable Heart Ministries.
Coaching an Oregon Games Project Challenge team November 14, 2015 Peter Steinfeld –
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
New Employee Training Program
CMS livetime during last week’s runnin 11 Sep 2012G. Rakness (UCLA)1 Fills  1.02/fb delivered, 0.98/fb recorded 96.1% live ~2.4% not running.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Commissioning and run coordination CMS week Commissioning plenary 28-February 2007 DQM and monitoring workshop MandateGoals.
Follow-up to SFT Review (2009/2010) Priorities and Organization for 2011 and 2012.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Herff computers Classroom computers All outdated computers picked up Redistribution of left over computers. Classroom teachers to receive.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
Various Gave presentation at TIG meeting on p5 control room. Feedback included… Proposal should explicitly cover all phases of CMS operations Running.
LHC intervention scheduling with the Work Acceptance Tool
Draft of to institute heads
Software Engineering Management
Supporting quality devices
Oct 22 Group Leaders Planning meeting
FC facilitation of Installations
Performance Feedback Training
Publish Daily Schedule Prior to Work Execution
Systems Analysis and Design
HL-LHC upgrade at IPHC news
that focus first on areas of risk.
Joint Application Development (JAD)
Commissioning of the Ion Source and LEBT – Lessons Learned - Guidelines on preparation- Ciprian Plostinar.
Presentation transcript:

Management hoo-hah Created short list for DPG coordinator ( ) – Talked with several people to converge on the list – Tiziano now has the list and is going to chat with people/candidates Made Run Coordination organigrams – 6 distinct yet related areas, each with different lines of communication and responsibilities Level-1 manager Schedule coordinator (includes CMS Tech. Coord., LHC, commissioning) LHC interface Operations coordinator (includes commissioning, tools) Shift crews coordinator  the person who was [partially] doing this is leaving Detector Performance Groups coordinator – If I can write a clean job description of each part, it will be easier to… … delegate the tasks … request manpower 26 Aug 2013G. Rakness (UCLA)1

Found my mojo again… After ~1 month hiatus, working on control room again… Includes… – … input from CMS safety – … comments from the Technical Implementation Group – … workstations (with footprint) Managed to come up with proposal that fixes all problems, satisfies all constraints, and only involves moving around furniture we already have – Realized that in order to sell it, I need to make it cost $0.00 – Not sure if this means that I win, or they win… To be presented at… – Run Meeting tomorrow – TIG again – … then XEB… 26 Aug 2013G. Rakness (UCLA)2

To do Prepare Run Coordination talk for CMS Week in Taipei Follow up on… – VME PC replacement (subsystems) – Run Control improvements for 2015 (Hannes) Discuss with Christoph Schwick about... – How should we be planning to prepare for Run 2... starting now? Brainstorming session? Have each group assemble list of commissioning tasks? Recall what we did in ? All of the above? Pick up neutron note – Read it again… what all is left to be done? – Chad’s analysis documented here: Aug 2013G. Rakness (UCLA)3