Ray Karol 3/11/2013. Noteworthy Practices C-AD and Waste Management assessed relocation of pump out station of D-waste in 801 from outside to inside (for.

Slides:



Advertisements
Similar presentations
Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Contract CloseOut.
The Individual Education Plan (IEP) What is an IEP?  a summary of the student’s strengths, interests, and needs, and of the expectations for a student’s.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Waste Ban Compliance Training Program Administrative Compliance Requirements April and May 2006 Administrative Compliance Requirements April and May 2006.
Internal EMS Auditing at Naval Installations. 2 Title/Group/Section,etc. Navy EMS Overview  All “appropriate facilities” must implement an EMS that conforms.
Learning Objectives LO5 Document an accounting system to identify key controls and weaknesses in order to assess control risk. LO6 Write key control tests.
OSHA Program Implementation What types of OSHA programs do we need in a Museum Environment?
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
Regulatory / WDR Update What’s Going On?. Waste Discharge Requirements Adapted by the State Water Resources Control Board on May 2, 2006 Adapted by the.
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
MAAP Coordination Meeting Project Progress Update October 2012.
© 2000 International Risk Control America, Inc. Risk Management Presentation — 1 International Risk Control America IRCA
1 OSHA Hazard Communication Standard Occupational Safety and Health Standards for the General Industry OTI 501 LABEL MSDS HCP.
Developing a Chemical Risk Management Program
Management and Evaluation of Health and Safety in Workplaces.
PSC INSPECTION REPORT George W. Wakim, P.E.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Managing Risk in Office Buildings: An Insurer’s Look at Security and Emergency Preparedness Issues Brian D. Metcalfe Executive Vice President Bolton &
Copyright – Disaster Resistant Communities Group - Drill Overview.
Pre Incident Planning and Related Loss Reduction Strategies
Directed Inspection & Maintenance At Compressor and Gate Stations
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Type B Report - Draft Facts for Startle Hazard Event Collider-Accelerator Department Take 5 for Safety.
SELF INSPECTION BASICS Inspecting the Workplace. Purpose of Self Inspection To Identify Unsafe actions and Unsafe conditions.
Department of Innovation & Technology City of Boston Five Key Ways to Be a Successful Project Manager March 2014.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Programmed Inspections John Furman Occupational Nurse Consultant Dept. Labor & Industries.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
What is a Public Health Assessment? “The evaluation of data and information on the release of harmful substances into the environment in order to assess.
The Muscular System By: Justin. Organs  Skeletal muscles they help the body move.  Smooth muscles which are located inside organs such as the stomach.
THE CUTTING EDGE Assessment Deck YOUR CURRENT ASSESSMENT PROCESS CAN BECOME MORE EFFECTIVE, EFFICIENT, AND EASIER WHILE SAVING YOU TIME AND MONEY.
Making the Most of WebTMA GO
David Stanislav.  Blue Mountain Regulatory Asset Manager (BMRAM)  Facility noise mapping  Lyman shutdown  Misc. assignments ◦ Koorsen vendor during.
Brookhaven Science Associates U.S. Department of Energy RSVP Safety and Environmental Protection Issues E. Lessard Associate Chair for ESHQ Collider-Accelerator.
BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets.
Best Operating Practices for Reducing Emissions F rom Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources USA, Inc., and.
1 OSHA Hazard Communication Standard General Industry LABEL MSDS.
Conducting IH Exposure Assessments in CCA Operations Mike Cooley Eltaneice Bolden Bob Chapman.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Ray Karol 2/25/2014. BNL Work Planning Subject Area Subject Area revision to come out soon which requires permitted and worker-planned work to evaluate.
The Individual Education Plan (IEP)
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Lean Six Sigma DMAIC Improvement Story
THE SUPERFUND PROCESS Assessment and Listing
Psych 638: Training needs assessment
Teacher Evaluation Process
Academic Staff Appraisal (between March and September)
School Community Council Implementation Timeline Checklist
Lean Six Sigma DMAIC Improvement Story
Training Meetings TC 22-6 / FM SSG Millington
Lean Six Sigma DMAIC Improvement Story
Classroom Timeline. Classroom Timeline Industrialization Read Alouds.
Environmental Issues Mapping Field Lab
Project Management Processes for a Project
STATION FACILITIES INSPECTION
Administrator of Construction Todd Wilson Senior Project Manager
Optimization for Airport Facilities
Preparing for Ofsted.
Documenting, record keeping and reporting to stakeholders
Teacher Evaluation Process
Reporting on Sports News Gathering.
Network meeting 30th November Assessment, tracking and
In order to make progress over the next two lessons I will:
Marketing Planning Meeting Periodic Marketing Review
Presentation transcript:

Ray Karol 3/11/2013

Noteworthy Practices C-AD and Waste Management assessed relocation of pump out station of D-waste in 801 from outside to inside (for spill management) C-AD evaluation of lessons learned from CERN cryogenic leak creating an oxygen deficient atmosphere: updated FRAs, Objectives & Targets and operational controls C-AD making good progress gathering info to develop fact sheets on 49 historical beam loss locations in case they are ever decommissioned C-AD conducts a review of noise areas and postings every 2 years (required every 3 years)

Opportunities for Improvement Consider incorporating C-AD fact sheets on historical beam loss locations into FUA’s Determine retention schedule and assign records management responsibility for C-AD soil activation cap inspection checklists and maintenance records Document cap condition with date-stamped photos and attach to inspection checklists

Opportunities for Improvement Update maps of beam loss locations with potential for soil activation and show areas that have been capped Formally transfer BLIP inspection records from Medical Dept. to C-AD