Chapter 109 Safe Drinking Water Fees November 16, 2010 Bureau of Water Standards and Facility Regulation.

Slides:



Advertisements
Similar presentations
Findings from the 2008 National Profile of Local Health Departments Study Illinois Local Health Departments.
Advertisements

IDEM Drinking Water Program Water Resources Study Committee.
David Edmunds Environmental Program Specialist Drinking Water Program Department Of Environmental Conservation Drinking Water Watch.
Hayward Water System Public Health Goal Report Alex Ameri, Deputy Director of Public Works Utilities Division Department of Public Works.
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
PARKS: Major Policy Topics  Park development guidelines  Joint use of park and recreation facilities  Park accessibility  Park acquisition priorities.
Implementing Medicaid Behavioral Health Reform in New York February 13 th 2014 Redesign Medicaid in New York State.
Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Water System Regulation and Planning Regina Grimm, P.E.
Nathan Saunders, P.E. Maine Drinking Water Program Public Water System Owner & Operator Responsibility.
Bruce Burton, Assistant Deputy Director Karen Larsen, Assistant Deputy Director Division of Drinking Water State Water Resources Control Board.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
Presented to: DHS Board of Directors Date: April 15, 2015 DHS Legislative Update Georgia Department of Human Services.
Identification & Distinction of Clinical Trial Participant Charges Bethany Martell Office of Clinical Research Associate Director- Financial Operations.
Office of Child Development & Early Learning Tom Corbett, Governor | Ronald Tomalis, Secretary of Education | Gary D. Alexander, Secretary of Public Welfare.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
1 Underground Injection Control (UIC) Program Rules.
Presented by Dwain Butler District Director of Environmental Health Southeast Health District Waycross, Georgia.
After the Sanitary Survey
Community Benefit Yvette Meléndez VP, Government and Community Alliances.
Mississippi State Department of Health
Massachusetts Department of Environmental Protection Drinking Water Program Anita Wolovick MassDEP, Environmental Analyst 2011 Spring Training Information.
Ground Water Rule Workshop Department of Environmental Conservation September 22-23, 2009 Dan Weber & Gloria Collins Regulations Team DEC Drinking Water.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Policies and Procedures for Summer Supplements on Federal Awards April
1 DOVER SHERBORN REGIONAL SCHOOL DISTRICT FY10 BUDGET PRESENTATION.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Victor E. Pisani, Acting Director and Claudine Jones Rafferty, Field Coordination October 26, 2011.
All About Sanitary Surveys David Edmunds Environmental Program Specialist ADEC Drinking Water Program Sustained Compliance: What It Means to Public Water.
Water Quality Compliance California Water Association.
Water System Consolidation and Restructuring Scott Torpie Washington State Department of Health Drinking Water Advisory Group November 3, 2014.
Environmental Fees January 2007 Thomas W. Easterly, P.E., DEE, QEP IDEM Commissioner.
Revised Total Coliform Rule Sandy Brentlinger Southwest Drinking Water.
1 TCEQ Drinking Water Sample Collector Training October 2006 Alicia Diehl TCEQ Public Drinking Water Section UCMR Sampling TCEQ Drinking Water Sample Collector.
University of Texas at AustinMichigan Technological University 1 Chapter 3: Environmental Laws and Regulations David Shonnard and David Allen Department.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
Not all changes will be discussed please view all regulations at
Federal Updates Presented by Becky A. Kurtz Director, Office of LTC Ombudsman Programs NALLTCO Member Meeting – November 16, 2014.
Indian & Northern Affairs Canada March 10, 2010 On-Site Water and Wastewater Systems - First Nations Water Symposium Matthew Hough, P.Eng. Infrastructure.
1 Indiana Department of Environmental Management Budget Presentation FY
EQB Presentation December 18, Radiological Health Proposed Fee Rule David J. Allard, CHP Director, Bureau of Radiation Protection.
Chapter 92a Fee Amendments Proposed Rulemaking Water Resources Advisory Committee Harrisburg, PA March 24, 2016 Tom Wolf, GovernorJohn Quigley, Secretary.
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
SAFE DRINKING WATER GENERAL UPDATE TO CHAPTER 109 June 19, 2007 Bureau of Water Standards and Facility Regulation.
Noncoal Program Fees Environmental Quality Board April 17, 2012 John Stefanko Deputy Secretary for Active and Abandoned Mining Operations.
APPR Updates Office of Teacher/Principal Quality and Professional Development.
Environmental Health Service Learning and Water Quality in Gales Point, Belize International Health and Human Service Learning Program Belize 2009 College.
Chapter 302 Three-Year Regulatory Fee and Program Cost Analysis Report Environmental Quality Board Harrisburg, PA November 19, 2013.
Safe Drinking Water Act of 1974 By: Blake Burch. This act was enacted by the 93 rd United States Congress in 1974 and signed into law by Gerald Ford.
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
Proposed Rulemaking Chapter 109 (Safe Drinking Water) Disinfection Requirements Rule Citizens Advisory Council Meeting April 19, 2016 John Quigley, SecretaryTom.
Drinking Water Source Protection Action Kit
Environmental Quality Board
Preventing Exposure to Lead in Drinking Water
Environmental Quality Board April 16, 2013
Consideration of Final Rulemaking
Planning Commission Hearing
Triennial Review of Water Quality Standards Proposed Rulemaking
Public Comment Webinars January 14, 2015 and January 15, 2015
Kentucky Lead Workgroup Recommendations
Health Facilities & Emergency Medical Services Division
Annual Inspections of First Nation Water and Wastewater Facilities
Public Hearing Sanitary Sewer Fees
Preventing Exposure to Lead in Drinking Water
28 NOVEMBER 2018 PRIVATE HEALTH ESTABLISHMENTS
Annual Enforcement Report Overview
A FRIENDLY REMINDER ON OTC DRUGS. DRUG REGULATIONS IN THE PHILIPPINES.
General Fee Schedule Annual Update Fiscal Year 2015
Part II Objectives Describe how policies and procedures are used
Presentation transcript:

Chapter 109 Safe Drinking Water Fees November 16, 2010 Bureau of Water Standards and Facility Regulation

Drinking Water Program Facts No. of Public Water Systems = 9,400  Ranked 4 th in Nation PA pop served by PWSs = 10.7 M Drinking Water complement = 197  Field Operations complement = 155 o Number of sanitarians = 67 o Number of PWSs per san = 140

Regulatory Agenda  17 New regulations since 1996  Future Regulations:  Total Coliform Rule Revisions  Distribution System Rule  Radon Rule  Lead and Copper Rule Long Term Rev.  Emerging Contaminants

Environmental Program Management Fiscal YearFunding ($1000) $ 36, $ 39, $ 41, $ 32, $ 29,357

Purpose of Proposed Fees  Protect public health.  Supplement state costs for administering the Drinking Water Program.  Ensure state and federal program commitments are met and primacy is retained.

Workload Analysis For each activity, a template was created with standard hours per output. For the most part, the outputs are objective – based on state or federal mandates or policies. For example:  DEP must conduct a sanitary survey at all CWSs every 3 years.  A sanitary survey (or full inspection) at a small CWS takes 22.5 hours. This includes the time to prepare/review files, conduct the inspection, and write the final report. Each region completed the template using the appropriate numbers (i.e., # PWSs in the region, etc.). The final numbers were tallied by CO to determine the workload and number of FTEs needed.

Workload Analysis Results SERONEROSCRO Total Program Hours43, ,98182,082.5 Calculated FTEs Complement FTEs Difference NCROSWRONWRO Total Program Hours38, , , Calculated FTEs Complement FTEs Difference

Workload Analysis Impact  The workload analysis supports a return to the pre-furlough complement.  The proposed sanitarian complement will lower the PWSs/san ratio from 140 to 125.  Total complement = 197

Positions Included in Fees PositionCOSERONEROSCRONCROSWRONWRO Clerical Data Chemist Engineer Manager EPCS0 3 (2) 2 (2) 5 (4) 4 (3) 2 (2) Hydro110 3 (2) 210 San0 8 (2) 23 (5) 19 (3) 9 (1) 8 9 (2) WPS TOTAL

Fee Comparison - Other States Pop # Prop PA ServedConnFeesDE OHNJRISCVA 259$300 $50 $112 $120 $330 $113 $ $500 $50 $112 $120 $330 $561 $ $1,500 $250 $534 $120 $417 $1,600 $570 3,3001,222$5,000 $500 $2,346 $720 $1,833 $5,336 $2,505 10,0003,704$10,000 $1,000 $5,482 $720 $5,556 $9,556 $7,593 50,00018,518$30,000 $2,000 $20,370 $1,580 $27,777 $27,716 $37, ,00037,037$50,000 $3,000 $38,518 $1,580 $32,500 $33,568 $74, ,00045,052$60,000 $3,000 $46,854 $1,580 $32,500 $35,572 $90, ,00059,259$60,000 $3,000 $54,518 $3,280 $32,500 $39,448 $121, ,00092,592$60,000 $3,000 $85,185 $3,280 $32,500 $44,448 $160, ,000244,444$60,000 $3,000 $185,777 $3,280 $32,500 $62,503 $160, ,000303,704$60,000 $3,000 $230,815 $3,280 $32,500 $68,429$160,000 1,600,000592,593$60,000 $3,000 $450,371 $3,280 $32,500 $97,318$160,000

Example: Fee per Connection  Total population = 10.7 M  Total # connections = 10.7 M / 2.7 = 4 M  Need $7 M from CWS fees  $1.75 / connection  Examples: Pop#ConnectionsFeeService Cost% of Cost 259$15.75$1, % 12546$80.50$1, % $486.50$1,67029% 3,3001,222$2,138.50$1,825117% 10,0003,704$6,482.00$1,980327% 50,00018,518$32,406.50$3,400953% 100,00037,037$64,814.75$4,5001,440% 120,00045,052$78,841.00$4,5001,752% 160,00059,259$103,703.25$4,5002,305% 250,00092,592$162,036.00$4,5003,601% 660,000244,444$427,777.00$4,5009,506% 820,000303,704$531,482.00$4,50011,811% 1,600,000592,593$1,037,037.75$4,50023,045%

Example: Fee per Connection  Other examples: FacilityPop# ConnectionsFee Nursing home301$1.75 Nursing home4001$1.75 Prison2,4881$1.75 University7,9501$1.75 Resort1,0014$7.00  How should we define the # connections for non-conventional CWSs to ensure an equitable assessment of fees?

Comparison of Two Options Option #1Option #2 Pop#ConnectionsPop-based FeeConnection-based Fee 259$300$ $500$ $2,000$ ,3001,222$2,000$2, ,0003,704$10,000$6, ,00018,518$25,000$32, ,00037,037$50,000$64, ,00045,052$60,000$78, ,00059,259$60,000$103, ,00092,592$60,000$162, ,000244,444$60,000$427, ,000303,704$60,000$531, ,600,000592,593$60,000$1,037,037.75

Summary Revisions required to maintain an adequate funding source to retain primacy Revisions will ensure that only people who receive public water will pay for the administration of the Safe Drinking Water program The Department recommends that the EQB approve the proposed revisions with a 30-day public comment period