Multi-Droplet Combustion Apparatus (MDCA) Training Strategy Team #1 P T A E A E S T I S A N O I T A N R T O N L I N C D O P E R A O Y L A P A T I O N S.

Slides:



Advertisements
Similar presentations
ISIM Integration & Test Mike Drury JWST-PRES
Advertisements

PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
ESC/EN Engineering Process Compliance Procedures August 2002.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Server Virtualization: Navy Network Operations Centers
GLAST Large Area Telescope:
3 rd Party Registration & Account Management SMT Update To AMWG March 25, 2015.
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
June 081 Competent Learner Model Overview. June 082 Today you will learn… What is the CLM What is the goal of the CLM What are the foundations of the.
June 081 Competent Learner Model Overview. June 082 Today you will learn… What is the CLM What is the goal of the CLM What are the foundations of the.
 Advanced Metering Working Group (AMWG) Update to RMS 1 August 5, 2014.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
WebScan Change Order. WebScan change order: What is it? Beginning in 2010 changes to a WebScan order will need to be submitted via a WebScan change order.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
3 rd Party Registration & Account Management JDOA Update To RMS October 28, 2014.
Windchill PCS Overview for Engineers Product Cost System Overview for Engineers 03Sep2008.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
3 rd Party Registration & Account Management SMT Update To AMWG February 23, 2016.
Project Close Out Insert project name Presented by: name and title Date.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Texas Nodal Program ERCOT Readiness Update TPTF May 5, 2008.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
Crew Operations Team Alexia R. Matthews Cold Stowage CPE (256)
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Status Increment.
Note: The first status check should occur on the launch flight day prior to crew pre-sleep. This is the only feedback the Glacier team has that the Glacier.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
INTERNATIONAL SPACE STATION Kathy Nordmann Payload Crew Training 18 January 2005 TRAINING and CREW OPERATIONS.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
INTERNATIONAL SPACE STATION PTC Process Flows August 17, 2007 Robert D. Blum Payload Capability Training Lead
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
1 TIM #1-3 Ben Murphy Dispositif Pour l’Etude de la Croissance et des Liquides Critiques (DECLIC) November 12, 2003.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
1 INTERNATIONAL SPACE STATION Sally Robinson TIM #1-2 Crew Training Curriculum Development/ PTU Planning Coarsening.
Increment 25/26 Cube Lab Ops TIR Overview Oct. 6, 2010 Four* new Modules (3 Aluminum Modules, 1 LMA pack) MSFC Ops Lead: Andrea Wade,
Standard Design Process Overview
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
National Aeronautics and Space Administration (NASA) Glenn Research Center SAMS KU Forward Lessons Learned 1 Kevin McPherson NASA GRC Payload Operation.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
EnergySTEP1 Data Center Assessment: After the Sale How to Present the Customer Report How to Follow up on Sales Opportunities.
Date: FD35 Page: 1 Agricultural Camera (AgCam) TIM #1-1 TST Introduction and Payload Training Overview Wade Stevens Flight Projects Directorate TBE/FD35.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Relocation Services and Equipment Modification Services
Bill Raynor Naval Research Lab
Software and Systems Integration
5/24/2017.
Tracker I-9 Upgrade November 2017.
Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.
Presentation transcript:

Multi-Droplet Combustion Apparatus (MDCA) Training Strategy Team #1 P T A E A E S T I S A N O I T A N R T O N L I N C D O P E R A O Y L A P A T I O N S Name:Wade Stevens Phone#:(256)

Objective To provide to the TFI the Training Strategy Team’s Plan of the crew’s payload or experiment training requirements and how the training will be accomplished.

Agenda TST ParticipantsSE Payload Hardware Overview PD Payload Operations Overview PD Crew Training CurriculumSE/PD PTC Training Readiness Status/Schedules SE/PD Crew ProceduresPODF Crew DisplaysPDRT Issues and Concerns SE SummarySE

Participants Gary CarteeIncrement 9 TFI Chris DaileyCrew Representative Angie AdamsMDCA Instructor/PD Rep Brenda WagnerCrew Procedures Joe FittipaldiCrew Displays Wade StevensSim Engineer

Payload Hardware MDCA CIA (Chamber Insert Assembly) Electrical Connectors Cooling Connectors Fuel Reservoirs Shroud Plates Locking Mechanism Fiber Arm Needles Igniter Tips Fuel Reservoirs Rail Brake Internal Apparatus of the CIA

Payload Hardware MDCA Avionics Package Avionics Handle Avionics Package Cover Guide Pins Electrical Connectors Circuit Breakers Captive Screws

Payload Operations Nominal Operations –Payload operations commanded and monitored from GRC TSC –Performed with little or no crew involvement Crew Operations –Configuration, installation and removal of CIA –Installation and removal of Avionics Package –Replacement of consumables »Fuel Reservoirs, Needles, Fiber Arms, FOMA Bottles, Igniter Tips –Configuration of CIR Rack »Diagnostic Packages, FOMA Bottles, and Adsorber Cartridge

Crew Training Curriculum MDCA Instructor –Angie Adams  Will be certified to train MDCA at completion of PTDR Lessons –MDCA Nominal Operations Hours –MDCA Maintenance Operations Hours CBT –Nominal Operations –Maintenance Operations OBT –Malfunction Operations/ORU Replacement

Training Materials Readiness Training HardwareSE –Physical fidelity PTU –Will be unpowered –Will be located with CIR in the SVMF/PDL II –Scheduled for delivery »To GRC7/12/04 »To JSC7/26/04 Training Materials StatusSE –Payload Lesson Training Plan - »Preliminary Version is Complete »Will be updated –Training Courseware - In Work PTDR StatusSE –Ready-For-PTDR date is 8/1/04

Crew Procedures Approximately 25 procedures are required for Usability and Training –95% have already been received and are being validated by PD –Remaining are being developed and validated by PD Pre-Usability checkout will be conducted for all procedures Usability Test scheduled at GRC week of 21 June 04 –Usability Test will be accomplished using the Flight Unit –Any testing not finished that week will be completed JSC AT at a later date using the Payload Training Unit (PTU)

Crew Displays MDCA does not have any nominally-accessed displays MDCA displays are 95% complete PDRT rep saw demo of current displays on 3/2/04; minor issues Requested/awaiting static screen shots of current displays from developer Displays executable file was delivered to PDRT MDCA Usability Test scheduled for 6/21/04 Not usability testing displays

Items of Interest/Concerns International Procedure Viewer (iPV) status is uncertain MDCA must accomplish a Training Readiness Review (TRR) with the SSMTF before the MDCA PTU can be used in Bldg 9

Summary Other Issues –PDL - Training Data Set Complete –PLCR - Complete and available for signature Actions