Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Advertisements

This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Paul Chu FRIB Controls Group Leader (Acting)
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.
Elder Matias CLS Control System Recent Upgrades. Major Changes Synchrotron Upgrade New Isotope Production Linac EPICS Software –Python EDM –Aquaman –ScienceStudio.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Control System Studio: An Integrated Toolset Kay Kasemir, ORNL/SNS CS-Studio, 2014 FRIB1.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
4.0 Accelerator Physics & Pre-operations (1.10) Phil Martin, Stan Ecklund, Rick Baartman & Peter Limon 4.1Accelerator Physics Findings The hot spare.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
IRMIS Status EPICS 2009 Vancouver D. A. Dohan. Outline IRMIS hardware model cable/cable run channel list Equipment Inventory System RDB Domain separation.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
Elder Matias, Diony Medrano, Dong Liu (At Michigan State University - Nov 2011) IRMIS at CLS.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
DISCS - Distributed Information Services for Control Systems
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
Operational Demands of ReA3 at NSCL “Adapting to Change” WAO 2012, Stanford University Jon Bonofiglio August, 7 th, 2012.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Controls & Monitoring Overview J. Leaver 03/06/2009.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Nuclear Data at Michigan State University National Superconducting Cyclotron Laboratory Facility for Rare Isotope Beams.
Connecting LabVIEW to EPICS network
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
B. Dalesio, N. Arnold, M. Kraimer, E. Norum, A. Johnson EPICS Collaboration Meeting December 8-10, 2004 Roadmap for IOC.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Facilities Working Group Jiansong Wang, Yan Zhang, Xiaodong Tang, Xiaohong Zhou, Wanpeng Tan, Jianjun He, Georg Bollen.
Control System Considerations for ADS EuCARD-2/MAX Accelerators for Accelerator Driven Systems Workshop, CERN, March 20-21, 2014 Klemen Žagar Robert Modic.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
ICS WP3 – Software Core Components Suzanne Gysin Work Package Lead November 25, 2014.
An Introduction to Epics/Tango Steve Hunt Alceli EPICS Meeting 2008 INFN Legnaro 15 Oct 17:15.
ESS Integrated Control System Software Core Components S.Gysin
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
DOE Accelerator Safety Workshop 2017 Bob Lowrie
Design of a General Purpose I/O Controller for Particle Accelerators
SNS Status Report Karen S. White 10/15/08.
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Getting Started with EPICS A lecture Series
The EPICS running envirionments in the five accelerator projects
Low Level RF Status Outline LLRF controls system overview
Low Level RF Status Outline LLRF controls system overview
Rack installation and local tests for the MEBT Chopper Rack
LCLS-II Operations in LERF
Presentation transcript:

Welcome to Michigan Welcome to MSU/FRIB Welcome to the Spring 2015 EPICS collaboration meeting Welcome! L.T.Hoff, Slide 1

LOC PC Support Local Committees and Support L.T.Hoff, Slide 2 If you have any questions or issues while you are here, please see me or one of these folk for help.

Funded by DOE–SC Office of Nuclear Physics with contributions and cost share from Michigan State University Serving over 1,400 users Key feature is 400 kW beam power for all ions (e.g. 5x U/s) Separation of isotopes in-flight provides Fast development time for any isotope All elements and short half-lives Fast, stopped, and reaccelerated beams Facility for Rare Isotope Beams A Future DOE-SC National User Facility L.T.Hoff, Slide 3

What FRIB will look like in 2 years L.T.Hoff, Slide 4 NSCL experimental area to be enhanced for FRIB

LINAC tunnel construction complete RF coax installed Emphasizing ion-source building in support of commissioning in 2016 What FRIB looks like today 20 March 2015 L.T.Hoff, Slide 5

FRIB Schedule as of Today L.T.Hoff, Slide 6 FRIB cryoplant operational 2017 Ion source commissioning 2016 Cryomodule installation/test 2017 Early completion goal 2020 CD-1CD-2CD-3b CD-4

NSCL has been an EPICS facility for nearly 20 years Initially to support the “coupled cyclotron project” starting in 1997 With support and assistance from the newly christened CEBAF First participation in an EPICS Collaboration meeting in May people registered for both May 1998 and May 2105 meetings Transitioned from VME/Fermi-style controls, with serial-attached intelligent controllers Shut down operations for 18 months, restarted with all new control software Retaining hardware infrastructure Transitioned from serial to network-attached intelligent controllers Transitioned (nearly entirely) from VME to LINUX EPICS History at NSCL[1] L.T.Hoff, Slide 7

Operator consoles run Windows Interfaced with “knob panels” for cyclotron tuning NSCL has an eclectic mix of controls UIs, reflecting its research nature Homemade, often pre-dating EPICS use at NSCL Panelmate – similar to EDM QtParam - dynamic spreadsheet Tcl/tk, LabVIEW, etc. MEDM initially, then EDM Often associated with Window-based “high level” IOCs NSCL-specific e-log (hourlog) Captures facility status information, status of experiments, sources of unscheduled downtime EPICS History at NSCL[2] L.T.Hoff, Slide 8

NSCL Timeline from Inception to FRIB L.T.Hoff, Slide 9 EPICS introduced to NSCL Spring 2015 FRIB controls components defined: Continuing the use of EPICS Introducing CS-Studio, DISCS Introducing distributed timing, fast protection

EPICS – of course Archive Appliance CS-Studio Operator screens Alarm system – BEAST Application framework DISCS Configuration database and related applications V4 Physics application/server framework FRIB Benefits From Collaborations, Community L.T.Hoff, Slide 10

CS-Studio Framework For Control Screens/Applications L.T.Hoff, Slide 11

E-traveler system DISCS Components Support Configuration L.T.Hoff, Slide 12 Cable Database

Hardware interfacing/interlocking Extensive use of PLCs to interface with equipment MRF timing Not required for CW NSCL beam FRIB beam macrostructure created by LEBT chopper Machine Protection System Fast protection not required for NSCL High-power ion beam requires fast (down to 35 usec) shutoff Based on FRIB uTCA-capable general-purpose FPGA board Personnel Protection System Based on safety-rated PLCs FRIB Low-Level Controls L.T.Hoff, Slide 13

Tuesday 2:45 - Getting Timestamps right – Martin Konrad Wednesday 11:35 - Rare Isotope Beam Transport at 30 kV – Mathias Steiner Wednesday 11:55- ElasticSearch as a EPICS Directory Service – Evan Daykin Wednesday 4:30 - Traveler and cable web applications at FRIB – Dong Liu Thursday 9:30 - Moving towards Continuous Delivery – Martin Konrad Thursday 9:45 - CS-Studio Collaboration Status – Eric Berryman Wednesday 3:15 – the infoServ system - John Priller FRIB Presentations L.T.Hoff, Slide 14

These folks have joined since last year: See me about joining the team! Thank You For Your Attention L.T.Hoff, Slide 15