Infrastructure status for XFEL Ing. G. Corniani Ettore Zanon s.p.a. TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Infrastructure for SC cavities production at Ettore Zanon s.p.a.
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
SC cavities production at Ettore Zanon s.p.a. Ing. G. Corniani Ettore Zanon s.p.a. May CERN Via Vicenza Schio ( VI ) Italia.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
TE-CRG Activities D. Delikaris, TE-CRG.
Satish Chandra Joshi Raja Ramanna Centre for Advanced Technology, Indore, India Presentation in Web Meeting with Fermilab April 20, 2009.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
WP High Beta Cavities Delivery
Crab Cavity Technical Coordination meeting:
Tongming Huang (IHEP) On behalf of the power coupler working group
CERN – Zanon discussions
Status and plans for the 3.9 GHz section of XFEL
(4 areas/website front)
at STFC Daresbury laboratory
1.3-GHz Cavity Vacuum Furnace at IB4
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Fabrication of Nb and Cu SPL cavities and required tools CERN status
EZ Infrastructure for SC cavities production
Accelerator Module Test Facility
Michael Pekeler RI Research Instruments GmbH Friedrich-Ebert-Str. 1
IHEP Cryomodule Status
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
Daresbury ESS In-Kind Contributions
Double-Spoke Cavities
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

Infrastructure status for XFEL Ing. G. Corniani Ettore Zanon s.p.a. TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Via Vicenza Schio ( VI ) Italia

Infrastructure status for XFEL TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Short Summary A.Ettore Zanon s.p.a. Company B.Company participation to the R&D phase of the XFEL project C.Company actual involvement to the XFEL project D.Cavities production lay-out and Infrastructures E.Production toolings F. Target schedule G. Conclusion

The company was founded in 1919 It is located in the North-east of Italy 90 KM from Venezia Number of personnel 140 Shop’s workers 100 Machining, forming, welding and testing facilities Standard production for chemical industry (reactors, heat exchangers) Production of special components for research institutes and laboratories (UHV, cryogenics, Fusion, Superconductivity ) Infrastructure status for XFEL (A) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011

Infrastructure status for XFEL (A) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Oxychlorination reactor -Cladded material Dimension Dia. 4,1 m X L. 20m, 165 Tons Orbital welding of heat exchanger tubesheet Material S.S. And Zirconium Standard productions Aluminium thermal shield for the ATLAS detector at CERN Special components for research ITER like ICRH antenna – 8 MW RF antenna (Inconel 625) EFDA-JET

Participation to the R&D phase of the XFEL project to develop and manufacture critical components  Development and manufacture of the cryomodules and assembling tooling ( 10 units supplied )  Development and manufacture of 1,3GHz superconducting cavities (66 units supplied - performances above 30MW/m))  Development and manufacture of the 3,9GHz superconducting cavities (3 units)  Manufacture of the Titanium helium tanks (111 units supplied)  Manufacture of the titanium blade tuner (16 units, alternative design solution to the standard tuners) Infrastructure status for XFEL (B) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011

Infrastructure status for XFEL (C) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Actual involvement to the XFEL project August 2010 Award of a DESY contract to manufacture and treat 300 units of the 9 cells, 1,3GHz superconducting cavities Scope of work includes : Manufacture of the 1,3GHz, 9 cells cavities Manufacture of their Titanium Helium tanks Integration of the cavity into its titanium helium tank Treatments and Surface cleaning treatments (BCP, electropolishing, HPR, 800°C vacuum annealing, 120°C backing ecc.ecc) as per DESY specifications Components manufacture and certification according to PED (Presssure Equipment Directive) Delivery production rate (for serial production) 3 units/week

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Cavities production lay-out and Infrastructures To fulfill the contractual requirements decision to separate this production from others Ettore Zanon s.p.a. production and strong effort to study and optimize the production lay-out Cavities production into two dedicated buildings, building lot I and building lot IV Building lot I prefabrication of cells, dumb-bell,subassemblies, end groups EB welding, chemistry Building lot IV (renewed building) Final cavity welding, integration with Helium tank, surface treatments (Prefabrication of the titanium Helium tank in the “standard” shop)

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot I about 600 m 2 Building lot IV 1200 m 2 (plus 600 m 2 for services ) Production lay-out

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Dedicated 200T forming press (cells, tube's pulling, reshaping ) CNC turning machine (cell Dumb-bell machining, others) Electron beam plant, 150KV-30KW – retrofitting for new pumping units with cryogenic pump Clean room ISO7 UPW production unit (18MΏcm) Building lot I

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March Building lot I Frequency control of cells / Dumb bells (Desy equipment.Hazemema machine) Chemistry and Electropolishing areas

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV The building shall be completely “restored” for this production with instalation of central conditioning system too (clean environment) Into the building Designed–optimized lay-out for the production sequence Organization by manufacturing/testing station (MTS) located to suit the production flow Outside of the building “Service area” to concentrated all the equipments/services for the MTS

Infrastructure status for XFEL TTESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Service area Ultra pure Water (UPW ) production plant : production up to 3m 3 /h at 18 MΩcm, 5m 3 /h at >10 MΩcm two distribution loop for 18 MΩcm and 10 MΩcm Chemistry service area : storage of BCP acid, tanks-cooling systems for BCP stations Scrubber for acid gasses vent Pumps (water 18 MΩcm,>100 bar 1,5 m3/h ) for High Pressure Rinsing cabinets Storage tank for LN2 (venting of EBW machine ) Others

Infrastructure status for XFEL (D) TTESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Service area Civilian works in progress

Infrastructure status for XFEL TTESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV A)Chemical treatment area B)Clean room ISO7/ISO4 C)Control, Integration, 800°C -120°C treatments and testing area The buidling is organized in three main areas

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Chemical treatment area Automatic pluritank station for UT cleaning, rinsing water 10 MΩcm and 18 MΩcm Automatic BCP treatment line 2 cooled acid baths for Niobium and Nb-55-Ti 1 bath first rinsing 1 bath final rinsing water 10 MΩcm and 18 MΩcm protection tunnel,fumes extraction to the scrubber Preparation and drying areas

Infrastructure status for XFEL (D) TTESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Clean room ISO7/ISO4 Dedicated to clean assembling, final surface treatments, final assembling for the RFcold test Total surface of about 400 m 2 ISO7 area 200m 2 ISO4 area 180m 2 Operators dressing rooms, 2 air showers All metallic floating floor Customized treatment stations

Infrastructure status for XFEL (D) TTESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Clean room ISO7/ISO4 Pre-assembling stations for cavity EBW preparation 100 bar UPW cleaning cabinet for ISO7 entrance Cabinets for BCP close circuit of the inner / outer cavity surfaces Automatic pluritank station for cavity cleaning 2 UT cleaning baths, 2+2 rinsing baths water 10 MΩcm and 18 MΩcm Alcohol rinsing, Others ISO 7

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 ISO 4 Building lot IV Clean room ISO7/ISO4 Assembling stations for FMS installation - RF antennas assembly N° 2 cabinet for final HPR UPW 18 MΩcm water, >100bar, 1.5m 3 /h Cavity's rotation, vertical translation Nitrogen overlay Station for final leak test special equiments for slow-controlled venting of the cavity Others

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Control, Integration, 800°C -120°C treatments and testing area The area is organized to suit part of the production and control operations (good clean environment, not classified) New EB welding plant : S.S. Chamber, size 3,4x2x2 m, oil free pumping group with cryogenic pump (3x10 -5 mbar 35 minutes),nitrogen venting, RGA Station with automatic TIG equipment for Cavity-tank final integration

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Control, Integration, 800°C -120°C treatments and testing area Several control stations for Frequency check (Network analizer) Intermediate leak test (oil free equipments) CMM, semi-automatic Control Measuring Machine for dimensional survey

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Control, Integration, 800°C -120°C treatments and testing area Visual examination with photo recording of the cavity inner welds and surfaces (endoscope) Several control stations for

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Control, Integration, 800°C -120°C treatments and testing area Dedicated Desy equipment for cavity tuning and frequency controls Shielded pressure test area (final PED certification)

Infrastructure status for XFEL (D) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Building lot IV Control, Integration, 800°C -120°C treatments and testing area Vacuum and inert gas ovens Vacuum oven for 800°C annealing Molibdenum Hot-chamber 0,6x0,6x1,5m (4 units per batch) cryogenic pumps, RGA Inert gas oven for final treatment (120°C, 1x10 -5 mbar, 52 Hours)

Infrastructure status for XFEL (E) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Production toolings Optimization of the production lay-out useless without optimization of the production toolings and manufacturing methods Parallel tecnical effort to improve efficiency of the existing toolings Study and test of new sequences Design and manufacture new toolings

Infrastructure status for XFEL (E) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 New tooling for mulitple loading for the welding operations Target :  Faster items positioning on the device  optimization of the machine work-load reduction of the pumping dead time per single piece Electron Beam Welding machines

Infrastructure status for XFEL (E) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Cavity –helium tank integration area / Workstation 14 Alignement-insertion bench Glove box –automatic TIG welding station Fast and easy preparation, repeteability of the procedure and quality of the results

Infrastructure status for XFEL (F) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Target schedule Our effort to prepare the infrastrucutres necessary for the serial production can be synthetized with the following milestones Civilian works (buildings re-conditioning ) ; started –completion by June 2011 Completion of main equipments contract awards : expected by end March 2011 Supply of main equipments : partly in progress Equipments Installation and commissioning ; expected from June to November 2011 (longest delivery item ; new EB welding machine ) Production tooling design and manufacture ; expected end October 2011 Readiness of infrastructure for serial production start January-February 2012

Infrastructure status for XFEL (G) TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011 Conclusion Ettore Zanon s.p.a. is doing a big effort and investements to organize a dedicated lay-out and optimize production cycles for the production of the 1.3GHz SC cavities Company targets To fullfill requirements of this XFEL contract To gain and acquire new competitivness for future similar tasks

END Thank for the attention Infrastructure status for XFEL TESLA TECNOLOGY COLLABORATION INFN and UNIVERSITYof MILANO MEETING 28 Feb - 3 March 2011