Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.

Slides:



Advertisements
Similar presentations
Thule Smart RV™ Pod Kit Installation For Smooth-Sided Fiberglass RVs
Advertisements

Lectrotab Retrofit Instructions (Replacing Bennett Standard System)
J.P. Langston Brake Retrofit
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
Present Procedure for cutting stuck casing on Drilling PLATFORM
Aerospace Fastener Applications
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Honda 450 Installation Manual.
Click on this image to open the full PDF document.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
Leg Assembly A step-by step guide to the disassembly and service of a HUBO leg.
Trim Fwd Spar End Brackets July 6, H2-2, Horizontal Stab Rear Spar 7H1-2, Stab Full Rib Corner of Forward.
Full Ribs to Rear Spar Parts Layout July 6, H2-2, Horizontal Stab Rear Spar with upper and lower doublers.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
E8, , Wing Damage.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
The C-141 StarLifter Some assembly required. This is some of the tooling used to manufacture the C-141. These were used to shape the sides of the fuselage.
Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
Critical Design Review AAE490 Project 1 March 2003 Nicholas Baker Brian Chernish Andrew Faust Doug Holden Mara Prentkowski Nicholas Setar.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
1 Alwest Railing Replacement: For those of you who have read my previous articles, this project is even a littler further “out there” than the teak decks.
Design of a Robotic Manipulator for a Wheelchair Gateway Coalition Ohio State University Sinclair Community College Wright State University December.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
dsdfsa Zoomed in view… Fasteners Assignment Part C: 3/8-16 UNC-2A 1.5 FLAT HEAD.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
Composite Panels & Adhesives. Composite Panels Panels are fiberglass on both sides with a core in the middle consisting of either foam or a honeycomb.
Dane Batema John Tapee Audrey Serra Patricia Roman Kyle RyanCarlos Vergara Benoit BlierDrew Capps Team 1: Lessons Learned and Vehicle Summary Team “Canard”
Step one: Page Border and title block. Border will be ¼” from the edge of the paper. Drawing will be done in landscape format. Title block will be 1”
2000 Chevy S-10 Left Suicide Door Install Instructions 1.Remove seat (4 anchor bolts.) 2.Remove tracks from seat. To access the nut shown in pic 1, pry.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
Sam Krueger.  Entertainment Center  Preliminary design  Initial  36 plies, glass epoxy  [0 11 /±45 1 /90 5 ] s  No core  Modified design  36 plies,
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
Mass Simulator Concepts Robert Besuner 12 October 2005.
Installing a VOR Antenna on Zenith’s “Flying Rudder” by Bill Bartlett Cutout hole using the antenna gasket as a template. Dill two holes to accommodate.
Exit slit toroid, with horizontal steering servo-loop to slits monochromator, with mirror and grating scanning Beamline Mono residual steering effects.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1. 2 TS 50/100 Tape Splicer SMD Parts Counters Tape Splicers Vision Verification Tape & Reel Supplies Manual SMD Taping Machines Automated Pick & Place.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
FRC Team 2337 Plate/Rail Chassis Design Fully functioning prototype making its debut. Featuring ½ X 1 X 1/8 top and bottom rails, 3.5 X 5.0 motor and shaft.
ADVANCED MECHANICAL DRAFTING
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
EC: 7 DISK concept Preliminary considerations
AEROFIX STRUCTURAL SERVICES
STEP 1: ASSEMBLE ANGLE PLATES
Shuttle Loss of Sensors
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Development of a low material endplate for LP1 and ILD
Easy-Cliner Manual Cable Version Assembly Instruction
Easycliner (Motorized Version) Assembly Instruction
STEP 1: ASSEMBLE ANGLE PLATES
C Air Compressor Up-fit and Plumbing Guide For LDI B3
SAE Aero East 2017 MAE 435 Mid-Term Progress Presentation
McMaster linear bearing #6709K180 with guide rail suppressed
NISSAN Z31 & Z32 OIL PUMP DIFFERENCES
Valve stem “gag” mechanism
M4 & M6 Squirrel® Fixings Installation Guide
Trinity Mexico Boring Bar Repair Report
Bunker Wall Design Wall ESS
Presentation transcript:

Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic Transport Model Project

Project Document Number GTMP-5076 L-1011_mod1 Triangular aluminum plate (1/4” thick) installed in each wing from the forward cam-lock attachment to the main landing gear assembly. Removable Inboard main gear mounting plate attachment to facilitate main gear installation. OEM spar replaced with a 1.25” OD x 0.125” thick aluminum tube (6061-T6). Wing Upgrades

Project Document Number GTMP-5076 L-1011_mod1 (left wing, bottom, shown) Modified Lower Main Wing Hatch OEM nacelle & pylon assembly

Project Document Number GTMP-5076 L-1011_mod1 Hatch attachment screws Hatch clearance holes Hatch attachment screws (left wing, bottom surface shown)

Project Document Number GTMP-5076 L-1011_mod1 Inboard Landing Gear Mounting Plate, removable

Project Document Number GTMP-5076 L-1011_mod1 (Main Wing Hatch Removed) 3x #10-32 SHCS With Hex Lock-Nuts Inboard Landing Gear Mounting Plate, removable 2x #8-32 FHSS 3x #6-32 FHSS 3x #6-32 SHCS

Project Document Number GTMP-5076 L-1011_mod1 OEM paper tube, location unchanged OEM spar tube attachment hole, unused 3x #10-32 SHCS w/ hex lock-nuts, go through the plate & the spar tube, clearance holes on the upper wing surface

Project Document Number GTMP-5076 L-1011_mod1 (solid model shown – lower outer skin removed) OEM paper tube Main ¼” plate Inboard ¼” plate 1.25OD x 1/8” tube

Project Document Number GTMP-5076 L-1011_mod1 (sub-structure assembly – wing not shown) Relief notch to set main gear assembly orientation Plate sandblasted & acetone cleaned before final bonding

Project Document Number GTMP-5076 L-1011_mod1 Fill gap as needed with structural adhesive & chopped fiberglass (sub-structure assembly – end viewed) Cut-off excessive bolt length as needed OEM paper tube

Project Document Number GTMP-5076 L-1011_mod1 (modified left wing – bottom shown) Routed out pockets as needed 3x ½” clearance holes, locate on assembly of the sub-structure OEM tube location, unchanged

Project Document Number GTMP-5076 L-1011_mod1 (sub-structure assembly shown) Cam-lock block Inboard main gear Mounting plate 2X #8-32 FHSS 2X #4-40 SHCS #6-32 SHCS As needed Main plate, ¼” thick

Project Document Number GTMP-5076 L-1011_mod1 Aluminum block with 3 holes tapped to #6-32 thru, bonded to underside of flange for inboard main gear assembly mounting Inboard main gear mounting plate, notched deep, as needed (aft viewed)

Project Document Number GTMP-5076 L-1011_mod1 Balsa & 2 layers of carbon cloth installed over the plate

Project Document Number GTMP-5076 L-1011_mod1 (cam-block drawing)

Project Document Number GTMP-5076 L-1011_mod1 (inboard main gear plate drawing)

Project Document Number GTMP-5076 L-1011_mod1 (main plate drawing)

Project Document Number GTMP-5076 L-1011_mod1 END  Total weight increase for “L-1011_mod1” was 4.13 lbs.  Higher wing loading for the pilots.  More forgiving on hard landings however the main gear assemblies need replacing more often.  Some time involve in setting the main gear assembly orientation so that it operate correctly.  Labor to do the upgrades was 60 man-hours.  A better design would have the main plate sitting on top of the OEM paper tube. FINAL RESULTS & CONCLUSIONS