HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.

Slides:



Advertisements
Similar presentations
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Manual Flo-tap Installation Instructions
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Ion source maintenance on the MAT 253
McMaster rail #6709K601 McMaster linear bearing #6709K180 with guide rail suppressed.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Quadrupole magnets Magnet concept details have not been developed, however we plan to piggy back on the designs developed by Joel Schults ( IRE Magnet.
bobbin Thermal radiation shield Magnet cryostat Large End Flange The leading dimensions.
Statics November 4, A 1kg ball is hung at the end of a rod 1m long. If the system balances at a point on the rod 0.25m from the end holding the.
University of Minnesota Unmanned Aerial Vehicle Research Lab Goldy Flight Control System Manufacturing Instructions.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
Tutorial on Machine vice
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Susana Izquierdo Bermudez. SLS parts 2 Our support is in the nose area that the reason we got the deviations in this area. For the next parts we do the.
GENERAL INFORMATION Invented in 1950's on mainframe computers with 20 inches diameter with only few megabytes of data. Originally called 'Fixed Disc'
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Design Review RSXS - EndStation Review on Vacuum Chamber Stand and Supports Location Beamline Roll-up Endstation.
1 Polarimeter build up and details Robert Lee. 2 View 1 Material (Removable plate, leg supports and rail guide spacer): Aluminum Leg supports attached.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
A 128 fiber Slit-Plate assembly, Kinematic mount
ILC IR FINAL FOCUS & EXTRACTION MAGNETS Prepared by Andy Marone ILC Workshop, Sept
LARP Collaboration Meeting Racetrack Coil Fabrication
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
Dan Cheng S. Kincaide, H. Felice, X. Wang 4/23/2015 MQXFS Mechanical Interfaces (Proposed)
Design – investigation – solutions – working drawings.
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
STEP 1: ASSEMBLE ANGLE PLATES
The design of a photodetector unit of a new Shashlyk EM
QXF Coil Fabrication & Tooling Reaction / Impregnation
LBNF CAD models, Drawings and Component list
ModICE Modular Integrated Connector Enclosure
LARP Phase II Secondary Collimator RC1
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
Endcap shielding senarios:
ERMC/RMM activities May 2017
LARP Vertical Test Facility
LHC IRQ Tie Bar Redesign Using Sleeves – Preliminary
Status of the PANDA Magnet
MBHSP02 test STATUS and first results
Design of the He and HB ODU
STEP 1: ASSEMBLE ANGLE PLATES
Additional Upstream Coil Shielding
McMaster linear bearing #6709K180 with guide rail suppressed
US-HiLumi – Shipping Post Assembly Status
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Presentation transcript:

HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013

Introduction Guram C. provided FNAL header suspension plate details » FNAL apparently has the same basic 4- suspension rod interface that CERN uses » Therefore, HQ02a could be sent the same way as HQ01e3 was set up Additional questions are presented here HQ02a TEST AT FNAL March 6,

HQ02a TEST AT FNAL March 6, 2013 CERN Mounting Hardware R. Hafalia 3

HQ02a TEST AT FNAL March 6, MAGNET SUSPENSION (FNAL) MAGNET SUSPENSION ADAPTER PLATE (SUPPLIED BY FNAL) Designed for 25,000 lb. capacity HQ02a is approximately ~4,500 lbs SUSPENSION RODS (CERN-type shown for pictorial only) - Actual Distance between adapter plate and pizzabox = ?? - Rod diameter = mm /.75”

HQ02a TEST AT FNAL March 6, LBL MAGNET SUSPENSION PLATE (DRAWING) Four tapped holes ¾”-16 threads, 90.0-degrees apart on ” [ mm] diameter hole pattern

HQ02a TEST AT FNAL March 6, Magnet Bottom Plate (For hanging Rohacell spacers underneath magnet) Same four ¾”-16 tapped holes as top plate can be used for hanging the foam spacer stack

HQ02a TEST AT FNAL March 6, Magnet Bottom Plate (2) (For hanging Rohacell spacers underneath magnet) Is a guide plate necessary? If so, who supplies it? Also, hardware interfaces need to be defined for hanging the Rohacell spacers

HQ02a TEST AT FNAL March 6, 2013 INSTRUMENTATION CONNECTOR MOUNTING INSTRUMENTATION CONNECTORS WILL BE LOCATED ON TO MOUNTING SKIRTS ON THE MAGNET SUSPENSION PLATE. SEARCH COIL COLD-FINGER GUIDE PLATES. 2 REQUIRED. - Guide plates must be installed before final magnet assembly at LBL. - Present guide plates can accommodate 2.50” [63.5 mm] diameter. Magnet Suspension Plate Assembly. - Supplied by LBL 9

HQ02a TEST AT FNAL March 6, 2013 CERN Mounting Hardware MODS TO PIZZABOX -TO BRING LEADS OUT FROM THE TOP Is this modification necessary for FNAL’s cryostat? 10 R. Hafalia