New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.

Slides:



Advertisements
Similar presentations
-PROTECT- Protect your $ Investment.
Advertisements

J.P. Langston Brake Retrofit
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
NCSX Machine Platform FDR June 15, 2005 Erik D. Perry.
1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:
Wall construction steps and illustrations Incan construction.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
Controls for Polarimeter Converters
Architectural Drafting Equipment
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.
Floor Framing Unit 29.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Georgia Tech Safety and Health Consultation Program
MQXF length P. Ferracin Video-meeting Structure WG September 18th, 2014.
Wall survey: With and without TT7. The wall targets are hybrid targets made of precise uncoded targets (the pin targets) which enter in the hole of the.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
1 Presentation 37: STAIRWELL LENGTH AND HEADROOM.
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
Building a Deck. What must my Deck be built of??  All lumber used must be southern pine grade #2 or better  Lumber grades are bases off of the number.
LRR – Mechanical Alphonso Stewart Judy Brannen David Steinfeld Ilene Sokolsky Eric Jenkins.
HOME BUILDING PART 1 Floor Framing. Floor Frame  Now that you have a foundation, it’s time to build on it.  This type of construction is for stem-wall.
NSTX NSTX Center Stack Upgrade Ensure fatigue resistant Welds: minimum # of locations shown, could be more. Various Weld Reinforcements & Hardware Replacement.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Side view of generator. Close up of unused grounding pad - gives provisions for mounting the absorber.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
The analysis runs in the following slides are based on a W8 x 58.0 wide beam with dimensions shown bellow.
Engineering Division 1 HHMI 8.2.X Endstation Modification Review Allan DeMello 12/13/2006.
How to build the turn table.. 1. The following parts are required : Rail Curved 22½ Deg. x : Train Wheel W/O-Ring x : Technic.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Hall D Civil and Cryogenic Issues Ravi Anumagalla.
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
½ ” steel plates 1/8 ” Steel C channels; 3 ½” inch wide each The Laser Holder Support Frame Geophone platforms (to characterize fixture motion) Stiffening.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
SHMS SUBASSEMBLY BREAKDOWN AMSEC LLC 10/27/2010. Key Plan CG (TYP) 90 (dotted line)
Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.
Gray Foam Polishing Pad 6” Diameter. 1.25” Thick.
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
FRESCA2 Update on the dipole design and new calculations
Architecture Mr. Graves
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Luxe Plank Replacement
SHMS Q2 with Beam Line Shield Pipe
Additional Upstream Coil Shielding
Tagger Microscope Mounting, Shielding & Cooling
LATHES ACCESSORIES.
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
זכויות סוציאליות.
Body types: Standard side posts Barrel body Horizontal ribbed body
Using Sketchup for Home Contracting
Additional Upstream Coil Shielding
XY Scanner Mount.
Senad Kudumovic Design engineer
The Mechanical Engineering & Technology (MET)
Neutron guide Shielding Concept
Remove all labels from supplies and box
Bunker Wall Design Wall
Bunker Wall Design Wall ESS
Four Jaw Collimator.
Presentation transcript:

New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40 deg shifted back 1.5 inches to clear existing structure Lead shielding inside aluminum box parallel to beam line Instrumentation Case New Shielding Support Beam 6x6 Beams New Shielding Support Stand Beams Attached with 6 bolts (3 each side) thru.50 thick floor plate

New Support Post and Mounting Pad Existing Mounting Pad to be removed from structure New Shielding Support Stand Beams Lead shielding inside aluminum box parallel to beam line Support Beam will be relieved to clear Support Post

Brick Box 1 used for both experiments 6 bricks stacked along Support Post Brick Box #2 used for Cherenkov at 32 deg Brick Box #3 used for Cherenkov at 40 deg and will replace Brick Box #2

View showing clearance for shielding along beam line

Support Beam Clearance between new stand and existing structure Shielding and Support Stand