LWU Design Overview Paul Aden. BTM WP Scope To design, procurement and assemble; –2 Prototypes –3 Test Chambers –75 Linac Warm Units –52 Beam pipe modules.

Slides:



Advertisements
Similar presentations
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
Advertisements

1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Vacuum Vessel Production Readiness Review
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Vacuum system.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
23 rd WP8 Bi-weekly meeting Lukasz Krzempek (TE-VSC-DLM) TAS-Q1 – vacuum equipment design.
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Cavity support scheme options Thomas Jones 25/06/15 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden STFC Daresbury Laboratory ESS TAC, Lund, 15 th October 2015.
Fluid Power Control.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Beam Transport Modules Preliminary Design Review (WP12) Dr Paul Aden Project Manager ESS PDR, Lund, 10 th November 2015.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Update on Work Package 12 Beam Transport Modules (LWUs) - UK-A-6 Dr Paul Aden, STFC Daresbury Laboratory ESS Beam Diagnostics Forum, Lund, 11 th February.
Two-beam module layout
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Baby-MIND Modules & Services
George Mahler, Steven Trabocchi, J. Tuozzolo, Stephen Brooks
F.E.T.S. Mechanical Engineering Update
IMP Cryomodule Assembly and Alignment
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
Cryomodule Assembly Plan
Daresbury ESS In-Kind Contributions
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
SNS PPU Cryomodule Space Frame
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

LWU Design Overview Paul Aden

BTM WP Scope To design, procurement and assemble; –2 Prototypes –3 Test Chambers –75 Linac Warm Units –52 Beam pipe modules –2 Differential pumping systems –4 mobile installation cleanrooms Total Cost £10.5m Approximately 30 FTEs

BTM WP Scope To design, procurement and assemble; –2 Prototypes –3 Test Chambers –75 Linac Warm Units –52 Beam pipe modules –2 Differential pumping systems –4 mobile installation cleanrooms Total Cost £10.5m Approximately 30 FTEs

Overview End of Hall before Target Source Warm Linac Spoke Linac Medium Beta High Beta Upgrade Region Dogleg / Dumpline 500m

Overview End of Hall before Target Source Warm Linac Spoke Linac Medium Beta High Beta Upgrade Region Dogleg / Dumpline 500m

Overview LWUs LWUs & Beam Pipe EVERYTHING Just the red bits LWUs LWUs & Beam Pipe Differential Pumping System Beam Pipe

Covered in this CDR LWUs Beam Pipes HEDP LEDP Not including, – Dump – Dogleg – A2T area

Overview LWUs LWUs & Beam Pipe CDR 2 CDR 1 LWUs LWUs & Beam Pipe Differential Pumping System Beam Pipe

3 rd Party Input Final magnet designs –Quads 19 th February 16 –Correctors 22 nd March 16 Final BPM designs supplied –26 th January 16 BCM Design Decision made –16 th February 16 Final Specifications agreed –24 th March 16 Most recent delivery schedule –3st March 16

Value Engineering Reduction of complicated parts Reduction of similar duplicated components Combining multiple chamber types to allow less chamber designs Standardising components wherever possible

Module Overview Aluminium slotted girder BPM on entrance or exit Semi–kinematic girder adjustment Pedestal s Quadrupole Magnets Fiducials, laser tracker alignment -50µm Accuracy Built in lifting points ‘Particle Free’ Chamber - ISO 5 or better

Design Sheet Chess Document – ESS

Design Sheet

Girder Design

Girder

Adjustment Fixed Length for all LWUs Slotted Girder allows for ‘unlimited’ ‘coarse’ on z Adjustment.

Space is tight - Elliptical 10mm 8mm 12mm

Adjustment Fixed Length for all LWUs Slotted Girder allows for ‘unlimited’ ‘coarse’ on z Adjustment. Mounting adjustment allows for ±15mm fine adjustment Kinematic mounts allow for vertical adjustment ±25mm on a fine M24 nut. ±50mm Girder Adjustment At the request of ESS Survey and alignment group horizontal girder adjustment is above vertical adjustment

Adjustment Slider Plate, Girder directly mounted to these steel plates

Semi Kinematic Adjustment Lifting Points Cone Adjusting Screw Vee Adjusting Screw Flat Adjusting Screw Horizontal Movement Clamps Girder Y,Z Plate

Y & Z Adjustment Adjusting Screws

Vertical Adjustment Vertical Adjustment on Semi-Kinematic mounts ± 50mm

Simplified Model

General Details ItemMass Girder110Kg Chamber, Max80Kg Girder, Chamber & Mounts215Kg Pedestal Assembly170Kg Complete LWU (assumes Q7 550Kg) 1700kg

Mesh Coarse Mesh Min size 3.8mm Max size 19mm

Setup

Static Structural

Stress

Static Results Girder Deflection –0.01mm Maximum Magnet Deflection –0.07mm Maximum local stress on mounting points –20MPa

Pedestal Positions Due to low deflection and requirement for Egress airy points have not been used. Pedestals have been placed directly under the main load, in the case the magnets.

Semi Kinematic Mounts ‘V’ ConeFlat M42 Tie Downs

Semi Kinematic Mounts ‘V’ Aligned with Cone ‘V’ Would need altering to change pedestal spacing

Egress 700mm x 880mm

Modal

450 mm 710mm Steel Box Section- hollow to allow for damping sand if needed Mount for central support and wheels Pedestals

Girder Lifting Mount Setup:

Girder Lifting Mount Lifting Pin inserted through the hole Pin contact area in lifting mount 30mm Diameter Steel Lifting Pin 2000N per mount

Girder Lifting Mount

Lifting Point Positions Adjustable to CoG

Adjustable Lifting Frame

Wheels

Installation Supports Fixes pedestals together to easy removal and replacement of girder whilst pedestals are not fixed to the floor

Design Based on many years experience developing accelerator modules Slotted girders allows for versatility Optimised for ground vibrations Fiducial mounts for survey and alignment –±100µm alignment to local girder network Girder adjustment ± 50mm Magnet/Chamber adjustment ± 25mm, ± 5mm due to other items Large space between pedestals for access/egress

Optimised for space Space for diagnostics

Thermal Knock on effects; –Re design of LWUs including heat transfer Approximately 6-9 months Approximate additional cost XXX Resources are now limited to do this work –Re Design of LWUs excluding heat transfer (i.e. pipe diameter changes) Approximately 2 months Approximate additional cost XXX

Survey & Alignment 4 x 6H7 Fiducial Mounting points at each corner of the girder. 4 x 6H7 Fiducial mounting points at each corner of the pedestal.

Adjustment Individual item adjustment on three point kinematic mounts

Adjuster & Supports

Magnet Adjusters Q5 Magnet spacer

Chamber Adjusters

Scintillator Mounts

Chambers

All Welded

Chamber Designs

Bellows Life cycle Specs etc.

Bellows Travel Required ±40mm Securing bolts do not pass flanges Not designed for Vibration

Custom Flange Clamping hole to prevent bellows moving through rotatable flange when the retracting the bellows

Bolt Extraction Bolt Extraction Direction Slotted CF Flange

VAT Seal Wire scanner diagnostics flange Square flange is the standard VAT flange used on series 35 gate valves We did investigate square CF flanges but there in frequent use and complicated design made it difficult to justify

VAT Seal

Material Selection Tube & main chamber body; 316L Tube to be weld less. Tubes 3.2m, Magnetic permeability less than after vacuum firing Flanges 316LN Bellows 316L

Pipe Diameters Spoke Section –ID mm –OD 63.5 mm –Seamless 316L Elliptical –ID 100 mm –OD 108 mm

Chamber Stress

Chamber Deflection

Vacuum Analysis Checked worse case scenario for LWUS

Summary Looked at many conceptual designs

Summary Looked at many conceptual designs Made modifications based upon prototype build

Design Based on many years experience developing accelerator modules Slotted girders allows for versatility Optimised modal response Fiducial mounts for survey and alignment –±50µm alignment to local girder network Girder adjustment ± 25mm Magnet/Chamber adjustment ± 25mm, ± 5mm due to other items Large space between pedestals for access/egress

BPM Test Rig

BPM Cassette XZ Stage Wire Clamp (Fixed) Wire Clamp (Spring Tensioned) Home Switches Stages – Dover Motion XYR 100 x 100 Travel

Access for cable connection Clamps Face Location Survey Targets 5 BPM’s loaded and surveyed relative to the fixture. BPM Cassette

Home switches (Baumer MyCom E) actuated by the wire location body. Relationship between homed position and BPM physical centre determined by CMM optical survey then offsets calculated. Home Switch

Transport Method 78 Open plywood box with corner supports Plywood bottom with timber base for reinforcement Anti-Vibration Springs between module and box base Lifting Points required on 3. Plywood lid Module Airide trailer for low road vibration transmission Springs between girder and box base for shock loads Quantity will depend on girder length & weight Spring dampers

Design tasks still to be carried out Finalise vessel drawings for: –Spoke X –Elliptical X Complete modal analysis for inclusion of sand Complete drawing package for BPM test Rig Complete specification for mobile cleanroom design Crate and transportation detailed design work

Design Progress

Thank You

Main Item List Main Chamber Bellows Assembly BPM Integration Particulate cleaning System Support Girder Pedestal frame Kinematic mounting for girder - type 1 Kinematic mounting for girder - type 2 Kinematic lock nut Washer Bolts Nuts Floor Plate Beam Adjustment Kinematic Adjuster - type 1 Kinematic Adjuster - type 2 M24 Fine Pitch Notch Nut Beam Support Plate Adjusting Plate Adjuster Block Clamp Washer Mount Cone Mount Vee Mount Flat Clamping Nuts Clamping Washers Vacuum measurement and Control Penning Gauge / IMG Thermo Couple / Pirani Gauge Penning Gauge controller / IMG Penning Gauge Cable TC / Pirani Gauge control TC / Pirani Gauge Cable Pumping Systems Ion Pump - 75l/s + Controller Pump Controller Pump Cables Valves VAT S54 Right Angled valves DN40 DN10 Venting valve - debate Soft Start Pumping/Vent Flanges, Connections & fittings Various Blanks Various Gaskets Misc Electrical Termination Mounts Electrical Tray Work Fasteners nuts & bolts

Additional Item List Misc Cleaning a consumables Vacuum testing consumables Shipping and Transport Costs Shipping Crates Shipping Packing/Mounts Shock Watch Transportation Crate Identification Test Equipment Vacuum Pumps Vacuum Gauges Test racks Pump Controllers Gauge Controllers

Diagnostics Chamber Steering Magnets Focusing Magnets LWUs