T2K Target status PASI Meeting Fermilab 11 th November 20151 Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration.

Slides:



Advertisements
Similar presentations
Matt Rooney RAL The T2K Beam Window Matt Rooney Rutherford Appleton Laboratory BENE November 2006.
Advertisements

EUROnu Beam Window Studies Stress and Cooling Analysis Matt Rooney, Tristan Davenne, Chris Densham Strasbourg June 2010.
SNS Experimental FacilitiesOak Ridge Target Systems for the Spallation Neutron Source Presented by John R. Haines at the High-Power Targetry for Future.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Shock simulations in solid targets Chris Densham Rutherford Appleton Laboratory.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Chris Densham RAL High Power Targets Group To be a ‘one-stop shop’ (P. Hurh) for target technology Enable optimum physics performance via sound engineering.
for a neutrinos factory
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
T2K Target & Secondary Beamline - progress towards a neutrino Superbeam? Chris Densham.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta Chris Densham STFC Rutherford Appleton Laboratory, UK 1 st joint meeting of EUROnu WP2 (Superbeam)
The JPARC Neutrino Target
Mercury Beam Dump Simulations Tristan Davenne Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2 nd Princeton-Oxford High Power Target Meeting 6-7.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
JHF2K neutrino beam line A. K. Ichikawa KEK 2002/7/2 Overview Primary Proton beamline Target Decay Volume Strategy to change peak energy.
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
Proton Accelerators for Science and Innovation Workshop at Fermilab
Target system for hadron & neutrino beam lines at J-PARC Contents Introduction of J-PARC Target and Target system for hadron beam line Target system for.
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Study of a new high power spallation target concept
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
T2K Secondary Beamline – Status of RAL Contributions Chris Densham, Mike Fitton, Vishal Francis, Matt Rooney, Mike Woodward, Martin Baldwin, Dave Wark.
Summary Why consider a packed bed as a high power target?
NuMI 2 nd High Power Targetry Workshop October 2005 NuMI Target Status and Future Pat Hurh Page 1 NuMI Target Status and Design Study for Proton Driver.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
Future upgrade of the neutrino beam-line for multi-MW beam 5 th Hyper-Kamiokande open Vancouver July Yuichi Oyama (KEK) (for T2K neutrino.
11 Status of Neutrino Beamline Construction T.Kobayashi IPNS, KEK Jan.8, 2008 J-PARC PAC.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
HK Secondary Beam Issues Chris Densham STFC Rutherford Appleton Laboratory.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
Harold G. Kirk Brookhaven National Laboratory Post-Irradiation Properties of Candidate Materials for High-Power Targets PAC05 Knoxville, TN May 16-20,
Overlap of Project X and Beamline to DUSEL June 2, 2008.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Megawatt targets for Neutrino Super-Beams (Apr. 4, 2013) RAL High Power Targets Group: Chris Densham, Tristan Davenne, Mike Fitton, Peter Loveridge, Matt.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
BENE/CARE Frascati November 2006 CJ Densham CCLRC Rutherford Appleton Laboratory Solid target studies in UK for T2K and for a neutrino factory JRJ.
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES N. Simos, BNL EUROnu-IDS Target Meeting December 15-18, 2008 Superbeam Horn-Target Integration.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Status of UK contribution to LBNF beam and target system Chris Densham, Tristan Davenne, Otto Caretta, Mike Fitton, Peter Loveridge, Joe O’Dell, Andrew.
ESSnuSB Target Chris Densham, Tristan Davenne STFC Rutherford Appleton Laboratory 26 th May 2014.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Engineering studies for the Conceptual design of the LBNO Facility 1 F. Sanchez Galan (CERN) on behalf of the CERN Secondary Beam Working Group, With contributions.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
MARS15 Studies of Impact of LBNF Target/Horn Optimization on the Hadron Absorber 6 th High Power Targetry Workshop Merton College, Oxford April 12, 2016.
High Power Target Experience with T2K Chris Densham T2K Beamline Collaboration including RAL / KEK / Kyoto.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Chris Densham Figures of Merit for target design for neutrons, neutrinos… Chris Densham Rutherford Appleton Laboratory.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Future Neutrino Beam in J-PARC Tetsuro Sekiguchi IPNS, KEK 2013/11/12NNN2013, Kavli IPMU1.
Target work plan for LBNO study Chris Densham STFC Rutherford Appleton Laboratory.
Irradiated T2K Ti alloy materials test plans
ISIS TS1 Project: Target Design and Analysis
Tungsten Powder Test at HiRadMat Scientific Motivation
News and brief overview of Beamline plans for the next few months
Peter Loveridge High Power Targets Group
Beam Window Studies for Superbeams
EUROnu Beam Window Studies Stress and Cooling Analysis
Superbeam Horn-Target Integration
Presentation transcript:

T2K Target status PASI Meeting Fermilab 11 th November Chris Densham STFC Rutherford Appleton Laboratory On behalf of the T2K beam collaboration

Breakthrough Prize in Fundamental Physics awarded to Professor Koichiro Nishikawa on behalf of the K2K and T2K Collaborations for the achievements of K2K and T2K $3M prize shared with Kamland, Daya-Bay, Super-Kamiokande and SNO experiments

Chris Densham HINT 15 October 20153

Pacific 30 GeV PS 3 GeV PS 400 MeV LINAC T2K neutrino facility T2K Target Station 295 km to Super-Kamiokande Near detector MLF Beam dump

T2K operational history

T2K Secondary Beam-line 110m Muon Monitor Target station Beam window Decay Volume Hadron absorber Target Station, Decay Volume and Beam Dump all enclosed in large water-cooled steel helium vessel. –He atmosphere prevents nitrogen oxide (NO x ) production / oxidization of apparatus. Beam dump and vessel walls cooled by water circuits. –Maintenance is not possible after beam operation due to activation. –Radiation shielding / cooling capacity were designed for ~4MW beam.

T2K Secondary Beam-line Baffle 1st horn Target 2nd horn 3rd horn BEAM Iron shield (2.2m) Concrete Blocks Helium Vessel Muon Monitor Target station Beam window Decay Volume Hadron absorber

Horn & target system in Target Station m 10.6m Baffle Graphite Collimator Horn-1 Horn-2 Horn-3 Beam window Ti-alloy DV collimator Large flange, sealed with Al plates, t= 120mm 1.0m Concrete blocks Water-cooled iron cast blocks 29pcs. total 470t Support Module 2.3m Horns / baffle supported within vessel by support modules. Apparatus in beam-line highly irradiated after beam. Remote maintenance required. Service Pit maintenance area OTR Target Beam

Horn transfer from beamline to remote maintenance area Handling machine for horns Horn and target Guide cell on the maintenance area Horn support module Guide cell on helium vessel

Target exchange system Target & horn Helium cooled graphite rod Design beam power: 750 kW Beam power so far: 330 kW 3% beam power deposited in target 1 st target & horn replaced after 4 years, 6.5e20 p.o.t. 2 nd target being repaired after 5 e20 p.o.t. π π p

Inspection of target/horn in Remote Maintenance Area Cracked ceramic break diagnosed Not a real technical problem (inside helium vessel) Currently working on pipe replacement Known issue with diffusion bonded ceramic-to-stainless joint has been fixed

Plan for remote replacement of helium pipe

Inlet pressure = 1.45 bar (gauge) Pressure drop = bar Need higher pressure helium for higher powers Helium cooling velocity streamlines Maximum velocity = 398 m/s Current target – helium cooled solid graphite rod Designed for old parameters of MR 750kW beam: cycle: 2.1s, PPP: 3.3x10 14 Present expected parameters: Doubled rep-rate, MR cycle: 1.3 s, PPP: 2.0x10 14 Stress wave amplitude decreased by 40% -> What is maximum beam power possible for this design?

Effect of pulsed beam on T2K target Inertial ‘violin modes’ P. Loveridge Stress distribution after off-centre beam spill Radial stress waves – on centre beam spill 8 MPa 0.5 µs beam spill p

Stress wave magnitude determined by t spill <t oscillation period

Fast neutron radiation damage data for graphite (IG 110, similar to IG 43) Max temperature 736ºC assuming reduction in thermal conductivity by 75%

Beam Window Separates He vessel from vacuum in primary line with pillow seals Double skin of 0.3mm thick Ti-6Al-4V, cooled by He gas (0.8g/s) 300  C/200MPa, Safety factor 2 for 750kW(3.3x10 14 ) ~ Safer for 750kW(2.0x10 14 ) Reduction of Ductility reported with 0.24DPA 6x10 20 pot≈1DPA?: Replacement cycle should be considered. Same window in front of Target, Same material with OTR, SSEM 17

Pulsed beam tolerance for candidate window materials where ‘Thermal stress resistance’, UTS – ultimate tensile strength α – coefficient of thermal expansion E – Young’s modulus ΔT – temperature jump EDD – energy deposition density Cp – specific heat capacity NOTE: ΔT depends on material density as well as specific heat capacity, so these are also important variables.

ANSYS static (time-averaged) stress UTS Ti-6Al-4V ≈ 1GPa NOTE: 100W/m 2 K heat transfer coefficient applied to internal wall

Effects of elevated temperature, fatigue and radiation damage on beam window U.T.S. Safety Factor N. Simos (BNL) 8.9x10 20 pot ~ 1.5 dpa 0.24 dpa Significant loss of ductility at 0.24 dpa Now likely to be entirely brittle at 1.5 dpa Does it matter? Low stress at moment 320 kW 750 kW

New collaboration led by P. Hurh on accelerator target materials as part of Proton Accelerators for Science & Innovation (PASI) initiative. Key objectives: Introduce materials scientists with expertise in radiation damage to accelerator targets community Apply expertise to target and beam window issues Co-ordinate in-beam experiments and post- irradiation examination 12 members signed MoU – more welcome 21