Beam abort in KEKB and Background measurement by SVD 8 Feb. 2011 T. Tsuboyama (KEK)

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

Microwave Tubes.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
Slide # 1 Examples of pressure sensor packaging Temperature characteristics of a piezoresistive pressure sensor. Transfer function at three different temperatures.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Stephanie Majewski Stanford University
Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
Seminar ON SMART SENSOR Submitted by : SUBIR KUMAR GHOSH Roll No. IN-14/04 Electrical & Instrumentation Deptt. B.E 7th Semester JORHAT ENGINEERING COLLEGE,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
10/26/20151 Observational Astrophysics I Astronomical detectors Kitchin pp
Photodetection EDIT Internal photoelectric effect in Si Band gap (T=300K) = 1.12 eV (~1100 nm) More than 1 photoelectron can be created by light in silicon.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
9 September 2009 Beam Loss Monitoring with Optical Fibers for Particle Accelerators Joint QUASAR and THz Group Workshop.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
LHC-CC10, 4th LHC Crab Cavity Workshop Summary Session 5: Crab Cavity Beam Studies P. Collier.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Modulators and Semiconductors ERIC MITCHELL. Acousto-Optic Modulators Based on the diffraction of light though means of sound waves travelling though.
Background Simulations for the LHCb Beam Condition Monitor Overview: ● The LHCb Beam Condition Monitor (BCM) – Purpose, Design and Function – Implementation.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
D. Valuch, N. Schwerg, O. Brunner (CERN)
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
UCLA IEEE NATCAR 2004 SUMMER CLASS Magnetic Sensors & Power Regulation.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
 The figure below shows a protection system for a transmission line, consisting of a CT, PT, a relay and its associated circuit breaker.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
High Efficiency Klystron
Beam Secondary Shower Acquisition System: Front-End RF Design
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
PIN DIODE.
大強度
Summary: Workshop on CMS Beam Conditions, Radiation Monitoring and Luminosity Systems Oliver Stein, May 2013, CERN.
Chapter 6 Sensorless Control for BLDC Motor Drives
Comments to the SVD4 structure
Beam Current Monitoring with ICT and BPM Electronics
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday 20 September 2011.
Presentation transcript:

Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)

Properties of the KEKB beam abort Beam abort is done by kicker pulse magnets in KEKB. The beam circulation period of KEKB is 10  sec. About 100  sec delay in KEKB side to avoid beam aborts due to electric noise (can be shorter). KEKB has its own strong beam abort detections to protect KEKB components. – Beam phase abort  If the beam bunches fail to synchronized with the phase of the acceleration RF system, the beam is aborted. – Loss monitor abort  Radiation monitor in the tunnel. – Super conductive Cavity abort  Discharge in SC cavities. Basically, unstable beam is aborted before it induces fatal beam back ground level in Belle. Because of beam-beam effect, LER/HER beam becomes unstable, causing BKG, when the other beam is lost.

Background condition SVD1 --- Very weak to radiation. – VA1 chip, 0.7  m technology: Strong constraint to KEKB operation. SVD2 --- Rad hard (VA1TA, 0.35  m). – We allow high radiation level in KEKB vacuum scrubbing. 40 mrad/sec. – Normal operation is less than 1 mrad/sec. – The sensitivity of the radiation monitor dropped at least to half. No reliable measurement after 3-4 years. I propose to install at least a few DIAMONDS in addition to many PIN diodes. Everyday local run data (noise, gain…) was carefully watched. Although ~ 1 % bad channels newly appeared, the SVD2 performance did not change significantly through the experiment especially due to radiation.

Belle radiation monitor for SVD Un-biased PIN diode (4mmx6mm) with high-gain charge amplifier. – If biased, increase of leak current (drift significantly) can not be compensated. – Sensitivity changes due to radiation damage. Two PIN diodes with different OP amplifier gain. PIN systemDynamic range (mrad/sec) Main use High gain/slow0.1 – 1000Radiation monitor Low gain/fast10 – 10 5 Beam abort

Radiation monitor for SVD2 Un-biased PIN diode (4mmx6mm) with high-gain charge amplifier. Two PIN diodes with different OP amplifier gain.

Observation 100 rad/sec radiation level time occurs often. Most of them are very short time. If we issue beam aborts, KEKB operation is not possible. – We need larger dynamic range, or, much less gain. SVD send beam abort signal when high background condition is kept for ~300  sec.

Beam abort due to slow measurement In order to keep attention of KEKB operators to the radiation background, I implemented a “slow beam abort”. – When 100 mrad/sec radiation level continues for 1 minutes, the beam abort is issued. This is effective to reduce BKG when the beam injection is very dirty. (We can ask KEKB operators to stop or reduce rate of the beam injection with a very bad condition.)

Summary KEKB has its own strong beam abort system and Belle is usually very safe. Belle used PIN diodes. In Belle2, I recommend several diamond sensors to calibrate PIN diodes. For a reliable beam abort decision, a system with low gain (1000 rad/sec or less) PIN diodes is enough. Nov B2GM I changed my mind after hearing the experiences of CLEO radiation monitor in Nov2011 B2GM.

I recommend PIN diodes + a few diamonds. I now do not recommend preamplifiers are integrated close to the PIN diodes and diamonds. – The performance of SVD2 radiation monitor was limited by the built-in OP amplifier circuit. – After installation, we can change the operation parameters: Speed, saturation level, gain… – There are good cables: thin, low-leakage, high bandwidth. – The signal processing can be done in the E-hut using various circuit design. Improvement can be done after installation.

If we prefer a similar hybrid to SVD2… RADFET (with high dynamic range). PIN diodes and a diamond on a Kapton flex. Pt100 temperature sensor No amplifier integrated. We should be careful about the high voltage for diamond (E~1V/  m). We need a good insulator layer covering the Kapton circuit.