Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Carriage house expansion at the Grover Cleveland birthplace
The Greenwood Apartments a partnership between Banc of America Community Development Corporation and Clearwater Neighborhood Housing Services, Inc.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
“Fires in improperly secured vacant or abandoned buildings are a constant threat to firefighters, citizens and private property alike. We believe that.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
P A U L S E N A R C H I T E C T S Structural Engineer P A U L S E N A R C H I T E C T S A vision for the future. Experience that equals success. Bold designs.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
CITY OF MERIDIAN FY09 BUDGET HEARING Mayor – Tammy de Weerd Council President – Charlie Rountree Council Vice President – David Zaremba Council – Keith.
HISTORIC TAX CREDITS 101 Presented by: Bryan C. Keller, CPA Partner In Charge Real Estate Services Group Rubin, Brown,Gornstein & Co. LLP.
VACANT/BOARDED STRUCTURES Deanna JeffersonSmith Assistant City Attorney/Community Prosecutor John Hancock Code Department Acting Assistant Director.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
SCHEMATIC DESIGN PRESENTATION
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Whistler Lodge Survey December 2012 Commissioned by the VP Administration.
Dirty Tour December 2005 UN Capital Master Plan. 2 Dirty Tour- introduction The UN building was a state-of-the-art, code compliant structure when it was.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
PC Meeting July 1, 2015 CUP 15-02/DR 15-06/DR
Historic Rehabilitation Tax Credits Federal Incentives for Preservation.
Proposal For Fire Station No. 2 Presented to: Lawrence City Commission April 11, 2006.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
Wisconsin Business Incubation Association Annual Conference Financial Tools for Creating and Sustaining Entrepreneurship Bill Chaudoir, Executive Director.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Discussion and Possible action on the historic designation by the City of Laredo Landmark Board on certain LISD Schools.
College Station ISD Planning for Growth December 12, 2006.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Blossom Park Condominiums Update Board of County Commissioners September 15, 2015.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Capital Improvement Program for September 9, 2014.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015.
South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
Southeast Financial Center
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.
BOMES THEATER INFORMATIONAL MEETING Department of Planning & Development City of Providence October 24, 2013.
Government Center Study Update City of Creve Coeur December 8, 2014.
OPERATION SAFETY THE DAY AFTER. 2 ANNOUNCEMENT: AT APPROXIMATELY 22:30 HOURS (10:30 pm), AN EF2 TORNADO TOUCHED DOWN AT THE INTERSECTION OF WEST STREET.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
White Pigeon Community Schools
DISCUSSION OF THE FUTURE DEVELOPMENT OF THE YWCA BUILDING 78 N
Fall 2017 Update: Physical properties and sinking fund
Construction Documents
Dr. Joseph Meloche Superintendent of Schools Mrs
Caryl School Open Hearing March 26, 2007.
Worcester Public Schools Study and Master Plan
UNION GROVE ELEMENTARY REFERENDUM
DOWNTOWN TAMPA HISTORIC LANDMARK
2018 Bond Review and Proposal
CV Futures Task Force Report May 8, 2017
The Asset Management Journey for Building Assets
San Diego Housing Commission Final Bond Authorization for West Park
Project S.O.A.R December 10, 2018 Meeting
Mount Vernon Community School
Stoughton Public Library
Community Practice Asset Management.
Dixon Middle School Project Update
Presentation transcript:

Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012

Eden Park Pump Station - Building History Located at 1430 Martin Drive within Eden Park Constructed as a pumping station for the East Reservoir in the late 1800’s. Intermittently served a number of municipal uses up until 2004 when it was vacated due to a partial collapse of the structure. Building is uninhabitable in its current conditions.

Building Status Present No municipal services have been located in this building since The building has been under the control and management of the Department of Public Services. Though the building is located within Eden Park, it has never been a park facility or Park Board responsibility. City Administration has attempted to find a use for this facility since 2004.

2010 Study by MSA Architects In 2010, MSA Architects completed a use study of the Pump Station for City Facilities The Study stated that “Although a specific use for the Pump House in its current site context is limited, the revitalization of the Pump House would greatly enhance the function and character of the park.” MSA’s Study listed three major obstacles that limit the building’s ability to contribute to the park: access, parking, and location. Once the listed obstacles had been addressed, the Study recommended several options for the vacant Pump Station including: offices, conference space, a lecture hall or reception space. No cost estimates were included in this study.

Current Preferred Developer Agreement The Department of Public Services entered into a preferred developer agreement (PDA) with a potential end user in June of Cincinnati Beer Co (CBC) has been doing assessments on the building to determine the costs to bring the building to habitable conditions. The costs included in this presentation separate the costs to make the building habitable and to establish a brewery inside. The City’s intent with this Preferred Developer Agreement is to examine CBC’s proposal to turn the Eden Park Pump Station into a micro-brewery and tap room. The Economic Development Division (EDD) was asked to assist in reviewing the proposed project starting in February of 2012.

Cincinnati Beer Company Proposal CBC is working to complete their proposal for turning the Pump Station into a micro-brewery w/ tap room. CBC is seeking direction from the City as to whether a brewery, tap room and parking variances will be granted. CBC plans to take advantage of State (and Federal) Historic Rehabilitation Tax Credits, and will make financial (sale/lease) proposal(s) based on whether sale and/or lease is a possibility. CBC has completed preliminary design and cost estimates for an historic renovation of the Eden Park Pump Station.

Cost Estimates for Pump Station Cost Estimates from CBC for Eden Park Pump Station: *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Asbestos Abatement - $535,000 - This includes the removal of Asbestos Containing Material (ACM) from the existing roof, attic floor, and first and second floor tile.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Site Demolition - $275,000 - The removal of interior walls and windows, floor structure to facilitate construction of new stairs, as well as the removal of other damaged fixtures and building components.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Roofing - $195,000 - Construction cost of a replacement roof. Existing roof is severely deteriorated and leaks extensively.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Exterior Windows & Doors - $120,000 - Costs of replacing existing windows and doors. Replacements would meet State & Federal Historic Standards

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Window Rehabilitation & Storm Windows- $25,000 - Rehab of existing stained glass windows and original double hung windows. Work would meet State & Federal Historic Standards

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Brick Repair & Tuck pointing- $30,000 - Exterior of the building has missing brick and deteriorated and missing mortar in several areas.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Attic Floor- $225,000 - Replacement of current attic floor due to water damage & asbestos containing material. The new floor would house new HVAC equipment and provide a thermal barrier that the roof cannot.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Sub-basement Drainage, Stairs & Structure - $120,000 - To remediate moisture in sub- basement, replace sub-basement slab and adding new support columns to support the damaged basement floor.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility Basement Slab, Stairs & Structure - $95,000 - This work is necessary to meet code and use requirements.

Cost Estimates for Pump Station *Note: these costs are for structural repair and building code updates only. These costs do not include costs for an end-user to occupy the facility 1 st & 2 nd Floor Concrete Structure, Slab & Stairs - $80,000 - Replace existing stairs, overlay concrete slabs on 1 st & 2 nd floors Misc Structural Work- $25,000 - Expose front stained glass window with a two-story vestibule.

Cost Estimates for Pump Station *Note: some of these costs are tenant specific costs. HVAC - $200,000 - Current system is inoperable & needs to be removed & replaced to abate asbestos in Attic Electric - $225,000 - System has been damaged by water and deterioration. Plumbing - $125,000 - System has been damaged due to lack of use and frozen pipes. Fire Protection - $75,000 - System needs to be updated

Cost Estimates for Occupancy Cost Estimates from CBC for Occupancy (GC & profit estimates included): *Note: these costs are for structural repair and building code updates. The HVAC, Electric, Plumbing & Fire numbers include a portion of CBC specific costs. Asbestos $ 535, Interior Demolition $ 275, Roof Replacement $ 195, Interior & Exterior Repairs $ 720, HVAC, Electrical, Plumbing & Fire Code* $ 625, Estimated GC fees, Contingency & profit$ 587, Building Total (for any occupant) $ 2,937,500.00

Estimated CBC Brewery Build-out costs

Tap room & new front entry at Martin Drive - Interior build-out costs – $630,000

Brewery Initial Build-out - Brewery Equipment – $500,000

Rendering of Renovated Exterior - Pre-development costs and Exterior Site work - $550,000

Issues to Consider for Re-use of the Pump Station Under Current Proposal  Building Sale or Long Term Lease to allow for use of State Historic Tax Credits  Use Variance (Brewery and Tap room)  Parking Variance (on-site parking)  Restrictions on Hours of Operation  Costs incurred by City  Current upkeep & maintenance  Assistance with repair for end-user

This CAGIS aerial photograph illustrates parking usage on a Saturday or Sunday afternoon in March The following aerial photographs are enlargements of this photograph.

Within approximately 1200 feet of the Pump Station there are more than 130 parking spaces, not counting any spaces north of the south side of Krohn conservatory.

Cost Estimates for Pump Station Cost Estimates from CBC for Eden Park Pump Station: Three Options *Note: these costs have not yet been vetted extensively by Administration and should be considered ballpark figures. (1) Building Stabilization Costs – $2,937,500 Brewery Improvement Costs – $1,912,500 (2) Total Brewery Project Costs – $4,850,000 (3) Building Demolition Costs – $744,000