Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)

Slides:



Advertisements
Similar presentations
Sat 17/9 – Sun 18/9 07:00 Cryo problem in point 4 From E. Blanco: First beam dump caused by a cryo PLC not reachable anymore (UX45_QUI) and then 14 minutes.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
ESS DTL beam commissioning
HIE-ISOLDE contribution packages M. Pasini BE/RF.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Status of REX and Commissioning with Beam Dr. Jose Alberto Rodriguez, BE-OP-PSB (167538)
Beam diagnostics in the beamlines
Anders Sunesson RF Group ESS Accelerator Division
J. Alessi Implementation Plan EBIS Project Technical Review 1/28/05 Implementation Plan WBS exists Working on a “bottoms up” cost estimate The following.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
HIE-ISOLDE Project Status Report
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Beam Instrumentation for the HIE-ISOLDE linac Francesca Zocca ISOLDE Workshop and Users Meeting December CERN Instituto de Estructura de la.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Report from the HEBT working group + Commissioning plan and Schedule 5th HIE-ISOLDE Physics Coordination Group Meeting D. Voulot on behalf of HEBT and.
HIE-ISOLDE Project Status Report
The HIE-ISOLDE Faraday Cup
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
HIE-ISOLDE diagnostic boxes Esteban D. Cantero CERN BE-BI-PM HIE-ISOLDE meeting for BE/BI 28 March 2014 The research leading to these results has received.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team HIE-ISOLDE Physics Coordination WG Meeting CERN, 16 February 2015.
ISOLDE Technical Report Richard Catherall ISOLDE Technical Coordinator 50 th INTC meeting 1 st July 2015.
Overview of new high level software applications developed for the HIE- ISOLDE superconducting linac D.Lanaia*, M.A. Fraser, D. Voulot *The research project.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
HIE-ISOLDE Project Status Report 50th ISOLDE & nTOF Technical Committee meeting July 1st 2015 Y. Kadi.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
PXIE warm front end status A. Shemyakin PIP-II technical meeting 3 May 2016.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
S A Griffiths CM42 June 2015 Electrical & Control.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
NICA injection complex status
Status of HESR 18th March Gießen Dieter Prasuhn.
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Performance of BI systems at HIE-ISOLDE
RF operation of REX-ISOLDE
DC Injector and Space Charge Simulation Status
Beam instrumentation for HIE-ISOLDE
LINAC4 commissioning plans etc.
Electron Source Configuration
Pulsed Ion Linac for EIC
Advanced Research Electron Accelerator Laboratory
HIE-ISOLDE contribution packages
Beam Commissioning at ESS
MEBT1&2 design study for C-ADS
Physics Design on Injector I
Ideas for REX/HIE-ISOLDE Upgrade
Presentation transcript:

Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)

Content:  Status of the REX NC linac (status of HIE-ISOLDE hardware commissioning reported by Walter Venturini)  Commissioning with beam and Start-up of experimental program  Summary and open discussion Jose Alberto Rodriguez, BE-OP-PSB (x167538) HIE-ISOLDE Physics Coordination Meeting /06/29

Rex linac: RF systems RFQ: RFQ recalibrated Stable at 10 Hz, 1 ms / 40 kW pulses IH structure:  First RF in the structure delayed to wk 27  Recalibration and long RF tests delayed to wk 28 9 GAP structure: Temporary 9gap amplifier stable at 1Hz, 300 us, 45 kW  Final 9gap amplifier scheduled to arrive in week 31. Commissioning will be completed by week 35 7 GAP structures: RF power in 7 gap structures for a short period of time  Recalibration and long RF tests delayed to wk 28 Buncher: Stable at 10 Hz, 1 ms / 1.4 kW pulses Maintenance and refurbishment of amplifiers for RFQ, IH structure, buncher and 7 gap structures completed Remote controls functional Connections to the new HIE-ISOLDE RF reference line completed  Ramp-up in duty cycle in wk 28/29 Jose Alberto Rodriguez, BE-OP-PSB (x167538) HIE-ISOLDE Physics Coordination Meeting /06/29

Rex linac: Other systems Triplets Power converters and magnets: New power converters for quads (19 units) fully functional New cooling water circuits for all the quads operational Electrical short in last triplet repaired and triplet refurbished Additional tests and measurements in other quadrupoles completed (thermal switches characterized, temperature rise measured…) Jose Alberto Rodriguez, BE-OP-PSB (x167538) Triplets Doublet Steerer HIE-ISOLDE Physics Coordination Meeting /06/29

Rex linac: Other systems REX linac diagnostics box Power converters and magnets: New power converters for quads (19 units) fully functional New cooling water circuits for all the quads operational Electrical short in last triplet repaired and triplet refurbished Additional tests and measurements in other quadrupoles completed (thermal switches characterized, temperature rise measured…) Jose Alberto Rodriguez, BE-OP-PSB (x167538) HIE-ISOLDE first diagnostics box Diagnostics: FC, MCP and collimator wheel in REX diagnostics box commissioned  FC and Si detector in first HIE-ISOLDE diagnostics box will be installed and commissioned this week HIE-ISOLDE Physics Coordination Meeting /06/29

Rex linac: Other systems Power converters and magnets: New power converters for quads (19 units) fully functional New cooling water circuits for all the quads operational Electrical short in last triplet repaired and triplet refurbished Additional tests and measurements in other quadrupoles completed (thermal switches characterized, temperature rise measured…) Jose Alberto Rodriguez, BE-OP-PSB (x167538) Fast acting valve Diagnostics: FC, MCP and collimator wheel in REX diagnostics box commissioned  FC and Si detector in first HIE-ISOLDE diagnostics box will be installed and commissioned this week Vacuum: Scheduled maintenance completed. Faulty turbo pumps, controllers and gauges replaced Fast Penning gauges for fast acting valve to protect cryomodule installed  Update/upgrade of the control software scheduled for the winter shutdown HIE-ISOLDE Physics Coordination Meeting /06/29

Rex linac: Other systems Power converters and magnets: New power converters for quads (19 units) fully functional New cooling water circuits for all the quads operational Electrical short in last triplet repaired and triplet refurbished Additional tests and measurements in other quadrupoles completed (thermal switches characterized, temperature rise measured…) Jose Alberto Rodriguez, BE-OP-PSB (x167538) Diagnostics: FC, MCP and collimator wheel in REX diagnostics box commissioned  FC and Si detector in first HIE-ISOLDE diagnostics box will be installed and commissioned this week Vacuum: Scheduled maintenance completed. Faulty turbo pumps, controllers and gauges replaced Fast Penning gauges for fast acting valve to protect cryomodule installed  Update/upgrade of the control software scheduled for the winter shutdown Controls: New low level controls functional (new power converters, RF amplifiers…)  High level applications currently being updated (working sets and equipment arrays ready) HIE-ISOLDE Physics Coordination Meeting /06/29

Commissioning with stable beam Commissioning with beam started on week 25 Beam with an A/Q=4.0 beam has been accelerated to 0.3 MeV/u (RFQ output energy) We have reached the first diagnostic box and commissioned the FC, MCP and collimator wheel Beam transmission through RFQ for different power levels Evaluating the possibility of using quad scans to measure beam properties Next steps:  Commissioning of first HIE-ISOLDE diagnostics box right after installation (week 27/28)  Phasing of the NC cavities (week 28 to 31) Jose Alberto Rodriguez, BE-OP-PSB (x167538) Beam in FC after RFQ for different collimator aperture sizes (15, 5, 3 and 1 mm) MCP image of the beam after the RFQ Beam transmission thru the RFQ vs RF power for A/Q=4.0 Beam diagnostics box HIE-ISOLDE Physics Coordination Meeting /06/29

Jose Alberto Rodriguez, BE-OP-PSB (x167538) HIE-ISOLDE Physics Coordination Meeting /06/29 XT00 line XT01 lineXT02 line CM1 (2015) CM2 (2016) 9gap Commissioning with beam Next steps (as soon as the hardware commissioning of CM1 is completed):  Commissioning of the diagnostics boxes in XT00 and XT01 with A/Q=4.0, E=2.85 MeV/u beam (wk 36/37)  Commissioning with beam of magnets: quads, steerers, dipoles and SC solenoid (wk 38)  Delivery of first stable A/Q= 4.0, E=2.85 MeV/u to users for experimental station commissioning (wk 38). Beam generally available in late evenings and nights starting week 38. Note that the beam energy may be change from day to day.  Phasing of SRF cavities (wk 39)  Measurements of the energy gain in each of the cavities using dipole and Si detectors (wk 40)  Tests of the scaling of the linac (wk 41)  Preparation for first experiment (wk 41)  First radioactive beam in linac. Beam preparation for first experiment (wk 42)  Start of experimental program (wk 43) Diagnostic boxes

Summary and open discussion Jose Alberto Rodriguez, BE-OP-PSB (x167538) Commissioning:  We are several weeks late with the hardware commissioning of the RF systems for REX. It has not affected the commissioning with beam yet. But, it may if run into problems with any of the amplifiers or cavities  New 9 gap amplifier will arrive on week 31. It will take a few weeks to commission it  All other systems in REX are ready  Commissioning with beam started on time. Beam accelerated in the RFQ. Commissioning will continue once components of the first HIE-ISOLDE diagnostics box are installed  Time allocated for the commissioning with beam of the cryomodule and HEBT is very tight HIE-ISOLDE Physics Coordination Meeting /06/29 Beam to experimental station 1:  First stable beam with E=2.85 MeV/u and A/Q=4.0 to experimental station on week 38  Higher energies possible on week 39 and 40  Different A/Q possible on week 41  Setting up of the linac with radioactive beam on week 42  Start-up of first physics experiment possible on week 43