South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WARM, HUMID CLIMATE.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Buildings and Structures 1
Safe Lashing / Securing of Loads
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Erecting Roof Trusses - Gable
Breaking and Breaching. Tools Used Sledge hammers –Long and short handled Chisels Pinch point pry bar –“Crow bar” Hacksaw Handsaw Bolt cutter Flat head.
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Walls Ron Gatepain constructionsite.
Subpart R Steel Erection
Solent University Research for Oxfam, Sheltercentre and others.
Framing Agriculture Structures
OPERATIONAL SUPPORT EMERGENCY SHELTER SOLUTIONS Corinne Treherne Shelter Department, IFRC.
Construction of Low Cost Housing in Developing Countries Proper housing is an important need for every human being. Types of accommodations depend on:
Concrete
SHELTER IN DISASTER RESPONSE International Federation of Red Cross and Red Crescent Societies.
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
Shelter response options 1.Emergency Shelter 2.Shelter assistance kits 3.Shelter grants 4.Core Houses )T-Shelter 5.Evacuation camp assistance 6.Permanent.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
After the foundations have been completed the walls are set out and construction commences. wall structures.
MEDICAL SEMI-TEMPORARY STRUCTURES Examples of medical semi- temporary structures in MSF programs By Jérôme Michon and Yannick Garbusinski and Hugues Robert.
Topic C1 Superstructures - walls
CONSTRUCTING A FIVE CABIN LATRINE
Open Frame Racks & Accessories. 2 Application ‣ 2/4-Post Open Frame Racks combine the mounting security of a cabinet with the accessibility of a rack.
Building Types.
Host SDC/SHA May 2005 introduction project focuses on the design and deployment of warm climate emergency shelter for a family of 6 people latest.
Native Americans of South Carolina
ARC-Shelter Program Experience Sharing Farooq Khan Snr. Coordinator WASH & Infrastructure ARC-International.
Shelter Cluster Donors and Heads of Agencies Strategic Meeting 17:00, Nov 21 st, 2013.
A joint technology of: Technology Developer Technology Proofing.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
C1 Conceptual Design of Buildings Lecturer: XY. 2 List of lectures 1)Multi-storey buildings 2)Floor slabs, primary and secondary beams 3)Joints of floor.
Roof and Ceiling Framing
Winter Camp Awareness Tents and Terrain The Objective: To Provide you with information in selecting the proper tent for snow camping and how to construct.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
FORMS, SCAFFOLDING and STAGING
Sustainable Construction Methods
1. Trip overview Field locations Agencies consulted 2. Executive summary Current responses Remaining shelter needs 3. Technical notes Vernacular construction.
Day 1 09:00 – 09:30 09:30 – 09:45 09:45 – 10:00 10:00 – 10:30 10:30 – 11:00 11:00 – 11:30 11:30 – 12:00 12:00 – 12:30 12:30 – 13:00 13:00 – 14:00 14:00.
About Us Our vision is to eradicate poverty housing worldwide We are motivated by our Christian faith We work by empowering local communities to solve.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
1 FRENCH RED CROSS in Grenada CONSTRUCTION OF WOODEN HOUSES ACCORDING TO STANDARDS Tel: / Sugar Mill, St George’s.
South Sudan Emergency Response 2014 Robust Shelter Construction.
Lecture 15 - Timber Wall Framing Example
Topic Today’s Objective
1 SURFACE FINISHES, DOORS AND WINDOWS. SURFACE FINISHES OR PLASTERING Process of covering rough walls and uneven surfaces in the construction of houses.
Camp Management and SPHERE Standards Module 4 Session 4.2 National Disaster Management Practitioners, Islamabad, Pakistan.
Framed Structures Luisana Hernández.
Shelter Cluster Somalia ShelterCluster.org Coordinating Humanitarian Shelter Building Back Safer PILOT PROJECT KISMAAYO 1 Building Back Safer.
Developing a session plan S3.1 session day Text Dimension 40 Arial BOLD Position: Horizontal 5.44 Vertical 2.40 Text Dimension 24 Arial BOLD ITALICS Position:
SUBJECT - Technical Terms OF Doors And Types Of Doors.
5. FERROCEMENT.
Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 1 TRAINING: 4 W Questionnaire.
By: Logan Morey “I believe I have seen hell and it is white, snow-white” -Elizabeth Gaskell.
Sustainable Shelter Solutions
Framing Agriculture Structures
Shelter Working Group Meeting Monday 16 June, 10AM
BUILDING CONSTRUCTION 1
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Framing Agriculture Structures
Seminar on roofs and slabs
•Connecting to the Foundation & Bearing
Flood: Build a Stronger Plinth
MATERIALS AND CONSTRUCTION I
Wood Structures Topic 6 Roof Framing Trusses
Good morning, my name is……
Components of Construction
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Displacement Tracking Matrix DTM; Sector 4W
Presentation transcript:

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WARM, HUMID CLIMATE

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 Acute Emergency Shelter Standard Emergency Shelter Robust Emergency Shelter Transitional ShelterPermanent Shelter Main characteristics  Lightweight  Air lift able  Basic kit  Below sphere standards  Lifespan: 3 to 6 months  Truck transportation  Standards kits in pipeline  According Sphere standards  Lifespan: 3 to 6 months  Truck transportation  Top up kits on Standard E shelter  According Sphere standards  Reinforced structure  Lifespan: 6 to 12 months  Truck transportation  Design acceptable by local culture  Structure fully reinforced and stable  Wall using flexible materials acceptable as last resorts.  70 % of the materials shall be reusable and transportable.  Lifespan: 12 to 24 months  Truck transportation  Design acceptable by local culture  Structure fully reinforced and stable  Wall using infilling or durable materials  Roof potentially upgraded with thatch or CGI sheets.  Lifespan: over 12 months (to 10 years)  Proper door, wall base and slab provided. Applicable when …  For ‘harsh to reach’ area  Road transport  Common kit applying as baseline for all situations.  Road transport  Mid stay foreseen (over 2 seasons))  Unsecured returns  Land Tenure un-cleared (population stranded or in transit)  P.O.C.  Road transport  Mid stay foreseen (over 6 months)  Secured returns  P.O.C. with high security constraint (closed PoC)  Land Tenure cleared.  Road transport  Secured returns  Land Tenure fully cleared and documented. [1] [1] Excluding plastic sheet. Reusable target mainly the structural elements. [2] [2] Corrugated Gauge Iron or tin also called tin sheet. Gauge under 28 or 26.

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 Proposed kits 2 Plastic Sheeting 30 meter linear of 6mm or 7 mm nylon rope 6 Pegs Tools: Hoe according distribution scheme 3 Plastic Sheeting 2 Rubber binding ties 30 meter linear of 6mm or 7 mm nylon rope 2 Bundle or bamboo (10 pieces each) 4 wooden poles 36 sand bags Tools: Hoe according distribution scheme Top up kit: 8 extra wooden poles (total shall be 12 poles) 3 bundles of bamboo 10 extra sand bags 200 g nails for structure (30 nails) on 6 inches Tools: according Optional 400 g of roofing nails 2,5” (around 120 nails) not from the pipeline If design use non split bamboo add 50 ml of 1.2 mm metal wire to tie (around 500 g)  To be defined by T Shelter agencies  Shall preferably use timber structure (for repairs, conversion etc.)  Shall preferably being locally produced.  Shall avoid or reduce plastic sheeting, polyethylene materials  80 % of materials shall be locally (south sudan) materials 18 to 20 poles 10 bamboo bundles (doubling wattle for wall) 2 plastic sheeting for temporary roof (if needed) 2 plastic sheeting for temporary wall (if needed) 100 ml of 1.2 mm metal wire (around 1 kg) 70 hollow cements block for floor 2 cement bags for block mortar and slabs Ironmongery and nails, 1 pair of hinge, 2 lock 1 small 1 big, padlock, ½ 5 hinge nails 2 timber 2x4 + half iron sheet (door leaf) Costs Cost : 61.7 USD (without transport) Cost : USD (without transport) Cost total: 225 USD Cost for the top up kit: 60 to 70 USD Cost on units = USD Total cost 450 to 475 USD

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 STRUCTURAL COMPONENTS, BRACING With winds or any other loads, non braced structures may drift, twist or lean. Bracing should be done on the structure, in filling material are just helping.

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 EVEN MULTIPLE VERTICAL POLES COULD LEAN

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 Global communities in Abey, developed a design taking account evolution to more permanent shelter using wattle and daub technics. 12 m2

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WATTLE & DAUB GENERAL Global Communities, Abey 2014

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WATTLE & DAUB SPECIFICATIONS Clay soil as black cotton soil are useable with wattle and daub Possibility to amend with fibers or sand in order to reduce shrinks. For fiber better to use animal (hair) if termite are very common on site. Reinforcing the wall in filling do NOT dispense or proper bracing. In order to save materials, the main structure could be done with wooden pole and a secondary structures with Bamboo

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 STRUCTURE USING WOODEN POLES, BAMBOO CULMS & BAMBOO LATTICES Primary structure 9 vertical elements Rigidity ensured on upper frame with wooden pole or similar elements. Door reinforced Secondary frame made with bamboo culms Lattices (optional) to act as wattle.

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 VENTILATION PRINCIPLES Cross ventilation (opposite) Difference of opening size High-low ventilation

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 VENTILATION (EXAMPLE)

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 ROOF TYPES

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 ROOF STRUCTURE, IMPORTANCE OF TIE OR COLLARS FOR THE TRUSSES. The full bamboo culm shall not be nailed (avoiding cracks and splits) better to use rubber tie or metal wires Bamboo lattices could be nailed if nail diameters are corrected (less than 2 inches)

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 PERMANENT SHELTER (EXAMPLE)

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 GENERAL COMPOSITION Main elements: Cultural acceptance (tukul) Local material (thatch roof) Investment on expensive items (cement blocks, slabs, door, hinges) Reinforcing structure Improving wall base and floor

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 AXONOMETRIC VIEW

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept designs of wattle and daub technics

South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 USEFUL ADDRESSES, SITES & LINKS 800 miscellaneous publications to download including classic of construction General shelter library Earth construction specialized NGOCraterre-EAG Shelter clusterhttp://sheltercluster.org/ Compressed Stabilised Earth Block Manufacture in Sudan, Doctor E.A. ADAM, UNESCO publication Transitional Shelter Guideline, shelter center Transitional Shelter, 8 designs, IFRC MCR, Roofing system. Skat