BT AB/CO/MI 18 th September 2007 Safe Machine Parameters Chassis.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
LHC Machine Interlocks & Beam Operation LHC Machine Interlocks & Beam Operation ARW2011Bruno PUCCIO (CERN) 13 th April v0 Thanks to Benjamin Todd.
Safe Machine Parameters General Machine Timing Cross-Check Safe Machine Parameters General Machine Timing Cross-Check 9 th May v3.
CERN Machine Protection – A Future Safety System? Introduction 1 SMP = Safe Machine Parameters System which receives accelerator.
The Architecture, Design and Realisation of the LHC Beam Interlock System Machine Protection Review – 12 th April 2005.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
INTRODUCE OF SINAP TIMING SYSTEM
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Test and Monitor with the CIBT.
B. Todd AB/CO/MI 30 th January 2008 Safety in Mind…
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
1v1 Availability Tracking as a Means to Increase LHC Physics Production B. Todd 1, A. Apollonio 1 and L. Ponce 1 1 CERN – European Organisation for Nuclear.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
Dayle Kotturi Lehman Review May 10-12, 2005 LCLS Timing Outline Scope SLC Master Pattern Generator Introducing the PNET VME receiver.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
1N.Voumard, AB/BT/ECLBDS Audit, CERN 2008 Presentation of the Beam Energy Tracking System Definition : The Beam Energy Tracking System (BETS) monitors.
B. Todd et al. 25 th August 2009 Observations Since v1.
B. Todd on behalf of TE/MPE/MI 25 th May 2009 Beam Interlock System Changes Following 2006 Audit 1v0.
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
A.Dinius AB/PO/IEE - BIS Audit 18 th September 2006 Beam Interlock System Hardware Implementation.
BEE3 Updates June 13 th, 2007 Chuck Thacker, John Davis Microsoft Research Chen Chang UC Berkeley.
The CERN LHC central timing A vertical slice
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
V. Kain AB/OP1Sep 12, 2007 Summary of Discussion on Injection Protection Issues Injection Protection Issues – meeting 22 nd of June V. Kain, A. McPherson,
The CERN LHC central timing A vertical slice Pablo Alvarez Jean-Claude Bau Stephane Deghaye Ioan Kozsar Julian Lewis Javier Serrano.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
B. Todd AB/CO/MI BIS Audit 18 th September 2006 Signal Integrity Electro-Magnetic Compatibility Dependability.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
BT/BP AB/CO/MI 17 th September 2008 Safe Machine Parameters Status & Update.
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
GMT Config. for the experiments: Summary of received requests / LEADE Meeting 4 th Feb.08 / B.P. 1 Summary of received requests for Safe Machine Parameters.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
1v2 LHC Availability Tracking: Past and Future B. Todd, A. Apollonio, L. Ponce on behalf of the LHC AWG.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
B. Todd et al. 19 th August 2009 The Beam Interlock System Thanks to: Machine Protection Panel, R. Schmidt, B. Puccio, M. Zerlauth and many more… 0v2.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
教育卡(电子卡) 身份信息认证指导 (学生). 身份信息认证渠道 教育卡管理中心为学生提供了 “ 教育卡官方网站 ” 和 “ 教育人人通客户端 ” 两种认证渠道。 1 教育人人通客户端 2 ●● 您可以在教育卡网站的 “ 人人通客户端 ” 版块下载江苏教育人人通客户端。
Beam Interlock System Dependability Study RSWG – 31 st January 2005.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
Realising the SMP 1. Safe Machine Parameters Overview
0v1.
LHC General Machine Timing (GMT)
Realising the SMP 1. Safe Machine Parameters Overview
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Overview of CERN BIS and Communication Hardware
LIU-PS Beam Dynamics Working Group
B.Todd, M. Zerlauth, I. Romera, A. Castaneda
Injection BIS – next iteration
Jan Uythoven For discussion
J. Uythoven for the MPE-MI & MS Teams
Not a BIS expert, not even working on BIS but I’m going to try to present it as completely as possible.
1v0.
Introduction SMP = Safe Machine Parameters
Safe mode transmission
M. Zerlauth, I. Romera 0v1.
1v1.
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
SPS Injection BIS - Draft requirements
Presentation transcript:

BT AB/CO/MI 18 th September 2007 Safe Machine Parameters Chassis

Safe Machine Parameters System 2 of 26 A Standard VME Chassis Has 21 Slots! The cards that were proposed by Bruno last time are: Frame Receiver – CISR Energy Down Sampler – CISE Frame Transmitter – CIST Timing Receiver VME – CTRV Timing Receiver Interface – CISI Flag Generator – CISG Generator Arbiter – CISA SMP Transmission Cross-Checker – CISC Beam Interlock System Interface – CISF Chassis Debugger – CISD

Safe Machine Parameters System 3 of 26 A Standard VME Chassis Has 21 Slots! The cards that were proposed by Bruno last time are: Frame Receiver – CISR Energy Down Sampler – CISE Frame Transmitter – CIST Timing Receiver VME – CTRV Timing Receiver Interface – CISI Flag Generator – CISG Generator Arbiter – CISA SMP Transmission Cross-Checker – CISC Beam Interlock System Interface – CISF Chassis Debugger – CISD CISB

Safe Machine Parameters System 4 of 26 A Standard VME Chassis Has 21 Slots! Frame Receiver – CISR Energy Down Sampler – CISE Frame Transmitter – CIST Timing Receiver VME – CTRV Timing Receiver Interface – CISI Flag Generator – CISG Generator Arbiter – CISA SMP Transmission Cross-Checker – CISC Beam Interlock System Interface – CISB Chassis Debugger – CISD X4 (side by side) X1 (after CISR) X1 (after CISE) X1 (after CIST, before CIBI) X1 (after CIST) X2 (side by side, after CISE) X1 (after CISE) X1 (after CISI) X1 (after CISG) X1 (last board in chassis) Total is 14 boards + Power PC = 15 slots! 6 left

Safe Machine Parameters System 5 of 26 Proposed Chassis SMP A VME chassis has 21 slots…

Safe Machine Parameters System 6 of 26 Proposed Chassis SMP A VME chassis has 21 slots…

Safe Machine Parameters System 7 of 26 Proposed Chassis SMP Power PC:

Safe Machine Parameters System 8 of 26 Proposed Chassis SMP First receiver

Safe Machine Parameters System 9 of 26 Proposed Chassis SMP Other receivers (x4)

Safe Machine Parameters System 10 of 26 Proposed Chassis SMP Energy Down-Sampler

Safe Machine Parameters System 11 of 26 Proposed Chassis SMP First Flag Generator

Safe Machine Parameters System 12 of 26 Proposed Chassis SMP Second Flag Generator

Safe Machine Parameters System 13 of 26 Proposed Chassis SMP Arbiter

Safe Machine Parameters System 14 of 26 Proposed Chassis SMP BIC Interface

Safe Machine Parameters System 15 of 26 Proposed Chassis SMP Frame Transmitter

Safe Machine Parameters System 16 of 26 Proposed Chassis SMP Timing Receiver

Safe Machine Parameters System 17 of 26 Proposed Chassis SMP Interface Timing to SMP (plus clocks??)

Safe Machine Parameters System 18 of 26 Proposed Chassis SMP Cross-Checker

Safe Machine Parameters System 19 of 26 Proposed Chassis SMP Debugger

Safe Machine Parameters System 20 of 26 Details All boards classic 4/8TE wide (we’ve done these already!) Intercommunications done through P2 Could be done using Panel and Extenders (a la BIC) If it is this way - each board could have 55 differential I/O through P2. Panel could be tricky though… let’s take a look:

Safe Machine Parameters System 21 of 26 Chassis SMP

Safe Machine Parameters System 22 of 26 Chassis SMP

Safe Machine Parameters System 23 of 26 Chassis SMP Add the 3 x 32 connectors to each board:

Safe Machine Parameters System 24 of 26 Chassis SMP Add some Burndy for CIBU!

Safe Machine Parameters System 25 of 26 Chassis SMP We’ve done this before bundies could be used for many things: Flag Arbiter Beam-1 Fault Flag Arbiter Beam-2 Fault Safe Machine Parameters Beam-1 Cross-Check Fault Safe Machine Parameters Beam-2 Cross-Check fault SPS Safe Injection Flag for LHC Beam-1 SPS Safe Injection Flag for LHC Beam-2 etc

Safe Machine Parameters System 26 of 26 FIN