February 5-6, 2004 HAPL meeting, G.Tech. 1 1. HAPL Chambers and Materials Effort Introduction 2. Chamber Tasks Coordination Presented by: A. René Raffray.

Slides:



Advertisements
Similar presentations
Development Paths for IFE Mike Campbell General Atomics FPA 25 th Anniversary Meeting December 13,2004.
Advertisements

HAPL January 11-13, 2005/ARR 1 Overview of the HAPL IFE Dry Wall Chamber Studies in the US Presented by A. René Raffray UCSD With contributions from John.
September 24-25, 2003 HAPL meeting, UW, Madison 1 Armor Configuration & Thermal Analysis 1.Parametric analysis in support of system studies 2.Preliminary.
March 21-22, 2006 HAPL meeting, ORNL 1 Status of Chamber and Blanket Effort A. René Raffray UCSD With contributions from: M. Sawan B. Robson G. Sviatoslavsky.
Government Labs 1.NRL 2.LLNL 3.SNL 4.LANL 5.ORNL 6.PPPL Universities 1.UCSD 2.Wisconsin 3.Georgia Tech 4.UCLA 5.U Rochester 6.PPPL 7.UC Santa Barbara 8.UNC.
November 8-9, “Engineering Analysis” of He Retention & Release Experiments to Determine Desirable Engineered W Armor Microstructure A. René Raffray.
Welcome to the second “official” Laser IFE workshop Discuss our progress in Laser IFE Address some key issues as a group Oxidation of graphite walls Filling.
Plans For ARIES-IFE Study Farrokh Najmabadi ARIES Conference Call May 17, 2000 Electronic copy: ARIES Web Site:
March 3-4, 2005 HAPL meeting, NRL 1 Target Survival During Injection…The Advantages of Getting Rid of the Buffer Gas Presented by A.R. Raffray Other Contributors:
EFFECTS OF CHAMBER GEOMETRY AND GAS PROPERTIES ON HYDRODYNAMIC EVOLUTION OF IFE CHAMBERS Zoran Dragojlovic and Farrokh Najmabadi University of California.
April 4-5, 2002 A. R. Raffray, et al., Chamber Clearing Code Development 1 Chamber Dynamics and Clearing Code Development Effort A. R. Raffray, F. Najmabadi,
March 3-4, 2008/ARR 1 Power Management Technical Working Group: TRL for Heat and Particle Flux Handling A. René Raffray University of California, San Diego.
June7-8, 2001 A. R. Raffray, et al., Completion of Assessment of Dry Chamber Wall Option Without Protective Gas, and Initial Planning Activity for Assessment.
November 8-9, Considerations for Small Chambers A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
November 8-9, Blanket Design for Large Chamber A. René Raffray UCSD With contributions from M. Sawan (UW), I. Sviatoslavsky (UW) and X. Wang (UCSD)
Action Items For ARIES-IFE Study Farrokh Najmabadi ARIES Project Meeting June 19-21, 2000 University of Wisconsin, Madison Electronic copy:
May 5-6, 2003/ARR 1 Town Meeting on Liquid Wall Chamber Dynamics ARIES Town Meeting Hilton Garden Inn, Livermore, CA May 5-6, 2003 Background and Goals.
October 24, Remaining Action Items on Dry Chamber Wall 2. “Overlap” Design Regions 3. Scoping Analysis of Sacrificial Wall A. R. Raffray, J.
ARIES-IFE Assessment of Operational Windows for IFE Power Plants Farrokh Najmabadi and the ARIES Team UC San Diego 16 th ANS Topical Meeting on the Technology.
Progress Report on Chamber Dynamics and Clearing Farrokh Najmabadi, Rene Raffray, Mark S. Tillack, John Pulsifer, Zoran Dragovlovic (UCSD) Ahmed Hassanein.
HAPL May 22-27, 2005 ISFNT-7, Tokyo, Japan 1 Progress Towards Realization of a Laser IFE Solid Wall Chamber A.R. Raffray 1, J. Blanchard 2, J. Latkowski.
January 8-10, 2003/ARR 1 1. Pre-Shot Aerosol Parameteric Design Window for Thin Liquid Wall 2. Scoping Liquid Wall Mechanical Response to Thermal Shocks.
Aug. 8-9, 2006 HAPL meeting, GA 1 Advanced Chamber Concept with Magnetic Intervention: - Ion Dump Issues - Status of Blanket Study A. René Raffray UCSD.
Nov 13-14, 2001 A. R. Raffray, et al., Progress Report on Chamber Clearing Code Effort 1 Progress Report on Chamber Clearing Code Development Effort A.
Highlights of ARIES-IFE Study Farrokh Najmabadi VLT Conference Call April 18, 2001 Electronic copy: ARIES Web Site:
Impact of Magnetic Diversion on Laser IFE Reactor Design and Performance A. R. Raffray 1, J. Blanchard 2, A. E. Robson 5, D. V. Rose 4, M. Sawan 2, J.
Aug. 8-9, 2006 HAPL meeting, GA 1 Open Discussion on Advanced Armor Concepts Moderated by A. René Raffray UCSD HAPL Meeting GA, La Jolla, CA August 8-9,
October 27-28, 2004 HAPL meeting, PPPL 1 Overview of the Components of an IFE Chamber and a Summary of our R&D to Develop Them Presented by: A. René Raffray.
April 9-10, 2003 HAPL Program Meeting, SNL, Albuquerque, N.M. 1 Lowering Target Initial Temperature to Enhance Target Survival Presented by A.R. Raffray.
The High Average Power Laser Program in DOE/DP Coordinated, focussed, multi-lab effort to develop the science and technology for Laser Fusion Energy Coordinated,
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
Power Extraction Research Using a Full Fusion Nuclear Environment G. L. Yoder, Jr. Y. K. M. Peng Oak Ridge National Laboratory Oak Ridge, TN Presentation.
October 27-28, 2004 HAPL meeting, PPPL 1 Overview of the Components of an IFE Chamber and a Summary of our R&D to Develop Them Presented by: A. René Raffray.
A Plan to Develop Dry Wall Chambers for Inertial Fusion Energy with Lasers Page 1 of 46 DRAFT.
Long Term Exposure of Candidate First Wall Materials on XAPPER February – May 2004 Presented by: Jeff Latkowski XAPPER Team: Ryan Abbott, Robert Schmitt,
Fracture of Tungsten in a HAPL Chamber Jake Blanchard HAPL MWG Fusion Technology Institute University of Wisconsin September 2003.
October 27-28, 2004 HAPL meeting, PPPL 1 Thermal-Hydraulic Analysis of Ceramic Breeder Blanket and Plan for Future Effort A. René Raffray UCSD With contributions.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY 1 Tungsten Armored Ferritic Steel Glenn Romanoski & Lance Snead June 2004.
Plan to Develop A First Wall Concept for Laser IFE.
February 5-6, 2004 HAPL meeting, G.Tech. 1 HAPL Blanket Strategy A. René Raffray UCSD With contributions from M. Sawan and I. Sviatoslavsky UW HAPL Meeting.
Chamber Development Plan and Chamber Simulation Experiments Farrokh Najmabadi HAPL Meeting November 12-13, 2001 Livermore, CA Electronic copy:
Some Thoughts on Phase II for Target fabrication, injection, and tracking presented by Dan Goodin Georgia Institute of Technology February 5th & 6th, 2004.
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
July 11, 2003 HAPL e-meeting. 1 Armor Design & Modeling Progress A. René Raffray UCSD HAPL e-meeting July 11, 2003 (1)Provide Parameters for Chamber “System”
The High Average Power Laser (HAPL) Program We are developing Fusion Energy with lasers, based primarily on direct drive targets and dry wall chambers.
Materials Discussion / Integrated Testing Plan Final Optics Transmissive - issues related to absorption Reflective - LIDT and effect of dust - neutron-induced.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
Welcome to the eighth HAPL meeting Courtesy, Mark Tillack, UCSD.
Update on Roughening Work Jake Blanchard HAPL MWG Fusion Technology Institute University of Wisconsin e-meeting – July 2003.
1 Neutronics Parameters for the Reference HAPL Chamber Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
WELCOME Fifth Laser IFE (HAPL) Program Workshop Naval Research Laboratory Dec 5 and 6, 2002.
The tungsten/F82H sample was impinged at 6 different locations with 6 different laser fluence energies to determine the critical energy that would result.
February 5-6, 2004 HAPL meeting, G.Tech. 1 Chamber Tasks Coordination Presented by A. René Raffray UCSD With contributions from J. Blanchard and the HAPL.
Overview of HAPL First Wall Materials Issues HAPL Materials and Design Team HAPL Average Power Laser Program Workshop Princeton Plasma Physics Laboratory.
Plasma Processes, Inc. February 5-6, Engineered Tungsten for IFE Dry Chamber Walls HAPL Program Meeting Georgia Institute of Technology Scott O’Dell,
Materials Integration by Fission Reactor Irradiation and Essential Basic Studies for Overall Evaluation Presented by N.Yoshida and K.Abe At the J-US Meeting,
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
Status and Plans for Systems Modeling for Laser IFE HAPL Progress Meeting November 2001 Pleasanton, CA Wayne Meier, Charles Orth, Don Blackfield.
Operating Windows in Tungsten- Coated Steel Walls Jake Blanchard – MWG Greg Moses, Jerry Kulcinski, Bob Peterson, Don Haynes - University of Wisconsin.
1 A Self-Cooled Lithium Blanket Concept for HAPL I. N. Sviatoslavsky Fusion Technology Institute, University of Wisconsin, Madison, WI With contributions.
HAPL June 20-21, Overview of Chamber/Blanket Work Presented by A.R. Raffray UCSD With contributions from CTC Group and MWG Blanket contributions:
Progress Report on SPARTAN Chamber Dynamics Simulation Code Farrokh Najmabadi, Zoran Dragojlovic HAPL Meeting April 8-10, 2003 Sandia National Laboratory,
M. S. Tillack, J. E. Pulsifer, K. Sequoia Final Optic Research – Progress and Plans HAPL Project Meeting, Georgia Tech 5–6 February 2004.
Craig Olson, Tina Tanaka, Tim Renk, Greg Rochau, Robert Peterson
Welcome to the sixth HAPL meeting
University of California, San Diego
VLT Meeting, Washington DC, August 25, 2005
TRL tables: power conversion and lifetime
University of California, San Diego
Presentation transcript:

February 5-6, 2004 HAPL meeting, G.Tech HAPL Chambers and Materials Effort Introduction 2. Chamber Tasks Coordination Presented by: A. René Raffray UCSD With contributions from John Sethian and the HAPL Chamber and Materials Community HAPL Meeting UCLA Los Angeles, CA June 2-3, 2004

February 5-6, 2004 HAPL meeting, G.Tech. 2 Tungsten armor on low activation ferritic steel High melting temperature of tungsten Known, nuclear qualified materials Experience in fabrication and joining Compatibility with most coolants Ability to engineer tungsten if needed Can test a lot of the key issues now Step 1: Choose a Concept

February 5-6, 2004 HAPL meeting, G.Tech. 3 Armor/FW Critical Issues (1)Viable Material Structures (2)Helium and Hydrogen Isotope Diffusion. (3)Ablation (ions & X-rays including surface roughening) (4)Thermomechanical Fatigue and Fracture Toughness (5)Thermophysical Properties (including irradiation effects) Other Issues to be addressed later depending on blanket and system (e.g. need for barrier coating, corrosion…) Step 2: Identify Key Issues

February 5-6, 2004 HAPL meeting, G.Tech. 4 Chamber Tasks Coordination (CTC) -Armor/First Wall -Blanket -System -Integrated design effort Step 3: Set Up Coordinated Plan of Attack Credible case that in-reactor components will provide required performance and lifetime in an integrated environment prototypical of a power plant Materials Working Group (MWG) - Materials Development -Properties -Fabrication methods -Constraints (e.g. temp. limits) Combination of modeling and experimental R&D

February 5-6, 2004 HAPL meeting, G.Tech. 5 Develop Overall Chamber Program Milestones in Support of HAPL Program Goals Chamber Program Milestones Credible case that dry wall is viable for laser IFE for Phase II Complete study of wider range of W/FS types and downselect for further multi-effect testing 2014 Path to develop Laser Fusion Energy Phase I: Basic Fusion Science & Technology Phase II: Full Scale Components (IRE) Phase III: ETF Select best armor/FW/chamber unit for ETF and start fabrication and final qualification testing (Also for chamber test modules) Armor/FW/chamber ready for ETF + at least one chamber test module

February 5-6, 2004 HAPL meeting, G.Tech. 6 Focus on first major milestone (within months): ”Make credible case that dry wall is viable for laser IFE for Phase II” CTC discussion and meeting to evolve top level goals and tasks & deliverables in support of this (to be described in subsequent view graphs) Assumptions should be consistent with materials Time Line, in particular: -Assumed material maturation period appropriate for a flat plate or simple engineered (eg castellated, graded) first wall. More complex “engineered” structures will likely take longer. - Critical issues resolved no later than FY-06 (or before, as assumed here) -Sub-threshold ablation - Stability of LAF-W system - Helium management -Detailed structural analysis/optimization of first wall structure complete in Phase-1. -Push off radiation effects and modeling until mid Phase-2. This adds some risk. Develop Tasks/Deliverables to Achieve Overall Chamber Milestones

February 5-6, 2004 HAPL meeting, G.Tech. 7 Armor/First Wall: (1) Viable Material Structures Top-Level Goal: Develop a W/LAF structure with good bond integrity and thermal stability Deliverables (1.i)Complete initial screening through bend testing and thermo- mechanical testing. ~ 6 months (1.ii)Down select to ~3 material combinations that look the best. ~ 1year (1.iii)Assess and select most promising engineered structure(s) (including pre-testing in RHEPP, XAPPER, DRAGONFIRE Lab, He-testing) ~1 year (1.iv)Complete bonding and similar pre-screening and testing for engineered structure ~2-3 years Chamber First Wall Session

February 5-6, 2004 HAPL meeting, G.Tech. 8 Top-Level Goal:Demonstrate zero armor exfoliation. Deliverables (2.i)Model development (refinement) for He behavior in tungsten. ~6 months (2.ii)Monoenergetic He testing. ~1 year (2.iii)Spectrum testing (with foils). ~1 year (2.iv)Synergetic effect (He+H). ~1 year (2.v)Implantation/anneal to prototypic FS/W structure~ 2 years (2.vi)Similar testing as (2.ii) to (2.v) for engineered W~ 2-3 years Armor/First Wall: (2) Helium and/or Hydrogen Isotope Management Chamber First Wall Session

February 5-6, 2004 HAPL meeting, G.Tech. 9 Top-Level Goal:Demonstrate that armor should have acceptable lifetime of about 3 years. Deliverables --> Complete: (3.i)Engineering modeling (including validation) in support of short-term experimental results ~6 months (3.ii)Development of long term predictive capability (understanding mechanisms such as roughening) ~ 2 years (3.iii)Demonstration testing (RHEPP, DRAGONFIRE, XAPPER) -Cook and look experiments (scoping) ~6 months -Model validation experiments ~ 1 year -Full range of testing to enable prototypical evaluation (in conjunction with modeling) ~ 2 years -Same range of tests for engineered materials ~2-3 years Armor/First Wall: (3)Ablation (Ions & X-Rays Including Surface Roughening) Chamber First Wall Session

February 5-6, 2004 HAPL meeting, G.Tech. 10 Top-Level Goal:Demonstrate that for a nominal stress level fatigue- induced cracks will not propagate in the underlying structure and delamination will not occur. Deliverables - Complete: (4.i)Modeling of temporal stress state of W/FS interface -Fully dense material ~ 6 months -Engineered material ~ 6 months (4.ii)Thermomechanical fatigue testing of bond and fatigue crack growth -Fully dense material ~ 1.5 years -Engineered material (depending on availability) ~ 2 years (4.iii)IR thermal-fatigue of selected coupons >2 years (Prototypical conditions) 10 6 pulses Armor/First Wall: (4) Thermomechanical Fatigue and Fracture Toughness Chamber First Wall Session

February 5-6, 2004 HAPL meeting, G.Tech. 11 Top-Level Goal:Compile baseline property data base (including irradiation effects). Deliverables - Complete: (5.i)Compilation of relevant MFE material properties~6 months (5.ii)Identification of data need ~6 months (5.iii)Development of plan to measure missing properties if possible (including irradiation effects) ~1 year (5.iv)Compilation of Materials Handbook ~1 year Armor/First Wall: (5) Baseline and Irradiation Effects on Thermophysical Properties Chamber First Wall Session

February 5-6, 2004 HAPL meeting, G.Tech. 12 Top-Level Goal:Develop at least one credible and attractive blanket concept compatible with the choice of armor (W) and structural material (FS). Deliverables - Complete: (B1.i)Scoping study and down selection of blanket concepts (choose 1-2 concepts for detailed study) ~1-1.5 years (B1.ii)Detailed design study of selected blanket concept(s) ~2-3 years Blanket I.Sviatoslavsky M. Sawan R. Raffray

February 5-6, 2004 HAPL meeting, G.Tech. 13 Top-Level Goal:Develop an integrated systems code that can be used to investigate a variety of laser-IFE design options and configurations. Deliverables - Complete: (S1.i)Integrated chamber/blanket/power cycle model for 2-3 blanket options, including cost estimates. ~6 months (S1.ii)Development and inclusion of performance and costing models for KrF and DPSSL drivers. ~2 years (S1.iii)Inclusion of cost scaling models for remaining power plant systems. ~3 years System Studies R. Schmitt

February 5-6, 2004 HAPL meeting, G.Tech. 14 Evolution of chamber environment and characterization of the chamber conditions prior to each shot is a key interface issue: - Target injection and survival requirements -Laser propagation and focusing -Armor protection Top-Level Goal:Develop a multi-dimensional gas dynamic model for the IFE chamber (SPARTAN). Deliverables : (i)Explore need for and possibility of including 3-D. ~1-1.5 years (ii)Add multi-species capability. ~1-1.5 years (iii)Detailed parametric studies to characterize chamber conditions prior to each shot as a function of chamber size, yield, and gas type and density. ~1-1.5 years Chamber Interfaces Z. Dragojlovic