NSW SG 10 Dec 2014 10 Nov 2014 S. Zimmermann, NSW SG 1.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
NSW SG 11 Nov Nov 2014 S. Zimmermann, NSW SG 1.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Situation with industry
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Elec 関係、情報収集 ( 中。。 ). Design review for NSW electronics (2015/2) Design review for NSW ASIC (2015/4)
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
Technical Support Activities in PH-ADO-PO
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
MM detector construction One or several modules per sector considerations.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
M. Bianco On behalf of the ATLAS Collaboration
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS micromegas activities (MAMMA)
Report of activities in T1049 (M6-FTBF) Introduction Test beam set-up Preliminary results Conclusions.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
NSW SG 29 Oct Oct 2014 S. Zimmermann, NSW SG 1.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Micromegas for SLHC A project to investigate the use and determine the working parameters of Micromegas for SLHC tracking – in conjunction with the ATLAS.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
On behalf of the ATLAS muon collaboration
Test Beam Request for the Semi-Digital Hadronic Calorimeter
11 T Dipole Integration & Plans M. Karppinen
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Remaining items (per module) for panel construction (mostly Fabien)
Atlas: Upgrade Phase I Massimo Della Pietra.
TileCal upgrade EVO meeting Demonstrator tesks
T1 status (a selection from EDR presentations)
STT Status & News Peter Wintz (FZ Jülich) for the STT group
nSW Alignment Installation
STT Status Update Peter Wintz (FZ Jülich) for the STT group
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
Slice Test Planning Schedule(s) and Milestones.
New Calorimeter Trigger Receiver Card (U. Wisconsin)
SVD group organization, schedule, milestones
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1

NSW Milestones LHCC has requested a document with NSW milestones, in particular for 2015, to be able to assess if project remains on track. Will next be checked in autumn Already got quite a bit if “heat” from ATLAS Upgrade coordination on seemingly slipped schedule compared to the TDR, and admonishment this must not happen again and again … 10 Nov 2014 S. Zimmermann, NSW SG 2

Milestones and Schedule: TDR NSW TDR (spring 2013): 10 Nov 2014 S. Zimmermann, NSW SG 3

Milestones and Schedule: TDR 10 Nov 2014 S. Zimmermann, NSW SG 4 NSW TDR (spring 2013): Since the TDR the LS2 shutdown was moved by 6 months to start mid 2018 …

Schedule: LHCC 11/ Nov 2014 S. Zimmermann, NSW SG 5 Schedule (LHCC Upgrade Cost Group, Feb 2014) Similar/same for MicroMegas Production Site setup – until end 2014: on track Module -1 production: 1 st half 2014: completed Test beam (module -1): done Design Review for sTGC/MM detector construction: passed successfully in July  green light for module-0 Module 0 construction: autumn 2014: component procurement/ production ongoing, quadruplets to be completed in spring Qualification in GIF++: moved by ~3 months to spring 2015 Start of mass production: Mid 2015, unchanged sTGC schedule Reviews/ Milestones

Milestones 2015 Proposal: Detectors 10 Nov 2014 S. Zimmermann, NSW SG 6 MilestoneDate Decision on MM screen printing15/3/2015 ? Final Drawings for MM readout and drift PCBs15/2/2015 ?Fixed interconnect positions. MM Readout PCBs: Tender2/2015 MicroMegas Module-0 completion (incl. validation) + FDR 6/2015 MicroMegas PRR: Start of series production8/2015Includes production site review. Put milestone? MM Mass Production (LM2, SM1, SM2): 20% complete 31/12/2015Number ? MM Mass Production (LM1): 10% complete31/12/2015Number ? sTGC Cathode Boards: Tender1/2015 sTGC Module-0 completion (incl. validation) + FDR5/2015 sTGC PRR: Start of series production6/2015Includes production site review. Put milestone? sTGC Mass Production (Small Sector Modules + Large Sector Inner): 20% completed 31/12/2015 Assemble sTGC module-0 into Small Sector Wedge8/2015Really include ? MM spacer frame design and prototype, assemble MM module-0 8/2015Really include ?

Milestones 2015 Proposal: Alignment 10 Nov 2014 S. Zimmermann, NSW SG 7 MilestoneDate Alignment System PDR and Bar FDR/PRR3/2015

Milestones 2015 Proposal: Eltx 10 Nov 2014 S. Zimmermann, NSW SG 8 MilestoneDate NSW ASIC Specs + Specs Review (VMM, ROC, ART)2/2015TDS already had a PDR. Date fixed VMM3, TDS2, ART2, ROC1 Submission, after PDR7/2015 VMM3, TDS2, ART2, ROC1 Tests completed31/12/2015 VMM3A, TDS-Prod, ART-Prod Design Completed. FDR. 2/2016What about ROC ? VMM3A, TDS-Prod, ART-Prod, ROC-Prod Submission Q2/2016 ADDC, L1DDC, FEB, Trigger Processor, pad logic PDR 2/2015Date fixed. MMFE Demonstrator4/2015 MMFE Demonstrator series for construction sites6/2015 ADDC prototype 211/2015Prototype 1 now, results for PDR L1DDC prototype 29/2015Prototype 1 now, results for PDR sTGC FEB Demonstrator10/2015 Trigger Processors ?

Milestones 2015 Proposal: Mechanics 10 Nov 2014 S. Zimmermann, NSW SG 9 MilestoneDate JD, Hub and Plug – FDR7/2015 Structure – FDR10/2015 JD, Hub, Plug -- Tender9/2015 Structure -- Tender12/2015 Clear/Consolidate CERN Integration Facilities – BB5, 180, … 5/2015