DIS 2011, 12 April 2011 1 DIS 2012, 28 March 2012 Electron Ion Collider Machine Design Edward Nissen for Jefferson Lab EIC Study Group XX International.

Slides:



Advertisements
Similar presentations
High-brightness Dudnikov – type H - ion source at INR RAS Development of the high-intensity H- ion sources with peak current ~ 100 mA and small emittance.
Advertisements

Simulation Study For MEIC Electron Cooling He Zhang, Yuhong Zhang Thomas Jefferson National Accelerator Facility Abstract Electron cooling of the ion beams.
DIS 2011, 12 April DIS 2012, 28 March 2012 Conceptual Design of A Medium Energy Polarized Electron-Ion Collider at JLab Yuhong Zhang for Jefferson.
MEIC IR Design Yuhong Zhang EIC Generic R&D Advisory Committee Meeting December 13, 2012.
Status of the MEIC Machine Design Andrew Hutton Associate Director, Accelerators For the JLab EIC Study Group.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
Kevin Jordan Beam Diagnostics Collaboration Meeting 3/18/15 MEIC Design Overview.
Full-Acceptance Detector Integration at MEIC Vasiliy Morozov for MEIC Study Group Electron Ion Collider Users Meeting, Stony Brook University June 27,
Page 1 Review 09/2010 Overview of MEIC Electron Collider Ring Yuhong Zhang.
IR Optics and Nonlinear Beam Dynamics Fanglei Lin for MEIC study group at JLab 2 nd Mini-workshop on MEIC IR Design, November 2, 2012.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
MEIC Electron Cooling Simulation He Zhang 03/18/2014, EIC 14 Newport News, VA.
Page 1 Workshop 01/2011 The Accumulator/Pre-Booster Bela Erdelyi Department of Physics, Northern Illinois University, and Physics Division, Argonne National.
Ion Polarization Control in MEIC Rings Using Small Magnetic Fields Integrals. PSTP 13 V.S. Morozov et al., Ion Polarization Control in MEIC Rings Using.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Ion Collider Ring Design V.S. Morozov for MEIC study group MEIC Collaboration Meeting, JLab October 5-7, 2015.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Thomas Jefferson National Accelerator Facility Newport News, Virginia, USA ELIC: A HIGH LUMINOSITY AND EFFICIENT SPIN MANIPULATION ELECTRON-LIGHT ION COLLIDER.
Thomas Jefferson National Accelerator Facility Page 1 Concepts for ELIC- a High Luminosity CEBAF based Electron-Light Ion Collider Ya. Derbenev, B. Yunn,
MEIC: A Medium Energy Electron Ion Collider at Jefferson Lab Hadron Workshop, Huangshan July 2, 2013 R. D. McKeown Jefferson Lab College of William and.
ERHIC design status V.Ptitsyn for the eRHIC design team.
Conceptual Design of A Medium Energy Electron-Ion Collider Based on CEBAF; A Staged Approach for ELIC A. Bogacz, Ya. Derbenev, R. Ent, G. Krafft, T. Horn,
Page 1 Review 09/2010 MEIC R&D Yuhong Zhang. Page 2 Review 09/2010 Outline MEIC R&D Issues View 1: EIC AC Recommendations View 2: MEIC Design Status View.
Thomas Roser EIC AC meeting November 3-4, 2009 EIC Accelerator R&D Strategy and Programs Thomas Roser/Andrew Hutton BNL / Jefferson Lab R&D program is.
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
Overview of IR Design V.S. Morozov 1, P. Brindza 1, A. Camsonne 1, Ya.S. Derbenev 1, R. Ent 1, D. Gaskell 1, F. Lin 1, P. Nadel-Turonski 1, M. Ungaro 1,
1 Electron-Ion Collider at JLab: Conceptual Design, and Accelerator R&D Yuhong Zhang for JLab Electron-Ion Collider Accelerator Design Team DIS
Design Status of Medium-energy Electron-Ion Collider at JLab Vasiliy Morozov for Jefferson Lab EIC Study Group JLab User’s Group Annual Meeting, 5 June.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Progress on Design Studies of a High-Luminosity Ring-Ring Electron-Ion Collider at CEBAF and Its Low to Medium Energy Staging Approach* S. A. Bogacz, P.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Detector / Interaction Region Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski Joint CASA/Accelerator and Nuclear Physics MEIC/ELIC Meeting.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
ELIC Accelerator Design Balša Terzić CASA For the JLab EIC Study Group Workshop on Perturbative and Non-perturbative Aspects of QCD at Collider Energies.
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz,
MEIC Status Andrew Hutton For the MEIC Collaboration.
DIS 2011, 12 April Design Status of Polarized Medium Energy Electron-Ion Collider at Jefferson Lab Vasiliy Morozov for Jefferson Lab EIC Study Group.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz IDS- NF Acceleration Meeting, Jefferson Lab,
Full-Acceptance & 2 nd Detector Region Designs V.S. Morozov on behalf of the JLEIC detector study group JLEIC Collaboration Meeting, JLab March 29-31,
JLEIC Forward Ion Detection Region
Large Booster and Collider Ring
Electron Polarization In MEIC
Space Charge Effect Simulation Using DA Based FMM and Electron Cooling Simulation for JLab’s MEIC Project.
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Other issues and concepts under study Conclusions References
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
JLEIC Collaboration Meeting Spring 2017
Accelerator and Interaction Region
JLEIC Collaboration meeting Spring 2016 Ion Polarization with Figure-8
Introduction to the Accelerator and Design
Polarized Positrons in JLEIC
Update on ERL Cooler Design Studies
MEIC New Baseline: Luminosity Performance and Upgrade Path
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Yu.N. Filatov, A.M. Kondratenko, M.A. Kondratenko
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Status and plans for crab crossing studies at JLEIC
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
Progress Update on the Electron Polarization Study in the JLEIC
MEIC New Baseline: Performance and Accelerator R&D
JLEIC Electron Ring Nonlinear Dynamics Work Plan
HE-JLEIC: Do We Have a Baseline?
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC Alternative Design Part III
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

DIS 2011, 12 April DIS 2012, 28 March 2012 Electron Ion Collider Machine Design Edward Nissen for Jefferson Lab EIC Study Group XX International Workshop on Deep-Inelastic Scattering and Related Subjects 28 March 2012, Bonn, Germany

DIS 2011, 12 April DIS 2012, 28 March 2012 EIC at JLab Over the last decade, JLab has been developing a conceptual design of an electron- ion collider as its future nuclear science program beyond 12 GeV CEBAF upgrade The future science program, as NSAC LRP articulates, drives the EIC design, focusing on: High luminosity (above cm -2 s -1 ) per detector over multiple detectors High polarization (>80%) for electrons and (>70%) for light ions The JLab EIC machine design is based on CEBAF as full-energy electron injector A new ion complex and collider rings optimized for polarization Two detectors, one high acceptance, one high luminosity During the last three years, we have focused on a Medium-energy Electron Ion Collider (MEIC) as an immediate goal, as the best compromise between science, technology and project cost We maintained a well defined path for future upgrade to higher energies

DIS 2011, 12 April DIS 2012, 28 March 2012 MEIC Design Energy Full coverage in s from a few hundred to a few thousand Bridging the gap of 12 GeV CEBAF and HERA/LHeC Electron 3 to 11 GeV, proton 20 to 100 GeV, ion 12 to 40 GeV/u Design point: 60 GeV proton on 5 GeV electron Ion species Polarized light ion: p, d, 3 He and possibly Li Un-polarized ions up to A=200 or so (Au, Pb) Detectors Up to three interaction points, two for medium energy (20 to 100 GeV) One full-acceptance detector (primary), 7 m between IP & 1 st final focusing quad, our initial priority with a more challenging design One high luminosity detector (secondary), 4.5 m between IP and 1 st final focusing quad

DIS 2011, 12 April DIS 2012, 28 March 2012 MEIC Design (cont.) Luminosity About cm -2 s -1 (e-nucleon) optimized at s=2000 GeV 2 Greater than cm -2 s -1 for s= GeV 2 Polarization Longitudinal at the IP for both beams, transverse at IP for ions only Spin-flip of both beams (at least 0.1 Hz) being developed All polarizations >70% desirable Upgradeable to higher energies and luminosity 20 GeV electron, 250 GeV proton and 100 GeV/u ion, in facility on the Jefferson Lab site Positron beam highly desirable Positron-ion collisions with similar luminosity

DIS 2011, 12 April DIS 2012, 28 March 2012 MEIC Electron Ring Footprint Ring design is a balance between Synchrotron radiation  prefers a large ring (arc) length Ion space charge  prefers a small ring circumference Multiple IPs require long straight sections Straights also hold required service components (cooling, injection and ejection, etc.) 3 rd IR (125 m) Universal Spin Rotator (8.8°/4.4°, 50 m) 1/4 Electron Arc (106.8°, 140 m) Figure-8 Crossing Angle: 2x30° Experimental Hall (radius 15 m) RF (25 m) Universal Spin Rotator (8.8°/4.4°, 50 m) Universal Spin Rotator (8.8°/4.4°, 50 m) Universal Spin Rotator (8.8°/4.4°, 50 m) IR (125 m) Injection from CEBAF Compton Polarimeter (28 m) 1/4 Electron Arc (106.8°, 140 m)

DIS 2011, 12 April DIS 2012, 28 March 2012 MEIC Layout Vertical stacking for identical ring circumferences Horizontal crab crossing at IPs due to flat colliding beams Ion beams execute vertical excursion to the plane of the electron orbit for enabling a horizontal crossing Ring circumference: 1340 m Maximum ring separation: 4 m Figure-8 crossing angle: 60 deg. Interaction point locations: Downstream ends of the electron straight sections to reduce synchrotron radiation background Upstream ends of the ion straight sections to reduce residual gas scattering background Electron Collider Ion Collider Large Ion Booster Interaction Regions Prebooster Ion source Three Figure-8 rings stacked vertically Ion transfer beam line Medium energy IP with horizontal crab crossing Electron ring Injector 12 GeV CEBAF SRF linac Warm large booster (up to 20 GeV/c ) Cold 97 GeV/c proton collider ring Electron path Ion path

DIS 2011, 12 April DIS 2012, 28 March 2012 MEIC and Upgrade on JLab Site Map

DIS 2011, 12 April DIS 2012, 28 March 2012 Luminosity Concept: Following the Leader Luminosity of KEKB and PEP II follow from Very small β* (~6 mm) Very short bunch length (σ z ~ β*) Very small bunch charge (5.3 nC) High bunch repetition rate (509 MHz)  KEK-B already over 2x10 34 /cm 2 /s KEK BMEIC Repetition rateMHz Particles per bunch / / 2.5 Beam currentA1.2 / / 3 Bunch lengthcm0.61 / 0.75 Horizontal & vertical β*cm56/ / 2 Luminosity per IP, cm -2 s ~ 14 JLab is poised to replicate same success in electron-ion collider: A high repetition rate electron beam from CEBAF A new ion complex (so can match e-beam) Electron cooling to allow short ion bunches

DIS 2011, 12 April DIS 2012, 28 March 2012 Parameters for Full Acceptance Interaction Point ProtonElectron Beam energyGeV605 Collision frequencyMHz750 Particles per bunch Beam CurrentA0.53 Polarization%> 70~ 80 Energy spread10 -4 ~ 37.1 RMS bunch lengthmm107.5 Horizontal emittance, normalizedµm rad Vertical emittance, normalizedµm rad Horizontal β*cm10 Vertical β*cm22 Vertical beam-beam tune shift Laslett tune shift0.06Very small Distance from IP to 1 st FF quadm73.5 Luminosity per IP, cm -2 s

DIS 2011, 12 April DIS 2012, 28 March 2012 Parameters for High Luminosity Interaction Point ProtonElectron Beam energyGeV605 Collision frequencyMHz750 Particles per bunch Beam CurrentA0.53 Polarization%> 70~ 80 Energy spread10 -4 ~ 37.1 RMS bunch lengthmm107.5 Horizontal emittance, normalizedµm rad Vertical emittance, normalizedµm rad Horizontal β*cm44 Vertical β*cm0.8 Vertical beam-beam tune shift Laslett tune shift0.06Very small Distance from IP to 1 st FF quadm Luminosity per IP, cm -2 s

DIS 2011, 12 April DIS 2012, 28 March 2012 MEIC Design Details Our present design is mature, having addressed -- in various degrees of detail -- the following important aspects of MEIC: Forming the high-intensity ion beam: SRF linac, pre and large booster Electron and ion ring optics Detector design IR design and optics Chromaticity compensation Crab crossing Synchrotron rad. background Ion polarization Electron polarization Electron cooling Beam synchronization Beam-beam simulations Forming the high-intensity ion beam: SRF linac, pre and large booster

DIS 2011, 12 April DIS 2012, 28 March 2012 Central detector EM Calorimeter Hadron Calorimeter Muon Detector EM Calorimeter Solenoid yoke + Muon Detector TOF HTCC RICH Cerenkov Tracking 2 m 3 m 2 m 4-5 m Solenoid yoke + Hadronic Calorimeter MEIC Primary “Full-Acceptance” Detector Distance IP – electron FFQs = 3.5 m Distance IP – ion FFQs = 7.0 m (Driven by push to 0.5  detection before ion FFQs) Pawel Nadel-Turonski & Rolf Ent solenoid electron FFQs 50 mrad 0 mrad ion dipole w/ detectors (approximately to scale) ions electrons IP ion FFQs 2+3 m 2 m Make use of the (50 mr) crossing angle for ions! detectors Central detector, more detection space in ion direction as particles have higher momenta Detect particles with angles below 0.5 o beyond ion FFQs and in arcs. Detect particles with angles down to 0.5 o before ion FFQs. Need up to 2 Tm dipole in addition to central solenoid. 7 m

DIS 2011, 12 April DIS 2012, 28 March 2012 Detector Integration Large 50 mrad crossing angle: no parasitic collisions, improved detection, fast beam separation Forward small-angle hadrons pass through large-aperture FFB quads before detection FFB / spectrometer dipole combo optimized for acceptance and detector resolution GEANT4 / G4beamline model Forward Acceptance (B < 6 T)

DIS 2011, 12 April DIS 2012, 28 March 2012 Interaction region: Ions β x * = 10 cm β y * = 2 cm β y max ~ 2700 m Final Focusing Block (FFB) Chromaticity Compensation Block (CCB) Beam Extension Section Whole Interaction Region: 158 m Distance from the IP to the first FF quad = 7 m Maximum quad pole tip field at 100 GeV/c = 6T Allows ±0.5  forward detection Evaluating detailed detector integration and positions of collimators Symmetric CCB design for efficient chromatic correction 7 m

DIS 2011, 12 April DIS 2012, 28 March 2012 Chromaticity and Dynamic Aperture Compensation of chromaticity with 2 sextupole families only using symmetry Non-linear dynamic aperture optimization under way  p/p = 0.3  at 60 GeV/c  5  p/p Ions  p/p = 0.7  at 5 GeV/c  5  p/p Electrons Normalized Dynamic Aperture w/o Octupole with Octupole

DIS 2011, 12 April DIS 2012, 28 March 2012 Crab Crossing Restore effective head-on bunch collisions with 50 mrad crossing angle  Preserve luminosity Dispersive crabbing (regular accelerating / bunching cavities in dispersive region) vs. Deflection crabbing (novel TEM-type SRF cavity at ODU/JLab, very promising!) IncomingAt IPOutgoing

DIS 2011, 12 April DIS 2012, 28 March 2012 Electron Cooler Electron bunches circulates 100+ times, leads to a factor of 100+ reduction of current from a photo-injector/ERL ion bunch electron bunch circulator ring Cooling section solenoid Fast kicker SRF Linac dump injector energy recovery Eliminating a long return path could cut cooling time by half, or reduce the cooling electron current by half, or reduce the number of revolutions by half 20 m Solenoid (15 m) SRF injector dump Cooling at Figure-8 crossing Conventional electron cooling Staged electron cooling scheme ERL based to relax power and cathode requirements

DIS 2011, 12 April DIS 2012, 28 March 2012 Initial IBS scattering time ~1439s Initial Electron Cooling time ~201s Using the design parameters and reasonable initial beam sizes equilibrium can be achieved allowing for the luminosities required. BetaCool Simulations Beam ParametersCooler Parameters Beam Momentum 20 Gev/cHoriz/Vert Size.06 cm Horiz Emittance186 nmRMS Bunch Length 1.5 cm Vert. Emittance30 nmBeam Current1.5 A Mom. Spread.00037Cooler Length60m Part. Number 4.16x10 ⁹ Magnetic Field2T

DIS 2011, 12 April DIS 2012, 28 March 2012 System Layout cooling solenoids rechirper dechirper recirculation/decompression transport CCR ERL beam exchange system recovery/recompression transport injector dump Initial design fits within the footprint of the MEIC crossover region. Can be built using easily obtained parts without technical issues.

DIS 2011, 12 April DIS 2012, 28 March 2012 Cooling Test Facility 1)Determine lifetime of a bunch in the circulator ring. 2)Examine feasability of magnetized electron gun. 3)Test fast kickers, currently under development. 4)Beam dynamics of an ERL with recirculation. Jefferson Lab Free Electron Laser FacilityTest of Recovered Energy Circulation System

DIS 2011, 12 April DIS 2012, 28 March 2012 Summary Close and frequent collaboration with our nuclear physics colleagues regarding the machine, interaction region and detector requirements have taken place. This has led to agreed-upon baseline parameters: Energy range: 3 to 11 GeV electrons, 20 to 100 GeV protons Luminosity around cm -2 s -1 (e-nucleon) per interaction point Longitudinally polarized (~80%) electrons, longitudinally or transversely polarized (>70%) protons and deuterons Ring layouts for MEIC have been developed, which include two interaction regions, one full acceptance, one high luminosity. Chromatic compensation for the baseline parameters has been achieved in the design. Significant progress has been made with determining and optimizing the dynamic aperture. Designs for staged Electron cooling have been developed and will be tested using the Jefferson Lab FEL.

DIS 2011, 12 April DIS 2012, 28 March 2012 JLab EIC Study Group A. Accardi, S. Ahmed, A. Bogacz, P. Chevtsov, Ya. Derbenev, D. Douglas, R. Ent, V. Guzey, T. Horn, A. Hutton, C. Hyde, G. Krafft, R. Li, F. Lin, F. Marhauser, R. McKeown,V. Morozov, P. Nadel-Turonski, E. Nissen, F. Pilat, A. Prokudin, R. Rimmer, T. Satogata, M. Spata, C. Tennat, B. Terzić, H. Wang, C. Weiss, B. Yunn, Y. Zhang --- Thomas Jefferson National Accelerator Facility J. Delayen, S. DeSilva, H. Sayed, -- Old Dominion University M. Sullivan, -- Stanford Linear Accelerator Laboratory S. Manikonda, P. Ostroumov, -- Argonne National Laboratory S. Abeyratne, B. Erdelyi, -- Northern Illinois University V. Dudnikov, R. Johnson, -- Muons, Inc A. Kondratenko, -- STL “Zaryad”, Novosibirsk, Russian Federation Y. Kim -- Idaho State University

DIS 2011, 12 April DIS 2012, 28 March 2012 IBS scattering time ~76s Electron Cooling time ~50s Using the design Parameters and reasonable initial beam sizes equilibrium can be achieved allowing for the luminosities required. BetaCool Simulations Beam ParametersCooler Parameters Beam Momentum 60 Gev/cHoriz/Vert Size.06 cm Horiz Emittance7.517 nmRMS Bunch Length 1.5 cm Vert. Emittance1 nmBeam Current1.5 A Mom. Spread.00045Cooler Length60m Part. Number 4.16x10 ⁹ Magnetic Field2T