Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
1 Expansion Tanks. 2 3 Expansion Tanks WHY USE THEM TYPES LOCATION SIZING.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Verbal Modeling Anchors: Manganese  Matt Morabito Jamie Polan.
CMS Pixel Technical Board Meeting – Dec. 16, Forward Pixel Cooling System Information Joe Howell.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
Other Flight Pressure Systems Phase III Flight Safety Review 12 Jan 2009.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Cooling R&D at RWTH Aachen Lutz Feld, Michael Wlochal (RWTH Aachen University) CEC Meeting, CERN Lutz Feld, Michael Wlochal (RWTH Aachen University)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
IBL cooling thermal chock incident 15 October The IBL cooling team.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
14 May 2009Hans Postema - CERN CMS Upgrade Workshop Tracker Phase I upgrades 14 May
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
TT2A Mercury Jet Experiment The Cryogenic System Roger Bennett and Yury Ivanyushenkov CCLRC, Rutherford Appleton laboratory, Chilto, Didcot, Oxon, OX11.
R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Limits of CO 2 Cooling A clear explanation that anyone can understand (the goal) Hans Postema & Joao Noite PH-CMX-DS1.
Installation of the T600 at Fermilab CSN2, September 22,
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
A two-stage system for the future cooling system.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
Plant & Reactor Design Passive Reactor Core Cooling System
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
For the CMS Pixel detector
Installation of the T600 at Fermilab
Status of Cooling Development in Karlsruhe
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Safety approval of the installed copper cooling pipes
Proximity Cryogenics P&IDs meeting
For the CMS Pixel detector
Forum on Tracking Detector Mechanics - Bonn, May 2016
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Aachen Status Report: CO2 Cooling for the CMS Tracker
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
Recirculating CO2 System
Question & Suggestions March 17th
Status Report on Fermilab CO2 cooling activities
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Aachen Status Report: CO2 Cooling for the CMS Tracker
Second Meeting of the Material Budget & Engineering Working Group
Status and Prospects of Tracker Services Hans Postema (CERN)
For the CMS Pixel detector
Presentation transcript:

Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN

Cooling Pipes The currently installed cooling pipes are virtually impossible to replace People ask: “Is this really the case” Please have a look at the following slides 1 December 20082Hans Postema - CERN

Empty YB0 – far left 1 December 20083Hans Postema - CERN

YB0 – fully cabled 1 December 20084Hans Postema - CERN

YB0 - numbers Tracker cooling pipes below all the cables HB: 180 cables, 180 optical fiber cables EB: 1600 cables, 180 optical fiber cables Tracker: 3000 cables, 640 Optical fiber cables 9 month plus, installation time Removing and reinstalling ~10 year old EB cables is inviting trouble 1 December 20085Hans Postema - CERN

Re-use of installed pipes The currently installed pipes are OD=14 and OD=16 mm copper pipes with a wall of 1 mm Cannot be used for 2 phase CO2 cooling without special precaution But can be used when the system design takes care that pressures remain below a limit Avoiding 100+ bar pressures is also advantageous for detector design 1 December 20086Hans Postema - CERN

Storage tank The system contains a cooled storage tank When system is inoperative, all liquid is condensed in the tank, all warm components are filled with gas (Standard for cryogenic systems) A very similar system is used for the CDF COT flange cooling, same concept, different fluid, different temperature. See next slide 1 December 20087Hans Postema - CERN

CDF – COT endplate cooling Courtesy Richard Schmitt FNAL 1 December 20088Hans Postema - CERN

Which pressures Strong request for detector operation with coolant at +15 C. Avoids condensation during the installation and testing phase. For this a safety valve setting at 57 bar, corresponding to +20 C seems acceptable. Normal operation is below 0 degree C, which corresponds to 35 bar 1 December 20089Hans Postema - CERN

Operation modes Normal operation, system cooled by commercial chiller, CO2 temperatures between 0 and -20 C, pressures 35 to 20 bar Testing during installation, system cooled by chilled water, temperature +15 C, pressure 50 bar Storage during shutdown, cooled by standard CERN chilled water system, temp +5 C, 40 bar 1 December Hans Postema - CERN

CERN safety First contact with CERN safety (preliminary) Pipe-work to be tested at 1.25x maximum operating pressure 1.25 x 57 bar = 71 bar Safety valve set at 57 bar CO2 charge will not be vented as long as the tank remains below +20 degrees C 1 December Hans Postema - CERN

Copper pipe Installed pipes are “soft” copper 16x1 mm Material tested by S. Sgobba – CERN UTS 217 Mpa, elastic limit 0.5% 106 Mpa Stress during pressure testing 55 Mpa Safety factor of ~2 during pressure testing! Situation seems rather comfortable All this TBC by CERN safety 1 December Hans Postema - CERN