Friday 5/1/2009 0900 meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

LCW Upgrades Update Booster Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions were.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
G2P Target installation and Beyond. Schedule Pivot before.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
Proton Source Water Systems Proton Source Workshop December 8, 2010 Maurice Ball.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
2015 Shutdown Joe Compton 3/11/2015. RIL PIP Work  Install operational laser notcher  5 days  Dave Johnson & Todd Johnson.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
The Operation of the Tevatron Vacuum system Authors David Augustine Alex Chen Scott McCormick 1.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
March 7 th Shutdown Shutdown Begins: Monday morning, March 7 th :00 Beam OFF Safety System Testing 08:00 Rack out KRSS, switch MI house power to.
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
5/15/ meeting. -21 work days to shutdown -31 calandar days to shutdown -Today is May 15 th all Jobs are supposed to be entered in the work list.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 10/06/2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
ELENA installation and commissioning status
XFEL Vacuum System Commissioning
J. Seeman Assistant Director for PPA/LCLS
Presentation transcript:

Friday 5/1/ meeting

I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :

Parts and pieces: All equipment must be vacuum certified before these parts go into tunnel, we are currently missing. Mi 52 & electron cloud and micro wave absorbers (late July early August) One crystal collametor Tev. Possibly but tight Replace hadron monitor in minos absorber hall in Install 7 new kickers in Mi tunnel Mi 8 multi wires internal parts 1 st week of June. Numi multi wires

-Current electronic work list has 311 items in it. -I will show at a later meeting Cryo, EE support, controls, RF, instrumentation and Rad safety tests. - No jobs accepted after May 15 th. Meaning the shutdown lists need to be decided on. -All long shut down jobs need to be in the electronic work list( long shuddown). If they are in the short shutdown list you will need to move them over.

31 work days to the shutdown 46 calandar days to the shutdown

Linac Tank 5 Drift tube replacement( 10 days) over 5 weeks. Dump work vacuum leak checking ~6 days maintentance Replace LN2 hosing to copper(4 days) Replace HV breakers in 5 of the old linac stations (Rack A5) NTF will want to run Will be down completely for 3 weeks in July.(no NTF running

Major Booster Jobs Corrector Installation 10 weeks (S) Start & Finish Short Straight installation Finish long straights (even locations) GMPS – transformers and switchgear Install L12 kickers (S) L14 manifold Switch MI8 line Booster components on to Booster LCW. Repair candy cane/choke leaks/old tubing Septa MP02 and MP03 strip line and flags

Other Booster jobs Booster 400MeV vacuum repairs(2 days Move BV809 valve ds of B:V809 (depends on MI8 vac) From instrumentation rebuild several multi wires in 8gev line (will the parts get here in time?) Replace B:Q803 power supply Replace B:CPSDMP and B:OCT power supplies Connect B:HTMH22 near 400MeV line Install GMPS hipot switches Replace tunnel sump for old 8 GeV line Replace old isolation valves with ball valves Install new East Gallery LCW return line Install LCW Return lines to CUB Laser Profile Monitor installation (maybe). FESS relamping tunnel lights

Mi 2 nova buildings 10 weeks for Mi 14&40 1 week survey(S) Install 7 kickers in mi days (s) may not be be ready for start of shutdown Install beam valve mi52 & electron cloud and micro wave absorbers (12 days) Mi water change 720 hoses 50 days Clean last of 4 heat exchangers 12 days) Relamp lights Pipe fitters in Mi40 flournate new line 3 weeks will be done(contractors) 2 New shielding mask at 307 (3 days)

Tevatron Warm A-3, D-3, D-1, E-1, F-1, to repair cold leaks. Only 4 house will be warmed up still deciding which 1 of the 5 won’t be done. Leak test to determine leak area F-2, E-2, B-1, A-1, A-4. 1 Week Start installing new turbo’s with new pumps 43 days Misc. gauges 12 days Fix phasing to 480 volts around tev ring. 20 days Install Vertical Crystal Collimator. 9 days Regenerate NEG strips at E-0 &D0. 7 days Tev water clean 6 heat exchanger 12 days test emergency lights and bulb replacements

As found B0 and D0 low beta quads.If movment needed more discussion will occur. Roll measurements of all quads and dipoles (operator help?) no survey needed. Un roll 60 quads and dipoles around the ring(s) 4 a day (Won’t warm up)15 days Change B0 low beta HLS sensors to capactive read out types Maintenance on D0 low beta HLS sensors add water replace any bad sensors Maintenance on Tev quad HLS sensors add water replace any bad sensors Replace 4 bad dipole stands and 4 bad quad stands (s) Fix bad vacuum guages as possible Fix bad oxygen sensors Conning towers (Probably Not) Maintance 24 days

Pbar Replace Inject bend (IB7)s in xport 4 days Install momentum collimator 2 days (S) Two 4-8 ghz kicker tank at(40-50 sector)move it towards pit,7-8 feetaccumulator needs bake) aprox 3 weeks.(s) add door at pre target 2 days h20 leak manifold hv100 string replace manifolds tech divisions 4 magets who will install 16 days (4 days per magnet) target station( sem) install? Target group s Pre shutrdown a60 straight ice ball. Install vacuum valve and remove cap off. For all hydrogen experiment e862 Maintance 10 days

Recycler TSP maintance etc 8 days Pelatron maintenance big list 25 days Changing kicker at RR weeks Flushing and replace glycol in mi31 glycol skid Move magnets( some survey requests)(s) Numi Remove all dipole covered in steel refurbish manifolds with peek put back steel, this job chokes tunnel creates potential road bock to other MI access. (S) 3 people speciality needed Replace hadron monitor in minos obsorber hall 15 days (high radiation) Fix water leak in horn 1 and 2. (S) Target replacement(3-4 weeks) (s) safety, mechanical General maintance 10 weeks+ Sy120 Change 2 epb dipoles in xfer hall in extraction line(3 days )(s)

Summary: 2 separate master sub outages(6/22 & 7/27) 2 separate Kautz rd sub outages. (7/27&8/24?)

Fess Other stuff Lots of feeder maintenance means more power outages. Fix oil leak on AP50 and AP50-22 (not house pwr)

Master sub off 4 weeks Replace 1 SF6 switch on L11120 (Jumper out for one winter) Fix Transformer 84 tap changer at master sub. T83 tap changer maintenance. T83 replace lightning arrestor. Ocb test master sub Batavia needs to add 36 large grounding straps on all master sub. power poles. Connect 36 grounding straps for static line. Batavia needs to paint all 18 power poles from master sub (Batavia) 4 weeks (scarry)

Kautz off (4 weeks) Install 3 SF6 switches for kautz rd substation( all 3 switches will be jumpered out for one winter) Add dampers and repair static ground lines 345 kv and relay testing Krs main breaker maintance CB119 breaker maintenance(345 kv breaker) SF6(10 year maintance) All 13.8 kautz breaker maintance. Battery system maintance

Engineering projects Feeders 96/97 extended from Mi8 to Mi10 part of MuNu project(pulsed PwR) Feeders 82/85 at Mi60 add new switch and transformer and Pad for Mi RF Fcc electrical upgrade Sy service building transformer off for 1 week; (building on generator)Purpose to run power to FCC to power a new transformer. (Means we are adding a FCC transformer on to feeder 43 (SY))

Fess water Need to install 2 new 95Lcw pumps(these are big pumps) one already leaks like a sieve Both are older than most parts of the lab. Need 2 days with CUB off( will schedule on weekend) for maintance. 55Deg LCW water off 2 weeks to install VSD & and work on Chiller.