DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
The Australian Energy Regulator Public Forum NSW electricity distribution & transmission revenue proposals July 2014.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
LDZ System Charges – Structure Methodology 26 April 2010.
Shrinkage Forum 04 June 2013 Roy Malin. 2 Best Practice - Areas of Inconsistency AreaBackgroundAction Definition of All-PE systems Used to identify networks.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Shrinkage Forum 22 January 2014 Roy Malin /15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Elk Grove Water District – Finance Meeting Water Rate Update and Connection Fees Habib Isaac – Principal Gregg Tobler – Task Manager January 30, 2013.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Structure of Charges Year-end review for DCMF 22 November 2007.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
EDCM Workshop Workstream C Update Andy Pace - Chair 10 November | Energy Networks Association.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Default price-quality paths for gas pipeline services Briefing on the Commission’s final decision for financial market analysts 28 February 2013.
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
Revised draft decision: Initial default price-quality paths for gas pipeline services Briefing for financial market analysts 24 October 2012.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Background Current balance of LDZ System and Customer charges
Fair Go Rates System Dr Ron Ben-David Chairperson
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Transmission Workgroup 4th October 2012
School Cleaning Update
Mod 0621 Amendments to Gas Transmission Charging Regime
LDZ System Charges – Structure Methodology 26 July 2010
Fair Go Rates System Dr Ron Ben-David Chairperson
NTS Entry Charging Review Update
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Exit Capacity Substitution and Revision
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Key movements from September 17
Presentation on behalf of all DNs Lorraine Goodall - SGN
Mod 0621 Amendments to Gas Transmission Charging Regime
DNPC07 Proposal DNPC07 proposed that Capacity/Commodity split of the LDZ System Charges should be changed to 100/0 The percentage of the Firm Capacity.
Transmission Workstream 2nd December 2010
Pricing and Margins Manager National Grid Distribution
Presentation transcript:

DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009

DNPC05 Background DNPC04 responses Cost Analysis Proposed methodology changes Impact analysis Timing of implementation

Background DNPC04 Consultation in October 2008 January 2009 Ofgem announced Competition Act investigation into electricity DNO/IDNO boundary charging Possible implications for gas Ofgem asked DNs to delay submitting final proposal May 2009 Ofgem indicated investigation would not have significant impact on gas proposal New consultation DNPC05 Takes account of DNPC04 responses Uses updated 2007/8 and 2008/9 cost analysis

DNPC04 Responses 13 responses: 10 from shippers/suppliers, 3 from iGTs Use of network-specific split Majority of respondents agreed that it is appropriate No clear preference on process for updating the split Greater clarity sought Timing of implementation Majority sought longer notice than 5 months Other issues raised Impact on iGTs and RPC Cost analysis methodology Level of information provided

Cost Analysis: Changes since DNPC04 Mains and Services replacement expenditure Now use levels assumed in price control More reflective of ongoing levels Shrinkage costs Own Use and Theft costs still allocated to LDZ System Leakage costs now separately identified for LDZ System and Customer categories Emergency costs Higher unit cost weighting now applied to external jobs relative to internal jobs Consistent with basis of Emergency Service charges to iGTs Based on 2007/8 and 2008/9 data Uses costs reported to Ofgem for regulatory reporting purposes Consistent framework and definitions across two years and DNs

DNPC05 Cost Analysis

Updating of Revenue Split Current analysis gives a robust basis to determine a cost-reflective revenue split between LDZ System and Customer charges Responses to DNPC04 did not give clear majority support for any of the updating options set out there – most support for review of cost basis every 5 years Benefits of keeping a set revenue split until costs re-analysed Predictable Enhances ability of suppliers to offer longer-term contracts Appropriate to update analysis as soon as practical at start of next price control period (2013)

Proposed Methodology Changes To set charges so as to give a forecast balance of revenue from LDZ System and Customer charges in line with a DN specific estimate of the split of relevant costs To assess balance of costs relating to LDZ System and Customer charges using an average of an appropriate number of years for which data on a consistent basis is available for each network To review the balance of costs relating to the LDZ System and Customer charges at the start of each new Price Control period, except in exceptional circumstances

Impact on Charges

Impact of proposed charges for Directly Connected sites

Impact of proposed charges for CSEPs

Timing of implementation Many respondents to DNPC04 wanted more than 5 months notice Time to pass through changes in longer-term contacts More time for impact on iGT connected customers DNPC05 Proposals Smaller level of impact on average than previous proposals Should aim to implement as soon as practical to achieve benefits Indicatives will show combined impact of changes No impact through RPC on iGT charges until following year Allows over a year for iGTs to engage with Ofgem Propose to implement from 1 April 2010 Indicative notices published by 2 November will show charges both with and without proposal implemented

Your views Should the charging methodology be changed so that the balance between LDZ System charges and Customer charges for each DN is based on a network specific estimate of the split of relevant costs? Should the balance of costs relating to LDZ System and Customer charges be assessed using an average of an appropriate number of years for which data on a consistent basis is available for each network? Should the balance of charges relating to LDZ System and Customer charges be reviewed at the beginning of each Price Control period, except in exceptional circumstances? Is there any reason why the proposal should not be implemented from 1st April 2010?

Next Steps Consultation response period ends 18th November Once responses have been collated, the DNs will produce a report and submit a proposal to Ofgem. Ofgem will then have 28 days in which to choose to veto or not to veto the proposal. Please respond by Wednesday 18 November

Questions