David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
BOX PUSHING TECHNOLOGY
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
SUNY Canton Facilities Project Update Miscellaneous.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
City of Palm Beach Gardens SUBSURFACE TURF DRAINAGE SYSTEM FOR NATURAL ATHLETIC FIELDS SUBSURFACE TURF DRAINAGE SYSTEM FOR NATURAL ATHLETIC FIELDS ITB PF.
Building Strong! IHNC SURGE BARRIER GIWW MRGO. Building Strong! Trestle Construction About 2000’ of trestle allows precision installation of piles and.
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
Retaining Wall Design Slope Stability on US-189 MAQuiGr Engineering
DRAFT Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80.
Reconstruction of the Eads Bridge Highway Deck
EDT 51-Floor Plan Design1 Weekend Cabin Retreat Project Basements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
Foundation Systems.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
Drainage Services Department Drainage Project Division Contract No. DC/2007/01 Contract Title: Drainage Improvement Works in Ki Lun Tsuen, Kwu Tung, Ma.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
Preparation before placing concrete Chapter 3. Chapter Topics Subgrade preparation Compaction around buried pipes and excavations Establishing grades.
Parking Lot 53 Hydraulic Analysis Aaron Gutierrez Aaron Libson William Ryman Alejandro Valenzuela.
Unit 1 Types of Construction
ASSALAMUALAIKUM & GOOD MORNING
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
Chapter 18 Foundations.
Exterior Wall (Masonry)
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
1 ADA & ACCESSIBILITY Chapter ADA Accessibility -- Public restroom Public Restroom.
Introduction to a pit installation
Mike Baumann Statewide Utility Engineer January 22, 2015.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
1 HVACR116 – Trade Skills Structural Drawings. 2.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 4 Slide 1 Unit 4 Brick, Stone, Steel, and Concrete Construction.
Article 23 Town and Schools Parking Lots, and Sidewalks Improvements Article 23 Schools and Towns Parking Lots.
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Cabrillo Boulevard Bridge Over Mission Creek Replacement COASTAL DEVELOPMENT PERMIT HEARING May 14, 2014 Agenda Item W 22B.
Introduction to Spring Development
The building of structures from small individual units laid in and bound together by mortar Some common materials you ca find in this practice are brick,
Orthographic Drawings
AHU-18 replacement and AHU-16 & 17 restoration
City of Phoenix Utility Coordination & Inspection.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
City of Belmont Pavement Reconstruction Project October 15, 2014.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Illustrated Summary of Design Guidelines City of Ames, Iowa.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
Downtown Marina Authorization for 30% Design Contract for Downtown Marina and Adjacent Areas & Functions Stockton City Council December 6, 2005 Agenda.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Rural Access Programme Development through access (4C) Quality Management Plan Presentation for CPD Training Ramesh Khatakho Engineering Officer, Kalikot.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016
Residential Wall Systems
Project Purpose and Objective
Why We Arrived With Windows Upgrade Support ?
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Minuteman Vocational Technical Regional High School Progress
Residential Wall Systems
Minuteman Vocational Technical Regional High School Progress
Illinois Waterway 2020 Consolidated Closure
Concrete A structural material made by combining cement, sand, aggregate, and water.
Minuteman Vocational Technical Regional High School Progress
Huntsville High School Sports Lighting Upgrades
Presentation transcript:

David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1

2

Stacy Boulevard Bulkhead Improvement Project Existing Conditions 3

4

Stacy Boulevard Bulkhead Improvement Project Proposed Work 5 Work Involves: Pre-construction coordination, Excavation Removal of the existing stone bulkhead in sections, Installation of a new reinforced concrete footing, Reconstruction of the mortared stone bulkhead utilizing existing and supplemental stones, Installation of filter fabric with drainage system, Backfilling, Reconstruction of the existing stone revetment, Stairway reconstruction and repairs, Resetting of existing or supplemental granite capstones, Installation of new railings and concrete sidewalk, Restoration of landward park features including upgrades to lighting, irrigation, sod, benches and miscellaneous park features.

Stacy Boulevard Bulkhead Improvement Project Proposed Work 6

Blynman Canal Bulkhead Improvement Project 7

Blynman Canal Bulkhead Improvement Project Existing Conditions 8

Blynman Canal Bulkhead Improvement Project Proposed Work 9 Work Involves: Pre-construction coordination, Install reinforcing, Install waterside steel sheet cofferdam, Concrete fill between sheeting wall and bulkhead, Wall joint repairs, Excavate/remove upper portion of bulkhead, Install landside steel sheetpile cofferdam, Reconstruction of the upper stone bulkhead, Construct perpendicular wall, Reconstruction of the existing bulkhead with concrete footing, concrete bulkhead with stone veneer, Filter fabric/drainage, Remove and reconstruct upper portion of bulkhead STA to 2+00, Restoration of landward park features.

Blynman Canal Bulkhead Reconstruction Project 2002 Work – South Side 10

11 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects Questions