Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.

Slides:



Advertisements
Similar presentations
Global Congress Global Leadership Vision for Project Management.
Advertisements

GDE-Tohoku Meeting WG-2 (SCRF) : Tasks and Goals Akira Yamamoto 1.SCRF efforts since Fermilab Meeting 2.Replan of SCRF R&D for TDP1 & 2 3.Tasks and Goals.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Report of Visiting PKU, Tsinghua U. IHEP Dec. 9 and 10, 2009 Kaoru Yokoya, Marc Ross, and Akira Yamamoto Report to ILC-EC, Dec. 11, 2008.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
ILC-EDR Kick-off Meeting Main Linac Integration Organization and Tasks Sept. 27, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Main Linac Integration To.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
Presented by Marc Ross - for the ILC Project Managers: Research and Development Resources PAC Review, Vancouver, Marc Ross, Fermilab - Global.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Main Linac (SCRF) Technology Area Guidelines for the Meeting Akira Yamamoto Parallel Session ILC-GDE Meeting, Fermilab, Oct , 2007.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Report of HLRF KOM/ALCPG07 S. Fukuda(KEK) R. Larsen(SLAC)
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Americas Regional Planning Exercises Tor Raubenheimer SLAC Beijing GDE Meeting February 4 th 2007.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Saclay / Orsay visit – (GDE Project Managers) 1 R&D Plan: ‘Engineering Design’ Phase - presentation to Saclay / Orsay Marc Ross, Akira Yamamoto,
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ACD Down-Select Criteria and Time Scales for HLRF ML-KOM FNAL September 27 、 2007 S. Fukuda, KEK & Ray Larsen, SLAC For the ILC HLRF Collaboration.
Global design effort Americas 1 FY08-09 ILC-Americas planning G. Dugan ILC-Americas Planning meeting SLAC Sept. 13, 2006.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
SCRF WebEx Monthly Meeting Agenda and Reports from PM
ILC Cryogenics Work Package Status and Plans
Oct 22 Group Leaders Planning meeting
Meeting for S1-Global module design Cryomodule and Cryogenics
SCRF Monthly WebEx Meeting Sept. 22, 2010
EDR Planning, Cost Review and Technical Risk Analysis
ILC Project Management Status
ILC ‘Engineering Design’ (ED) Phase
Global System Kick-off Meeting
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
Preliminary Project Execution Plan
Presentation transcript:

Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007

M. Ross, ILC GDE Engineering Design Activity: Builds on the: BCD – the baseline description ( ) RDR – contains the backbone of our design and the ‘value’ estimate ( ) The EDR: will have the next update for these, based on ‘value engineering’ and more in-depth understanding, and Will include a plan for project execution –Including how to build the tunnels and high technology components

M. Ross, ILC GDE Scope of ED Activity Resources provided (almost all) by participating institutions and their funding agencies –(small ‘common fund’) –Limitations known for the coming 3 years –Project control over resources may increase during EDA Duration is known, Resources known, Scope is ? –Decreased ED resources  increased risk Design and R & D prioritization based on ‘return for investment’

M. Ross, ILC GDE RDR Completion: Success of the GDE – a ‘grass-roots’ organization without a strong institutional center –(opposite of CERN) –Capitalize on this and –Lay groundwork for a stronger – yet still de-centralized - ‘ILC Engineering Design Project’ –Critical Mass Our community ‘votes with its feet’… –given the structure and the –opportunity to contribute to their labs future and the future of the science.

M. Ross, ILC GDE Near-ness of ILC Is the ILC infinitely far off? How do we attract the technology/scientific community? What about Orbach’s Feb 2007 statement? By completing R & D and Design milestones –Some formality needed to confront political process and bringing in strong new faces –Akira Yamamoto, KEK; Jim Kerby, Fermilab; etc organizing and aligning intellectual, engineering resources in labs –enabled through regional financing. Exciting technology  SRF-based accelerator projects –XFEL; Fermilab Proton linac; ERL

M. Ross, ILC GDE Path to Get Started on the EDR Plan: –ED Activity is a ‘Project’ subject to accountability/transparency –Deliverable is a documented strategy and plan Resources –Common Fund –Negotiation with regional/institutional managers Staffing –Need engineering management Schedule –Planning Milestones due: Fermilab and Tohoku

M. Ross, ILC GDE Top Priority: Push the Technology AND Control the COST fundamental  containment of the current RDR Value estimate. potential cost-reduction via good engineering practices –clearly identified in the RDR. Together with the risk-mitigating prioritized R&D program the focus of the EDR work.

M. Ross, ILC GDE Industrialization Second focus:  increasing direct involvement of industries –Engineering development / cost saving through industrial partnerships Preparation for mass production –is a critical issue for key technologies, –understanding how individual countries can contribute in-kind This must be achieved on a truly worldwide basis, –Intend to follow free-market –including seeking out and developing potential (new) industrial bases

M. Ross, ILC GDE Our Community – global basis: The GDE is committed to these goals –as a global project,  this is a major ILC strength –building on the success of the RDR. We must also: –ensure that internal momentum is maintained and –foster continued growth in the enthusiasm and commitment of the international ILC community. –grow the resources: funding; new institutions; universities Challenge  –maintain effective communication paths between co-workers separated by great distances. –ensure strong overlap between GDE/ED activities and priorities of the major institutions/stake-holders. Strength  –diverse technical expertise –wide ranging laboratory infrastructure –(result of years of hard work and preparation.)

M. Ross, ILC GDE Access to Resources Common Fund Support –Administrative Staff for Director and PM –Cost & Schedule Regional Support –Technical Management Staffing –R & D Financial Resources –The Regional Directors have an important role Authorize the plan They connect the ILC EDR Project to technical expertise

M. Ross, ILC GDE Managing a non-centrally funded project: green indicates a commitment: –institute will deliver MoUs facilitate connection: (see Shekar) – Project Management (authority and responsibility) and institutions (funding and resources). The ‘C’  coordinating role in a WP –Each WP has only one coordinator. technical

M. Ross, ILC GDE Example Work Package Coordination  Area: Main Linac Technology (draft) Regional/Intsitutional Effort: - Director-US: Mike Harrison - Director-EU: B. Foster - Director-AS: M. Nozaki Technical Effort (MLT): - Project Manager: A. Yamamoto - Associate Managers:: T. Shidara, J. Kerby, * Group leader, ** Co-leader RegionsInstitutesInstitute LeadersCavity (Process) - L. Lilje* Cavity (Prod./Int.) - H. Hayano* Cryomodule - N. Ohuchi* - H. Carter(tbc)** Cryogenics - T. Peterson* HLRF - S. Fukuda* ML Integr. - C. Adolphsen* US Cornell Fermilab SLAC ANL TJNL H.Padamsee R. Kephart T. Raubenheimer H.Padamsee C.Adolphsen H.CarterT.Peterson R.LarsenAdolphsen EU DESY CERN Saclay Orsay INFN Spain R.Brinkman J. Delahaye O. Napoly A.Variola C. Pagani ParmaTavian AS KEK Korea Inst. IHEP India Inst. K.YokoyaNoguchi Saito HayanoOhuchi Fukuda Not all slots assigned – WP/ WP coordinators under consideration

M. Ross, ILC GDE EDR Project and Technical Area Group Leaders –Total 25 (!)  7 from Fermilab –Margaret Votava (Fermilab) for Controls –Responsible for: Work Package definition & draft allocation Area baseline Organizing / drafting decision process

M. Ross, ILC GDE Technical Milestones: SCRF ‘S0’ cavity processing R&D high -gradient cryomodule, ‘S1’ phased completion of each region’s SCRF test facilities: ILCTA_NML, STF, XFEL support systems ILC project cryomodule production plan including definition of cost -reduction and cost -containment design and R & D efforts development and identification of qualified vendors for cavity and cryomodule production beam testing to support ILC parameters –cryogenic load testing, –higher-order-mode extraction and –flexible, precise, high level RF controls

M. Ross, ILC GDE Planning Phase (July 07 - March 08) Milestones – Project Management Team releases all necessary project guidance, tools, and organizational information to Level-3 Managers. –Level-3 Managers provide WBS dictionary, preliminary list of work packages, and preliminary list of issues, decision points, and resource requirements. Interim Deliverables (Oct 07) – Engineering Design Project Management Plan version 1 – WBS template and guidance document for Level-3 Managers – Change control template and guidance document for L3 Managers Deliverable (March 08) – ED Project WBS dictionary for Levels 1-3 – Preliminary outline of Engineering Design Report – Preliminary list of final deliverables for the Engineering Design phase – Preliminary resource plan – Prioritized list of issues and decision points to be addressed during ED Phase