LEED NC Indoor Environmental Quality INTENT Slide Editor: James A

Slides:



Advertisements
Similar presentations
The Pollution Within: Sick Building Syndrome (SDS)
Advertisements

SAINT PAUL SUSTAINABLE BUILDING POLICY Training Module Six Indoor environmental quality requirements Saint Paul Sustainable Building Policy.
To Flush or Not to Flush Compliance with LEED-NC ® 2.2 EQ 3.1 & 3.2 Tom Hanlon LEED AP, NEBB Cx.
Presented By: Kary S. Amin Nova Environmental, Inc.
PowerPoint ® Presentation Chapter 15 Troubleshooting and Mitigating IAQ Problems Troubleshooting and Mitigating IAQ Problems Overview of Non-IAQ Problems.
… Demystifying Prerequisites and Credits. LEED OVERVIEW CERTIFIED, SILVER, GOLD or PLATINUM: Based on the accumulation of credits. A LEED ® Certified.
Heating, Ventilating, and Air-Conditioning
“Do not take anyone’s advice as to how this building should be assembled.”
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
The House as a System 1. Systems in a Home Electrical Plumbing Comfort Control (HVAC) Structural Moisture Control Air Infiltration Thermal Insulation.
Indoor Air Quality Presented by: Mark Wilson Summit Project Management.
The Three Tiered Philosophy
LEED-CI LEED for Commercial Interiors
Green Building Leadership in Energy and Environmental Design (LEED)
Introductions: Tom Boyd – Tonn and Blank Construction, LEED Green Associate Tom Boyd – Tonn and Blank Construction, LEED Green Associate Sr. Martha Ann.
Become a LEED Accredited Professional Session 4. Green Building Rating System Categories: 1.Sustainable Sites 14 total possible points in 8 categories.
1 Meeting ASHRAE Fundamentals, Standard 55 & 62.1 with Chilled Beams Displacement Ventilation.
The House as a System 1. Air Temperature and Water Vapor.
Presentation for. Why Entrance Matting? ► Safety for your guests, members and employees ► Protect your floors ► Reduce Maintenance Costs ► Improve Indoor.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
Spray Finishing Operations/Spray Booth March 9, 2009.
Station 3 ?? Air Meters Combustion Analyzer Carbon Monoxide Carbon Dioxide Particles Air Flow Vane Anemometer Exhaust Flow Box Pressures CAZ Test.
46 Blackstone Street LEED-NC v2.1 Platinum 46 Blackstone, LEED Platinum.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT Project 1 DS 413: Design Studio 413 May 9, 2012.
Chapter 4: Air Leakage Control: Materials and Techniques
BECOMING GREEN Santa Margarita High School Academic Building.
LEED NC Reference List WMSIE FORMAT Slide Editor: James A. Strapko LEED Source:
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT Project 4 DS413: Design Studio 413 May 9, 2012.
MECHANICAL ASPECTS OF MICHIGAN UNIFORM ENERGY CODE MIAM DOHERTY INN CLAIRE, MICHIGAN MARK RILEY.
A Sustainable Residential Design Project Project 16 DS 413: Design Studio 413 May 9, 2012.
PRISHA PROPERTIES INDIA PVT LTD.
A Sustainable Residential Design Project Project 8 DS413: Design Studio 412 May 9 th,2012.
Implementing Demand Controlled Ventilation to Meet ASHRAE Standard By Klas C. Haglid, P.E., R.A., CEM 1.
LEED Green Associate | Study Session 5
Knocking The Rust Off The Rust Belt Calfee, Halter & Griswold LLP, The Calfee Building, 1405 East Sixth Street, Cleveland, Ohio Cleveland | Columbus.
ARCH-432 Vapor Retarders and Air Barriers Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain.
REGULATIONS. LIMITATIONS Availability of funds Lack of scientific data Property rights of individuals.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
LEED Indoor Environmental Quality names of people in group.
LEED New Construction & Major Renovations Rating System
The Role of Compact Storage in Green Building Design Program No.: CSGBD Provider Name: Spacesaver Corporation Provider No.: J197.
IMPROVING INDOOR ENVIRONMENTAL QUALITY 5. Slide header copy In This Chapter 5-1 > The real estate manager’s role > Materials > Operations and maintenance.
Indoor Environmental Quality
Residential Ventilation & IAQ Requirements for Existing Homes History, ASHRAE 62.2, and the RTF’s Role Regional Technical Forum October 13 th, 2009.
HVACR416 - Design IAQ / Ventilation / Pathways. Ventilation Most air handling units distribute a mix of outdoor air and re-circulated indoor air. Some.
The Basics of Formaldehyde: What You Need to Know.
Healthy Indoor Environments David W. Bearg, PE, CIH June 4, 2003 Greening the Government Conference, Philadelphia, PA.
Improved Precision Leading to Improved Energy Efficiency Edward Decker AE 790 – Intelligent Buildings June 6, 2006.
LEED-NC Market Transformation As of All statistics exclude pilot projects 350 M gsf 50 States 13 Countries 323 Certified Projects 2805 Registered.
African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP.
ENVELOPE. LIGHTING.
The Contemporary Home Collection. green construction process includes:  Recycled program and was te elimination programs used in the plant  High efficienc.
Evan McNamara Penn Valley Elementary School Construction Management Narberth, Pennsylvania Presentation Outline: Project Background LEED-EB Analysis Finish.
High Performance Workshop/Charrette Indoor Environmental Quality Session 7.
Project 15 DS413: Design Studio 413 May 9, 2012.
V3 vs. v4 New Protocols for LEED Tommy Linstroth, Principal.
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
MEMORANDUM OF UNDERSTANDING (MOU) Federal Leadership in High Performance and Sustainable Buildings.
Day 4 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
Uponor | LEED ® Review Dave Zweber Channel Marketing Mgr.
County of Tuolumne Building and Safety Division and TCBI Joint Training 2010 California Code Update Series Storm Water Prevention/Green Building Standards.
VENTILATION AND AIR CONDITIONING Under the Subject Industrial Safety and Environment || ||
Lori A. Brown, LEED AP BD+C – Power Jam Study! Lorisweb.com
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
Week 6– Lecture Indoor Environmental Quality (IEQ)
Update on USGBC LEED and Air Filtration NAFA 2008 Annual Convention San Francisco, CA September 19, 2008 by Francis (Bud) J. Offermann PE CIH Indoor.
Green Cleaning to Meet LEED (Leadership in Energy and Environmental Design) Existing (Green) Building Operations and Maintenance Requirements.
LEED BD+C – Integrative Process
Leadership in Energy and Environmental Design (LEED)
Chapter 3B: INDOOR AIR QUALITY
Presentation transcript:

LEED NC Indoor Environmental Quality INTENT Slide Editor: James A LEED NC Indoor Environmental Quality INTENT Slide Editor: James A. Strapko LEED Source: www.intheleed.com

Indoor Environmental Quality 8 Credits; 15 Points EQPR1: Minimum Indoor Air Quality EQPR2: Environmental Tobacco Smoke (ETS) control EQc1: Outdoor Air Delivery Monitoring EQc2: Increase Ventilation EQc3.1: Construction IAQ Management, During Construction EQc3.2: Construction IAQ Management, Before Occupancy EQc4.1: Low-Emitting Materials, Adhesives & Sealants EQc4.2: Low-Emitting Materials, Paints & Coatings EQc4.3: Low-Emitting Materials, Carpet Systems EQc4.4: Low-Emitting Materials, Composite Wood & Agrifiber

Indoor Environmental Quality 8 Credits; 15 Points EQc5: Indoor Chemical Pollutant Source Control EQc6.1: Controllability of Systems, Lighting EQc6.2: Controllability of Systems, Thermal Comfort EQc7.1: Thermal Comfort, Design EQc7.2: Thermal Comfort, Verification EQc8.1: Daylighting & Views, Daylight 75% of Spaces EQc8.2: Daylighting & Views, Daylight 90% of Spaces

EQ Prerequisite 1 Minimum Indoor Air Quality (IAQ) Performance

EQP1: EQ Prerequisite 1 Minimum Indoor Air Quality (IAQ) Performance 1st of 2 prerequisites in Indoor Environmental Air Quality (EQ for short) Intent: to establish minimum IAQ performance to enhance indoor air quality in buildings contribute to the well-being of the occupants Implementation: Meet minimum requirement of Sections 4 thru 7 of ASHRAE 62.1-2004: Ventilation for Acceptable Indoor Air Quality  Mechanical Ventilation Systems: designed using Ventilation Rate procedure OR applicable local code (whichever is more stringent) Naturallly Ventilated buildings: comply with ASHRAE 62.1-2004. Code: ASHRAE 62.1-2004: Ventilation for Acceptable Indoor Air Quality, Sections 4 thru 7 Submittal Phase:  design

EQ Prerequisite 2 Environmental Tobacco Smoke (ETS) Control

EQP2: EQ Prerequisite 2 Environmental Tobacco Smoke (ETS) Control Intent:  Minimize exposure of building occupants, indoor surfaces, and ventilation systems to ETS (Environmental Tobacco Smoke). Implementation: Option 1: Prohibit Smoking  no smoking except outdoors at least 25′-0” from: entries outside air intakes operable windows Option 2: Designated Areas no smoking except in designated area and outdoor (same rules as previous for outdoor) Designated smoke rooms to: effectively capture, contain and remove ETS from building be directly exhausted to outdoors enclosed with deck to deck partitions operate at negative pressure to adjacent spaces Option 3 (residential only): No smoking in common areas.  no smoking in all building common areas wall, ceiling and floor penetrations are to be sealed off doors are to be weather stripped be tested for performance (ASTM E779-03)

EQP2: EQ Prerequisite 2 Environmental Tobacco Smoke (ETS) Control Code:  ANSI/ASTM E779-03, Standard Test Method for Determining Air Leakage Rate by Fan Pressurization Residential Manual for Compliance with California’s 2001 Energy Efficiency Standards (For Low-Rise Residential Buildings), Chapter 4 Submittal Phase: design

EQ Credit 1 Outdoor Air Delivery Monitoring

EQ Credit 1: 1 Point Outdoor Air Delivery Monitoring Intent: Provide capacity for ventilation system monitoring to sustain occupant comfort and well-being. Implementation: Install Permanent monitoring systems that provide feedback on ventilation system performance systems to generate ALARM when conditions vary by 10% set point Mechanically vented spaces: Densely Monitored Space: > 25 people/1000SF monitor CO2 levels Monitor location to be 3′ to 6′ above floor finish for non-densely occupied spaces provide direct outdoor airflow measure device. detect when system is 15% below design rate Naturally Ventilated Space: Monitor CO2 CO2 and airflow measures by: pilot tubes, venturi meters, rotating vane anemometers feed into HVAC and BAS systems Code: none Submittal Phase: design

EQ Credit 2 Increase Ventilation

EQ Credit 2: 1 Point Increase Ventilation Intent: Provide additional outdoor air ventilation to improve IAQ for improved occupant comfort, well-being of occupants and productivity. Implementation: Mechanically Vented Spaces: increase breathing zone outdoor air ventilation rates to 30% above minimum ASHRAE 62.1-2004 rates Naturally Vented Spaces: design system to meet Carbon Trust Good Practice Guide 237 (1998). make sure ventilation is effective by flow diagram in Figure 1.18 of CIBSE Application Manual 10: 2005 use diagrammatic calculations to show design meets CIBSE or.. use macroscopic, multi-zone, analytic mode to predict room-by-room airflows naturally ventilate 90% of occupied spaces per ASHRAE 62.1-2004 Codes: ASHRAE 62.1-2004: Ventilation for Acceptable IAQ Carbon Trust Good Practice Guide 237 (1998): Natural ventilation in non-domestic buildings CIBSE Application Manual 10 (2005): Natural ventilation in non-domestic buildings Submittal Phase: design

EQ Credit 3.1 Construction IAQ Management Plan - During Construction

EQ Credit 3.1: 1 Point Construction IAQ Management Plan - During Construction Intent: Reduce IAQ problems associated with Construction/Renovation process Help to sustain comfort and well-being of construction workers and building occupants Implementation: Develop and implement an Indoor Air Quality (IAQ) Management Plan for during construction during construction, meet or exceed SMACNA IAQ Guidelines for Occupied Buildings Under Construction, Ch 3 (2007) Protect on-site or installed absorptive materials from moisture damage insulation, carpeting, ceiling tile and drywall AHU’s, during construction, must have filters with Minimum Efficiency Reporting Value (MERV) of 8 per ASHRAE 52.2-1999. Control pollutant sources spec materials with low VOC’s control exhaust fumes Interrupt Contamination Pathways depressurize work areas provide temporary barriers

EQ Credit 3.1: 1 Point Construction IAQ Management Plan - During Construction Implementation, continued: Interrupt Contamination Pathways depressurize work areas provide temporary barriers Housekeeping activities protect porous surfaces dust control Schedule the installation of materials to avoid contamination Member of General Contractor’s Team to be IAQ manager. Codes: SMACNA IAQ Guidelines for Occupied Buildings Under Construction, Ch. 3 (2007) ASHRAE 52.2-1999: Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size Submittal Phase: construction

EQ Credit 3.2 Construction IAQ Management Plan - Before Occupancy

EQ Credit 3.2: 1 Point Construction IAQ Management Plan - Before Occupancy Intent: Reduce IAQ problems associated with Construction/Renovation process Help to sustain comfort and well-being of construction workers and building occupants Implementation: Develop and implement an Indoor Air Quality (IAQ) Management Plan for pre-occupancy phase Option 1: FLUSH-OUT after construction but before occupancy 14,000 cubic feet of O/A (outside air) per sf of floor area maintain 60 degrees < 60% relative humidity OR if occupancy occur prior to flush out delivery of 3500 cubic feet of O/A (outside air) per sf of floor area ventilate at .30 cfm/sf. minimum 3 hours per date until 14,000 cf/sf of O/A is delivered USE MERV 13 filters for HVAC

EQ Credit 3.2: 1 Point Construction IAQ Management Plan - Before Occupancy Option 2: Air Quality Testing conduct an IAQ baseline test after construction, prior to occupancy use EPA Compendium of Methods for the Determination of Air Pollutants in Indoor Air. Code: EPA Compendium of Methods for the Determination of Air Pollutants in Indoor Air Submittal Phase: construction

EQ Credit 4.1 Low Emitting Materials - Adhesives & Sealants

EQ Credit 4.1: 1 Point Low Emitting Materials - Adhesives & Sealants Intent: Reduce the quantity of indoor air contaminants that are odorous, irritating, and or harmful to the comfort and well-being of installers and occupants. Implementation: all ADHESIVES and SEALANTS used in interior of building (inside weather proofing system & applied on-site) is to comply with South Coast Air Quality Management District (SCAQMD) Rule #1168 and Green Seal (GS) Standard for Commercial Adhesives GS-36. flooring adhesives, fire-stopping sealants, caulking, duct sealants, plumbing adhesives, cove base adhesives. Code: South Coast Air Quality Management District (SCAQMD) Rule #1168, October 3, 2003 Amendment Green Seal Standard 36 (GS-36), Oct, 2000 Submittal Phase: construction

EQ Credit 4.2 Low Emitting Materials - Paints & Coatings

EQ Credit 4.2: 1 Point Low Emitting Materials - Paints & Coatings Intent: Reduce the quantity of indoor air contaminants that are odorous, irritating, and or harmful to the comfort and well-being of installers and occupants. Implementation: all PAINT and COATINGS used in interior of building to comply with following: PAINTS : Green Seal (GS) 11 Anti-Corrosive and Anti-Rust Paints : GS-03 Clear Wood Finishes, Floor Coatings, Stains, Sealers, Shellacs: SCAQMD Rule 1113 Code: Green Seal Standard GS-11 Green Seal Standard GS-03 SCAQMD: South Coast Air Quality Management District Rule 1113, Architectural Coatings Submittal Phase: construction

EQ Credit 4.3 Low Emitting Materials - Carpet Systems

EQ Credit 4.3: 1 Point Low Emitting Materials – Carpet Systems Intent: Reduce the quantity of indoor air contaminants that are odorous, irritating, and or harmful to the comfort and well-being of installers and occupants. Implementation: All CARPET and CARPET CUSHIONS installed in building interior shall meet testing and product requirement of the Carpet and Rug Institute’s Green Label Plus Program. All carpet adhesives shall meet EQ4.1. Code: Carpet and Rug Institute Green Label Plus Testing Program. Submittal Phase: construction

EQ Credit 4.4 Low Emitting Materials - Composite Wood & Agrifiber

EQ Credit 4.4: 1 Point Low Emitting Materials - Composite Wood & Agrifiber Intent: Reduce the quantity of indoor air contaminants that are odorous, irritating, and or harmful to the comfort and well-being of installers and occupants. Implementation: Composite wood and Agrifiber products (MDF, particleboard, plywood, wheatboard, strawboard, panel substrates, door cores) used in interior of building shall contain NO ADDED UREA FORMALDEHYDE RESINS. Code: none Submittal Phase: construction

EQ Credit 5 Indoor Chemical and Pollutant Source Control

EQ Credit 5: 1 Point Indoor Chemical and Pollutant Source Control Intent: Minimize potentially hazardous particulates and chemical pollutants. Implementation: Minimize and control pollutant entry Minimize Cross contamination between occupied areas Install permanent entryway systems at least 6′-0" long to capture dirt grates grills Exhaust rooms where hazardous chemicals are stored keep negative pressure at .50 cfm/sf If Mechanically Vented , installed filters should have MERV 13 rating or better Codes: ASHRAE 52.2-1999: Method of Testing General Ventilation Air Cleaning Devices for Removal Efficiency by Particle Size Submittal Phase: design

EQ Credit 6.1 Controllability of Systems - Lighting

EQ Credit 6.1: 1 Point Controllability of Systems - Lighting Intent: Provide high levels of lighting system control by individual occupants or multi-occupant spaces for various tasks for occupant’s comfort and well-being. Implementation: Individual lighting controls for 90% minimum of building occupants Multi-occupant lighting system controls that meet group needs and preferences Code: none Submittal Phase: design

EQ Credit 6.2 Controllability of Systems - Thermal Comfort

EQ Credit 6.2: 1 Point Controllability of Systems – Thermal Comfort Intent: Provide high level of thermal comfort system control for individuals and multi-occupant spaces to promote productivity, comfort and well being of building occupants. Implementation: Individual comfort controls for 50% min. of building occupants. Operable windows are OK instead if: occupants are stationed within 20′-0″ inside and 10′-0″ to either side of the window opening. meets standards of ASHRAE 62.1-2004 for natural ventilation Also provide thermal comfort controls for multi-occupancy rooms, adjustable to suit needs of various groups to occupy the space. thermal comfort conditions under ASHRAE 55-2004 Codes: ASHRAE 62.1-2004: Ventilation for Acceptable Indoor Air Quality ASHRAE 55-2004: Thermal Environmental Conditions for Human Occupancy Submittal Phase: design

EQ Credit 7.1 Thermal Comfort - Design

EQ Credit 7.1: 1 Point Thermal Comfort - Design Intent: Provide a comfortable thermal environment supporting productivity and well-being of building occupants. Implementation: Design HVAC systems and Building Envelope per ASHRAE 55-2004. Evaluate air temp. radiant temp, air speed, relative humidity Coordinate with EQ P1. EQ 1, & EQ 2. Code: ASHRAE 55-2004: Thermal Comfort Conditions for Human Occupancy Submittal Phase: design

EQ Credit 7.2 Thermal Comfort - Verification

EQ Credit 7.2: 1 Point Thermal Comfort - Verification Intent: Assessment of building’s thermal comfort over time. Implementation: Survey within 6-18 months after occupancy anonymous responses of overall satisfaction of thermal performance If 20% or more of building occupants dissatisfied, develop a plan for corrective action Plan should be in accordance with ASHRAE 55-2004 Code: ASHRAE 55-2004: Thermal Comfort Conditions for Human Occupancy Submittal Phase: design

EQ Credit 8.1 Daylighting and Views - Daylight 75% of Spaces

EQ Credit 8.1: 1 Point Daylighting and Views - Daylight 75% of Spaces Intent: Provide connection between indoor and outdoor spaces through introduction of daylight and views into regularly occupied areas of the building. Implementation: OPTION 1 - GLAZING FACTOR CALCULATION achieve min. 2% glazing factor in minimum of 75% of regularly occupied areas. OPTION 2 - DAYLIGHT SIMULATION MODEL through computer simulation, demonstrate min. daylight illumination level of 25 footcandles in min. of 75% of regularly occupied areas. OPTION 3 - DAYLIGHT MEASUREMENT through records of indoor light measurements, demonstrate daylight illumination level of 25 footcandles in min. of 75% of regularly occupied areas. ALL CASES only area associated with room (actual square footage) can be applied toward the 75% total area calculation provide daylight redirection and/or glare control devices

EQ Credit 8.1: 1 Point Daylighting and Views - Daylight 75% of Spaces Code: none Extra Credit: Provide daylighting for 90% (instead of 75%) of occupied areas. Submittal Phase: design

EQ Credit 8.2 Daylighting and Views - Daylight 90% of Spaces

EQ Credit 8.2: 1 Point Daylighting and Views - Daylight 90% of Spaces Intent: Provide connection between indoor and outdoor spaces through introduction of daylight and views into regularly occupied areas of the building. Implementation: Achieve direct line of site to outdoor for occupants in 90% of all regularly occupied areas glazing between 2′-6″ & 7′-6″ Plan View: area within sight lines drawing from perimeter vision glazing Section View: direct line of sight can be drawn from area to perimeter vision glazing Code: none Extra Credit: case by case basis Submittal Phase: design

LEED NC Indoor Environmental Air Quality INTENT Slide Editor: James A LEED NC Indoor Environmental Air Quality INTENT Slide Editor: James A. Strapko LEED Source: www.intheleed.com