Aligning the connections and capacity processes 1 Mike Wassell Transmission workstream, January 2012.

Slides:



Advertisements
Similar presentations
Offshore Transmission Giles Stevens Head of offshore electricity transmission.
Advertisements

Indicative Business Case
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Need to Invest Investment Objectives and Case for Change Determine Potential Value for Money Strategic Case: Economic Case: Financial Case: Affordability.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Case development for a fund supporting CSOs active in national health policies Presentation to the IHP+ Steering Committee.
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Need to Invest Investment Objectives and Case for Change Programme Option Identification and Assessment Analysis Strategic Case: Economic Case: Financial.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Review Group 221 Session 3: 13 October Introduction  During this presentation we will seek views on the following questions.  What should the.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Assignment of NTS Entry Capacity Transmission Workstream 02 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Network Flexibility Mike Wassell Transmission workstream, January
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Gas Transmission and Capacity Pricing Workshop – Topics for Discussion 11 April 2013.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Entry Capacity Overrun price calculation
Modification Proposal 0283 Update
EU Implementation Programme
Transmission Workgroup 4th October 2012
UNC Trader User – Licence obligations
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Assignment Workshop 2 16th September 09, Solihull.
Mod 0452 (PARCA) – Further thoughts
Exit Capacity Substitution and Revision
Consideration of issues raised by UNC Modification Proposal 0244
Draft Capacity & Connection Plan
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Development of Entry Capacity Substitution
Transmission Workgroup 6th March 2014
Topic raised at July 2009 Distribution Workstream
Long Term Non Firm Capacity Update
Mod 230: QSEC and AMSEC Timings
Consideration of issues raised by UNC Modification Proposal 0244
Proposer: Debbie Brace Panel Date: 20th March 2014
Ofgem presentation to Gas Transmission Workstream
DSC ChMC CSS update 09th January 2019
Commercial Arrangements For Gas Quality Service – Introduction
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Capacity Access Review
EU CAM Network Code and CMP Guideline Proposal Update
DSC ChMC Switching Programme Update 9th October 2019
Presentation transcript:

Aligning the connections and capacity processes 1 Mike Wassell Transmission workstream, January 2012

2 Background  We have spoken about connections and capacity processes through our Talking Networks’ events – which discussed what you want us to deliver during the next price control period  Some stakeholders requested that the connections and capacity processes be co-ordinated; streamlining and simplifying them  We raised the issue of needing to account for the timescales associated with The Planning Act (~7 years for delivering of infrastructure) within the process  We want to deliver greater certainty to our customers  Stakeholders requested that this be taken forward as an industry, under existing governance 2

Current position  Since the Talking Networks workshop in November we have been considering some possible options  There are pros and cons associated with each and these are not necessarily mutually exclusive  They require further development to fully understand the impacts of each option on us, and stakeholders 3 Status QuoManage planning act under the current arrangements Connect and manageContractual solutions, potential new products, increased constraint management funding Anticipatory InvestmentZonal reinforcement based on commercial intelligence (rather than auction/application signal) Extended lead timese.g. 72 months obligated lead times Contractual alignment of timescales Earlier and phased user commitment outside of capacity auction / application process

Proposed way forward  We propose a new Review Group is set up to take this topic forward, with the first meeting on the morning of 23 rd January  “Developing processes for future Gas Access”  At this first meeting we propose discussing and exploring the options we have been considering  In addition we request and welcome any potential solutions you may also wish to bring to the meeting  We are seeking the Transmission Workgroup’s approval for this approach 4