SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.

Slides:



Advertisements
Similar presentations
Victor KRYSHKIN 9th Topical Seminar Innovative Particle and Radiation Detectors, Siena, 24 May 2004 PRODUCTION AND QUALITY CONTROL OF CMS END CAP HADRON.
Advertisements

V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Helical Milling Unit 71.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
1 Tungsten supply and assembly, test beam setup Market survey on tungsten supply Ideas on the frame design Experimental area Test beam setup Wolfgang Klempt/
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
PNPI, R&D MUCH related activity ● Segmentation ● Simulation of the neutral background influence ● R&D of the detectors for MUCH ● Preparation to the beam.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
GIGATRACKER SUPPORTING PLATE COOLING SYSTEM SIMULATION 1Vittore Carassiti - INFN FECERN, 11/12/2007.
The HCAL barrel absorber structure
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
T. Matsushita 1 Scintillating fibre tracker The scintillating fibre tracker reconstructs muon tracks before and after the MICE cooling section in 4 T magnetic.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Magnetized Iron Neutrino Detector MIND Technology & Engineering.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Prototype Assemblying, SiPM Characterization and QC
LCWS11 WG4 Fully featured accelerating structure engineering design
IFR mechanics status of the detector & tooling development
Roberto Calabrese Ferrara University and INFN
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Status of GASPARD mechanics
ANADOLU ÜNİVERSİTESİ Industrial Engineerng Department
PANDA Muon Group Meeting, Protvino 7 June 2011 G
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Vladimir Rykalin NRC KI IHEP Baksan - 50, Nalchik, June, 2017.
IFR Status Summary W. Baldini on behalf of the IFR Group
Status of Prototype Preparation and SiPM Characterization
SILICON PIXELS DETECTOR
Backward Calorimetry For SuperB
The Beam Test at Fermilab:
LumiCal mechanical design, integration with LDC and laser alignment
SPARC Review Committee Meeting
IFR detector mechanics
Outlines : Introduction . Construction . Control .
HCAL Modules -First Ideas
Integration and IR Hall
Development of GEM Detectors for Muon Tomography
RPC and LST at High Luminosity
SuperB Integration Summary of previous integration sessions.
Inner DET. Integration Inner detector envelope Radial clearances.
Limited Streamer Tube Project Summary
ISO view of pipe w/ individual EC detector installed
Vinyl Machine.
Presentation transcript:

SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012

OUTLINE Detector – Status of the design Tooling – Status of the development 2V. Carassiti - INFN FEINP PAN 07-09/09/2012

STATUS OF THE DETECTOR DESIGN- 1 DETECTOR BASELINE Grooves in the scintillator accomodating the fibers The fibers coming from the scintillator are joined to the PM the signal coming from the PM is collected through a PCB and sent by an electrical wire 3V. Carassiti - INFN FEINP PAN 07-09/09/2012 GROOVE FIBER PM PCB WIRE CONNECTOR

STATUS OF THE DETECTOR DESIGN- 2 DETECTOR LAYOUT BARREL The longitudinal scintillators are 50 mm in width and 10 mm thick ; the transversal ones are 100 mm in width and 10 mm thick END CAPS Both the longitudinal and transversal scintillators are 50 mm in width and 10 mm thick 4V. Carassiti - INFN FEINP PAN 07-09/09/2012 BARREL BEAM AXIS

STATUS OF THE DETECTOR DESIGN- 3 5V. Carassiti - INFN FEINP PAN 07-09/09/2012 DETECTOR LAYOUT Scintillators, fibers & PM are inside a dark box The PM wires are collected in a bunch coming out from the box The dark box is made by foils of aluminum 1 mm thick DARK BOX BUNCH OF WIRES

THE BARREL SEXTANT - 1 6V. Carassiti - INFN FEINP PAN 07-09/09/2012 Since now 9 layers of detector each sextant are foreseen Absorbers are foreseen into the gaps between the plates STEEL PLATE DETECTOR LAYER EXTERNAL LAYER GAP

THE BARREL SEXTANT - 2 7V. Carassiti - INFN FEINP PAN 07-09/09/2012 Is not yet clear how to accommodate the external layer EXTERNAL LAYER

THE ASSEMBLED BARREL 8V. Carassiti - INFN FEINP PAN 07-09/09/2012 CORNER PLATE

THE END CAPS - 1 9V. Carassiti - INFN FEINP PAN 07-09/09/ detector layers are allowed ; number of layers TBD The hole of the forward end cap is conical shaped ; the hole of the backward end cap is cylindrical shaped The layers have to be splitted in three parts and follow the holes shape DETECTOR LAYERS SPACERSDETECTOR LAYERS

THE END CAPS V. Carassiti - INFN FEINP PAN 07-09/09/2012 The detector layers of the backward end cap have to be shaped also following the cut giving the space for the cooling circuit COOLIN G CYLINDRICAL HOLE CONICAL HOLE

Status of the tooling development The tooling development regards : – Machine making the grooves housing the fibers – Machine dispensing the resin fixing the fibers A production plan is needed (space, timing, labor, …..) including the quality control ( and the tooling for it ) The toolings for the installation of the detector in the experimental area are also needed 11V. Carassiti - INFN FEINP PAN 07-09/09/2012

Machine making the grooves The machine consist of : A plane supporting the scintillator An head equipped with a cutting disk making the linear groove An head equipped with a cylindrical milling cutter making the curved grooves for the exit in place of the fibers The machining time is approximately 8 min each scintillator corresponding to 3,5 weeks/1000 scinti (40 h/week) 12V. Carassiti - INFN FEINP PAN 07-09/09/2012

Groove machine sketches (I) 13V. Carassiti - INFN FE CUTTING DISK CYLINDRICAL MILLING CUTTER INP PAN 07-09/09/2012

Machine dispensing the resin The machine consist of : A plane supporting the scintillator An head equipped with a resin dispenser The dispensing time has to be checked 14V. Carassiti - INFN FEINP PAN 07-09/09/2012

machine machine sketches (I) 15V. Carassiti - INFN FE RESIN DISPENSER INP PAN 07-09/09/2012

Conclusions The detector design is in a good advanced status of development The toolings needed for the construction of the detector are under way The toolings for the assembly in the experimental area have to be developed 16V. Carassiti - INFN FEINP PAN 07-09/09/2012