Creation of the Lower Pearl River Basin Ecosystem Study Commission ( LPRBESC) March 2016 Flood Conference June 21, 2016 E. deEtte Smythe, Ph.D. St Tammany.

Slides:



Advertisements
Similar presentations
Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
Advertisements

Moffatt Thomas Lower Boise River Wetlands Restoration Project Sponsor:Pioneer Irrigation District Presenter: Scott L. Campbell Legal Counsel for Pioneer.
Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
Restoring and protecting Louisiana’s coast January 18, 2011 CPRA Meeting David Peterson Asst. Attorney General and AG Designee to CPRA Civil Division Lands.
7:00 pmWelcome and introductions 7:05pmHLWD planning overview Plan update process 7:25 pmStakeholder involvement Watershed problems 7:40 pmPublic comment.
Streamgaging Task Force Final Report Advisory Committee on Water Information Herndon, Virginia April 3, 2002.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
Naples Bay Surface Water Improvement and Management (SWIM) Plan
1 Preparing Washington for a Changing Climate An Integrated Climate Change Response Strategy Department of Ecology Hedia Adelsman, Executive Policy Advisor.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Murphy 2012 Bruneau River and Murphy Flows Liz Cresto September 19, 2012.
Planning for Restoration of the Mississippi River in the Twin Cities Christian Lenhart.
National Water Quality Monitoring Network Design Alfred L. Korndoerfer, Jr. Karl Muessig.
Indian Valley Meadow Restoration acre meadow located atop the Sierra Crest in Alpine County, CA. Headwaters of the Mokelumne River. Source for agricultural,
Suwannee River Basin and Estuary-- Integrated Science Workshop  SR originates in the Okeefenokee Swamp, changing dramatically as it moves downstream,
Texas Clean Rivers Program Nueces River Authority Texas Commission on Environmental Quality Citizens.
Environmental Flows Under Texas Senate Bill 3: Did We Leave Enough Water for the Fishes? Kirk Winemiller, Dept. of Wildlife and Fisheries Sciences, Texas.
Waterway Transportation and the Environmental Management Program in the Upper Mississippi River System 尹耀 (Yin Yao) Director of International Strategies,
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
The Atchafalaya Basin Jonah D. Price April 6, 2005.
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
Lake Apopka Restoration Proposed projects for Legislative Appropriation.
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
History and Progress of DEQ’s Mercury Programs Albert E. Hindrichs.
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Great Lakes Perspective Samuel W. Speck Chair, Water Management Working Group Council of Great Lakes Governors Chair, Great Lakes Commission Director,
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Salinity Control on the Pecos River Robert E. Mace, Ph.D., P.G. presented at the Multi-State Salinity Coalition’s Salinity Summit January 26, 2012; Las.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Advisory Committee on Water Information Streamgaging Task Force Charge: Determine the streamflow information needs of the Nation, identify the optimal.
Advisory Committee on Water Information Streamgaging Task Force Charge: Determine the streamflow information needs of the Nation, identify the optimal.
Marine Zoning and Regulatory Review Water Quality Protection Program Steering Committee Update Sean Morton Florida Keys National Marine Sanctuary July.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Welcome Opportunity to Learn – Public, Groups, Agencies and FS Patience Respect Ask.
“The minimum flow for a given watercourse shall be the limit at which further withdrawals would be significantly harmful to the water resources or ecology.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Streamgaging Task Force Summary Report Advisory Committee on Water Information Herndon, Virginia September 10, 2003.
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
WATER RESOURCES ORSANCO Technical Committee October 9-10, 2012.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Caernarvon Freshwater Diversion Advisory Committee 2015 Meeting Tuesday, November 17, 2015 Caernarvon Freshwater Diversion Advisory Committee.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
PROJECT PLAN: The Nature Conservancy Corps of Engineers ICPRB Presentation Potomac Watershed Roundtable January 9, 2009.
Minnesota Hydrography Land of 10,000 Lakes (or so) Mark Olsen Minnesota Pollution Control Agency 520 Lafayette Road N. St. Paul, MN 55155
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Water Quality Certification for hydropower licensing in Wisconsin.
NATIONAL WEATHER SERVICE JACKSON, MS NEW ORLEANS/BATON ROUGE, LA Pearl River Basin Watershed Town Hall March 17, 2015
Pearl River Basin Watershed Conference USGS Gaging Operations in the Pearl River Basin Lower Mississippi Gulf Water Science Center March 17, 2015.
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
GALVESTON BAY ESTUARY PROGRAM A CATALYST FOR PARTNERSHIPS AND COLLABORATION Sarah Bernhardt, Ph.D. Lower Rio Grande Valley 18 th Annual Water Quality Management.
IMPLEMENTATION UPDATE Rice County Local Water Management Plan BOARD PRESENTATION JUNE 16, 2015.
Savannah River Projects
Texas Surface Water Resources
Watershed-based Plan To Restore the Hackensack Meadowlands:
Little Rapids Habitat Restoration St
Mulberry Watershed Management Plan
Water Quality Credit Trading
Washington County Parks and Open Spaces
Shasta Valley Groundwater Basin
Watershed-based Plan To Restore the Hackensack Meadowlands:
The City of Los Angeles and The Los Angeles River
Presentation transcript:

Creation of the Lower Pearl River Basin Ecosystem Study Commission ( LPRBESC) March 2016 Flood Conference June 21, 2016 E. deEtte Smythe, Ph.D. St Tammany Parish Government

Pearl River Basin  Pearl River Basin Covers an area of about 7,800 square miles  490 miles long & divides into the Pearl River & the West Pearl River about 50 miles above the mouth  The last gauge in the network, USGS Gauge “Pearl Pearl River,” is monitored by NWS- LMRFC & St Tammany Parish for flooding potential

Lower Pearl River Basin  The Lower Pearl River Basin, is just a tiny part of the full Basin  The majority Lower PR Basin water supply is above St. Tammany Parish  There are approximately 12,700 structures in the PRB below I-59 (approx in LA and 3700 in MS), for which no forecast model is available.

Protecting A National Treasure  The Pearl River Basin contains one of the least-altered & pristine swamps in the nation  Covers an area of over 70,000 acres shared between MS & LA  One of the most species-rich river systems in the world o Supports nearly 140 types of fish (including Gulf sturgeon) o 40 species of freshwater mussels What can be done to address critical issues in the Lower Pearl Basin ?

Lower Pearl River Basin Ecosystem Study Commission (LPRBESC) November 18, 2014 inaugural meeting Senate Resolution Nos. 159 & 152 (Crowe) Senate Resolution No. 123 (Hewitt)

Commission Members (or Designees)  2 Senators  2 Representatives  Secretary of DNR  Secretary of Wildlife & Fisheries  Secretary of LDEQ  President of Washington Parish  President of St Tammany Parish  4 Residents of St Tammany Parish o (appointed by Legislators representing that Parish)  3 Residents of Washington Parish o (appointed by Legislators representing that Parish)

Challenges & Concerns Discussed by LPRESC  Flooding  Hydrology & Water Management  Environment, Habitat & Water Quality  Recreation & Access

Flooding Concerns: Historical River Crests 21.05’ 4/1983 Flooding to approx residents 19.22’ 4/1995 Flooding to approx residents 19.2’ 4/2009 & 9/ ’ 3/2016 Significantly less flooding than 1983 event What has changed in the Lower Pearl Basin?

Flooding Concerns: Predictive Ability Lower Pearl River Watershed has changed March 2016 Flooding Prediction (bottom)

Subdivisions in W. Pearl River Basin Vulnerable to Flooding  Many roads & homes in St. Tammany Parish may also be inundated in events similar to 1983 river crest

Hydrology & Water Management  Control Structures o Stronger MOU with Ross Barnett Reservoir & State of MS for minimum discharge o Assessment of current functions of water management structures:  Walkiah Bluff & Pearl River Navigation Canal  Minimum Flows o Establish minimum flow in Pearl River (before splits) at USGS Bogalusa  Log Jams, Shoaling & Siltation o Log jams have changed flow patterns & induced shoaling o Siltation in Lower Pearl Basin has increased due to dredging cessation (1989)  Pearl River Sill Removals o Proposed by LA Department of Wildlife & Fisheries to enhance Gulf Sturgeon habitat

Altered Hydrology: Log Jams Change Flow Patterns Log Jam at “Shoals” Water designed to divert to E. Pearl at Walkiah Bluff is now blocked by log jams Now diverts through Holmes Bayou & into Middle Pearl Reduces water available to the E. Pearl (critical to State of MS)

Environment, Habitat & Water Quality  Endangered Species o 90+ species of wildlife & fish o 40+ Plants  Turkey Habitat & Feral Hogs o LDWF restricts hunting in the PR WL Management Area (WLMA), because there are so few turkeys in the WLMA o Turkey population is a function of feral hogs & nesting season coinciding with spring floods  TMDLs & WQ o 82 impaired segments on draft (d) list; 19 TMDLs in LA & 49 TMDLs in MS o Mercury in fish tissue, Turbidity & Sulfates dominate LA impairments o Good WQ is critical to species diversity & recreation

Propose: Lower Pearl River Basin Master Plan In order to quantify financial needs, the Lower Pearl River Basin Ecosystem Study Commission (LPRESC) must develop: –Mission Statement –Master Plan The LPRESC hopes funding will be available for development of a Lower Pearl River Basin Master Plan –Priorities –Fundable Components

Suggest: Pattern LPRB Master Plan After Atchafalaya Basin Program (ABP) Key plan features of ABP  Public Access  Environmental Easements  Water Management  Recreation A Pearl River Basin Plan may require additional features, including possibly extending the Basin boundary to include MS

LPRBESC draft Recommendations  Develop a Mission Statement  Assign lead agency and determine timeline for development of a Master Plan  Compile a list of essential stakeholders (federal, state, and local government agencies, NGOs and private citizens & businesses)  Lead agency will work with stakeholders to become the Master Plan Development Group o Define geographic area of interest of the Lower Pearl River Basin o Identify areas of concern which require study

LPRBESC draft Recommendations (con’t)  Hold a series of internal & public meetings to identify issues and the desired optimum future conditions for the Basin for each area of concern  Stakeholders will be assigned to committees to develop action plans to achieve the optimum future conditions related to their area of expertise & estimate funding requirements  The action plans would be compiled into a draft Master Plan for the Lower Pearl River Basin and presented for public comment  Final MP will be presented to LA & MS Legislatures and funding requested

Questions?