D.Manglunki / AB-OP / 19.09.2005 AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP 19.09.2005 CERN Control Centre.

Slides:



Advertisements
Similar presentations
AB / CO Review1 PS Complex Software for 2006 PS Complex Operation Teams & S. Pasinelli.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Intervention Priority Management This talk will show the CERN priority list, the corresponding check list and the tools used by operators to diagnose a.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Selected Subjects on Controls System - Quality Assurance P.Charrue On behalf of the AB Controls Group LHC Machine Advisory Committee 16 June 2006.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
Lukasz ZwalinskiLHCb CO 2 cooling; 1 IBL CO 2 cooling control system Bart Verlaat, Lukasz Zwalinski, Maciej Ostrega, Michal Zimny,
ToPOTools for PS Operation Rade Workshop EN/ICE-MTA Genoud Hervé Matli Emanuele BE/OP-PS CERN April –
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
14 December 2006 CO3 Data Management section Controls group Accelerator & Beams department Limits of Responsibilities in our Domains of Activities Ronny.
CCC status report 14/12/2004D.Manglunki AB/OP 1 Status of the CERN Control Centre D. Manglunki AB/OP.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
East Area Secondary Beam Control User Guide Revised version after LS1 L.Gatignon / EN-MEF 5 January 2015.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
How to achieve satisfactory performance of the access system: stability, efficiency, operation, fluidity Timo Hakulinen (GS/ASE) Thanks: LHC access team.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
BCT for protection LHC Machine Protection Review April 2005 David Belohrad, AB-BDI-PI
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
ITC-TECH SYSTEMS Product Overview Presentation in Outlook and Lotus Notes interface.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
© 2008 Cisco Systems, Inc. All rights reserved. CIPT1 v6.0—5-1 Module Summary  Cisco Unified Communications Manager supports software media resources,
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
R. Bailey, PS/SPS days, January 2005 Towards the CCC.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Isabelle Laugier, AT/VAC/ICM Section May 6 th 2008 LHC Vacuum Control system.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
13th May 2004Uwe Epting - TS/CSE-CO1 TS-CSE Outline –TCR and TS-CSE-CO mandate –Applications –Console layout –Hardware and Operating System –Strategy –Conclusion.
LHC Section Meeting 1.eLogbook 2.LHC Controls Security Panel.
CO Timing Review: The OP Requirements R. Steerenberg on behalf of AB/OP Prepared with the help of: M. Albert, R. Alemany-Fernandez, T. Eriksson, G. Metral,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
ISOLDE RILIS User Laser Shutter and RILIS Data Feedback.
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
Support for Technical Infrastructure operations P. Sollander, AB/OP/TI.
D.Manglunki - AB/OP CCC Ergonomics D.Manglunki - AB/OP.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Overview Presentation MKT-DSRV-P- 001E. Product Overview Network based video transmission product with on-board digital recording Allows analogue fixed/PTZ.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Visualization & Collaboration
Radiation monitoring and follow up during LHC commissioning
P. Charrue on behalf of AB/CO/IN
Hollow e- lens, Cryogenic aspects
The Control System For LHC Hardware Commissioning
Use Cases - Cryo Services Speaker: Klaus Barth on behalf of TE/CRG
Project: Accelerators IT Infrastructure Support and Installation
Presentation transcript:

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre AB/CO review D.Manglunki / AB-OP CERN Control Centre

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre SUMMARY Introduction: Presentation of the project –CCC-WG –Staff –Consoles and room layout A few issues concerning CO –Fast analogue signals –Video signals –Communications Conclusion: Wishful thinking

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre CCC-WG Composition: –R.Bailey AB/OP –J.L.Baldy TS/CE –B.Frammery AB/CO –D.Manglunki AB/OP –R.Saban TS/HDO –L.Serio AT/ACR –P.Sollander AB/OP Chamonix 2004: Operate “Anything from anywhere”

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre STAFF in the CCC Regime: 12 people on shift –7 Accelerators: 1 PSB, 2 PS, 2 SPS, 2 LHC (1 Tech + 1 EiC) –2 TI –3 Cryo –… plus numerous specialists! 2006 startup: 6 people on shift –5 Accelerators: 1 PSB, 2 PS, 2 SPS –1 TI –… plus numerous specialists! Estimated average population ~30 –Room dimensions > 600 m 2 –Special care for acoustics

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre CONSOLES 3 screens/workstation For each 2 workspaces: –1 admin PC –3 fixed displays

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre Special case of ACCESS CONSOLES 19” rack for keys and specific HW Allows operators veto (“inhibit”) 4 screens Includes intercom

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre LAYOUT 39 consoles distributed over 4 islands –TI, PS complex, SPS, LHC –Cryogenics split between TI & LHC 3 Access control cabinets –PS complex, SPS (2 racks in 2006), LHC 4 x 4 giant fixed displays on walls

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre FAST ANALOGUE SIGNALS Needs –Quick patching/repatching –Quasi-realtime processing (FFT…) –Special display modes (i.e. mountain range) Project by J.Kuczerowski & R.Steerenberg Based on Acqiris modules Integration into OASIS for display Use of LabView for quick modification –Cross fertilisation of 2 nd job –Support team exists within AB/CO

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre VIDEO SIGNALS Vistars State of machine parts Special processes (i.e. batch compression) Losses patterns Beam screens Need for splitting screens

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre COMMUNICATIONS Phone based global communication system –IP Touchphones + alarms server Pressure from users to keep legacy intercoms –IT/CS interfaces PS complex intercoms & public address –SPS intercom historically in AB/CO

D.Manglunki / AB-OP / AB/CO review: the CERN Control Centre WISHFUL THINKING 2006 startup –with 6 different control systems: PS complex, SPS, LEIR/LHC, TI, Cryo, SC/RP –managed by 3 different groups: AB/CO, TS/CSE, SC/RP Now that we have one control room… will we have a single control system in a finite time?