Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department | www.miamidade.gov/water  1   Reuse, Every Drop Has Value Seminar FPL JPA.

Slides:



Advertisements
Similar presentations
Zone 7 Water Agency Zone 7’s Salt Management Plan Past, Present & Future May 9, 2012 Kurt Arends, P.E. AGM Engineering and Operations Zone 7 Water Agency.
Advertisements

Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
Miami-Dade Water and Sewer Department
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Consolidation Committee Briefing Orange County Utilities Department August 23, 2005.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Calaveras County Water District Capital R&R Program Funding Options March 25,
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager July 17, 2012 DC WATER Hosted by: DBIA-MAR Monthly Luncheon Water Wastewater.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Water is Life: Upgrading Our Infrastructure to Serve You Better.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
City of Dayton Water Supply and Treatment Division.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Broward County-wide Master Reuse Plan
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT WATER RESOURCES & UTILITIES DIVISION Mike Ulrich, Director Mike Ulrich, Director.
Safe Drinking Water Permit and Capacity Requirements Developer Services Summit November 16, 2010 Engineering - Asset Planning Vince Monaco.
B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption Hearing May 19, B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Adoption.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
South County Reclaimed Water Partnership South County Reclaimed Water Partnership Palm Beach County Water Utilities Department Brian Shields,
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Review of wastewater discharge alternatives – past and present Slide presentation prepared by Stan Mills for Regular Commissioners’ Meeting of December.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Mark Elsner Administrator, Water Supply Development Section Mark Elsner Administrator, Water Supply Development Section WateReuse Florida - Fit For A Purpose.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Began funding reclaimed projects in projects funded 325 projects completed $435M leveraged $1 Billion 970 miles of pipelines 248 MGD reuse capacity.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
1 GE-Sw011 Southern Regional Wastewater Treatment Plant Ocean Outfall Rule Change Pilot Testing Plan of Study Development Monday, February 13, 2012.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
JEA’s Initiatives and Capital Improvements Program
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Electrical Distribution Design Services
Chromium 6 Regulation Corrective Action Plan October 6, 2015
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Outline of Presentation
Florida and Reclaimed Water
Southern Delivery System
City of Valdosta Utilities Department.
Florida Power & Light Reclaimed Water Opportunities
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA for Development of Reclaimed Water Project May 26, 2016

Miami-Dade Water and Sewer Department (WASD) Largest Water & Sewer Utility in the Southeastern United States Serving more than 2.3 residents FY Budget: – Projected Revenues $732 Million – $13.5 Billion Multi-Year Capital Plan (FY16-21) – 2626 Total Budgeted Positions 2

Water System 3 large regional and 5 small water treatment plants (WTP), plus new Hialeah Reverse Osmosis WTP Supplying an average of 315 million gallons per day (MGD) 90% of the County’s public water supply Per capita water use 136 gpcd 15 wholesale customers 432,000 retail customers 100 water supply wells 8,206 miles of pipes 38,381 fire hydrants 126,306 valves 3

Wastewater System 3 wastewater treatment plants 2 ocean outfalls and 21 deep injection wells Collecting, treating, and disposing 306 MGD 350,000 retail customers 13 wholesale customers 6,309 miles of mains and laterals 1,047 sewer pumps stations Reusing 12.7 MGD 4

Water & Wastewater Treatment Facilities 5

Reuse Feasibility Studies 1992 & 1998 April 2007 –Biscayne Bay Coastal Wetlands Rehydration –Groundwater replenishment –Irrigation projects 6

Biscayne Bay Coastal Wetlands Pilot Pilot required by Water Use Permit Pilot planning started in 2007 Run pilot units from Nov 2010 to April 2011 Submitted final report to SFWMD, FDEP and BNP on October 2011 (not economically feasible) 7

Groundwater Replenishment Project Recharge of the Biscayne Aquifer at the proposed South Miami Heights WTP Completed 90% design of reclaimed water plant Estimated cost $367 million + WTP Directed by the Board of County Commissioners to look at the feasibility of more cost effective alternatives Reuse project cancelled Using the Floridan aquifer as the alternative source 8

Ocean Outfall Compliance Plan Submitted to FDEP June 2013 Reuse Projects to meet the 60% reuse by 2025 (117.5 MGD): –Recharge of the Floridan aquifer 27.5 MGD (9.5 MGD at each WWTP (CD, SD, & WD)) –90 MGD of High Level Disinfection reclaimed water to FPL 9 

FPL Reclaimed Water Project Miami-Dade County entered into Join Participation Agreement (JPA) with FPL in July 2010 Up to 90 MGD of High Level Disinfection (HLD) quality water to be delivered to Turkey Point for proposed nuclear power units 6 & 7 –FPL will provide additional treatment (nutrient removal) to meet the water quality requirements of cooling towers 10

FPL JPA FPL manages engineering, permitting, mitigation plan, procurement, and construction of pipeline (about 9 miles) County reimburses FPL for pipeline construction materials and labor, at time of conveyance –2010 cost estimate $78 million (max. of 4% annual escalation) Includes sample Water Service Agreement with formula for calculating cost of water Original in service date was 2019 (later delayed) 11

SDWWTP High Level Disinfection Complete in million MGD peak flow capacity (112.5 MGD Average rating) Capital Cost about $600 million Required by UIC rules and FDEP Consent Order 12