Potable Reuse in Texas Where Are We Now? Joel Klumpp Texas Commission on Environmental Quality Potable Reuse in Texas Where Are We Now?

Slides:



Advertisements
Similar presentations
City of Edmonton Water Quality Monitoring Locations.
Advertisements

DISINFECTION: APPROPRIATE TECHNOLOGIES FOR WASTEWATER TREATMENT KA SAMSON Presented at the APPROPRIATE TECHNOLOGY CONFERENCE BMW CENTRE, CAPE TOWN, 3-4.
Scott Reinert , P.E. Water Resources Manager El Paso Water Utilities
Treatment of Waste Brine from a Brackish Reverse Osmosis Plant
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
Paving a Path to Potable Reuse Flexible Treatment for To Be Determined Regulations Michael Watts, PhD, PE Water Technology Leader Garver.
Drinking Water Through Recycling The benefits and costs of supplying direct to the distribution system Dr Stuart Khan School of Civil & Environmental Engineering,
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Direct Potable Reuse (DPR) – Has It's Time Come? 1 DPR.
UV Disinfection for Unfiltered Surface Water Regulatory Compliance Kevin Castro, PE | GHD Image placeholder.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Innovative Green Building - High Rise Residential - Water Reuse American Water Applied Water Management Group.
Richard Walker Climate Change Case Study Water Quality Implications Water Safety Conference 2010.
Tim Stefanich - Environmental Engineer Sioux Falls Water Purification Cryptosporidium Monitoring for Compliance with the LT2 Rule.
Surface Water Treatment Rule Bob Clement Drinking Water Program U.S. EPA Region 8.
Water Treatment System Design for Cinnamon Creek Campground Nomads Engineering: Achit-Erdene Gankhuyag Cuyler Frisby Kevin Wagner.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
Requirements to produce high quality water Stephen Stanley, Ph.D., P.Eng. EPCOR Water Services.
Long Term 2 (LT2) Enhanced Surface Water Treatment Rule
1 Long Term 2 Enhanced Surface Water Treatment Rule – LT2 Mark McIntire Drinking Water Program SDWWA Water Seminar February 7, 2006 Please ask questions.
Revised July 2015 Safe Drinking Water Program.
USEPA Regulations By Douglas Rittmann, Ph.D., P.E. Water/Wastewater Consultant Presented to Entrepreneurs Association of Bari.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Mmwd1013i1.pptx/1 Regulating DPR in New Mexico Andy Salveson, P.E....on behalf of Joe Savage and NMED.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Mississippi State Department of Health
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
Effective Project Planning, Community Capacity Building, & Partnership Development in Indian Country LT Bradley Sherer Environmental Engineer Indian Health.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 MCLsMonitoring RulesReporting.
City of Wichita Falls Emergency Direct Potable Reuse RESPONDING TO THE 2011 – 2014 DROUGHT.
State of Alaska Implementation of MBDP Rules Carrie Bohan Environmental Program Specialist ADEC DW Program.
MRWS GROUND WATER RULE (GWR) PREPARED BY JOHN CAMDEN MRWS GROUND WATER TECH
Aurora’s Prairie Waters Project – A Sustainable and Innovative Water Supply Solution Colorado State University September 17, 2007 Mark Pifher/Aurora Water.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Texas Innovative Water 2010 Kevin Morrison, P.G. Project Coordinator / Water Resources What has SAWS Learned about Concentrate Disposal Options for Inland.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
The New Maximum Benefit Paradigm. Common Issues with Other Basins and Other RWQCBs TDS, N and other water quality constituent objectives are common impediments.
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
Geospatial Analysis of the Big Spring, TX Area. Types of Wastewater Reuse Non-Potable Reuse Watering lawns Industrial cooling Indirect Potable Reuse Aquifer.
 Oklahoma Department of Environmental Quality Water Quality Division.
Nitrification Action Plans
Natural Disaster Management Group Drinking Water Advisory Group July 21, 2015 Alexander Hinz Wendi Wilkes Water Supply Division Texas Commission on Environmental.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Mmwd1013i1.pptx/1 Hormones, Pharmaceuticals, and Personal Care Products (CECs) in Water October 20, 2015 Andrew Salveson
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Evaluation of Microbiological Risks Associated with Direct Potable Reuse (DPR) Water Microbiology Conference 2016 University of North Carolina May 2016.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Eva Steinle-Darling, Ph.D., P.E.
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Requirements to produce high quality water
The Legal and Practical Requirements
Southern Delivery System
ADVANCED WATER PURIFICATION SYSTEM
October 29, 2018 Terry Lauritsen, P.E.
Indiana Department of Environmental Management Office of Water Quality
National Optimization Goals
Scott Reinert, P.E. Water Resources Manager
CENTRAL FLORIDA POTABLE REUSE TEST PROJECTS .
Presentation transcript:

Potable Reuse in Texas Where Are We Now? Joel Klumpp Texas Commission on Environmental Quality Potable Reuse in Texas Where Are We Now?

Drought Monitor Map of Texas on October 4, 2011

Low-Lake Water Source Picture

Water Data for Texas Map on February 16, 2016 Waterdatafortexas.org February 16, 2016

Direct Potable Reuse in Texas One plant in operation One plant operated for a year One plant with construction approval One PWS just finished a pilot test One PWS preparing to pilot test Many other PWSs have expressed interest…

TCEQ Approach Case-by-case basis In response to drought Require a pilot study (or verification test) Start counting credits after WWTP Sum of removal and inactivation credits must meet or exceed minimum treatment required

TCEQ Approach Continued Minimum pathogen treatment set by: Define risk: annual risk of infection of for potable water - based on SWTR Define maximum source water concentration based on acceptable risk Giardia: SWTR, 1989 Rotavirus: Regli et al, 1991 Cryptosporidium: LT2 Bin 3, 2006 Characterize source water: monitoring should be at least monthly for at least one year Set minimum treatment requirements to ensure protection of public health

Current Status of DPR Projects in Texas CRMWD at Big Spring Start date: April 2013 Status: operational Wichita Falls Emergency Temporary DPR Project Start date: July 2014 Status: closed City of Brownwood Start date: construction approval + full-scale verification granted December 2012; no decision to begin project at this time El Paso Water Utilities DPR Start date: recently completed pilot testing their proposed treatment process

Colorado River Municipal Water District

Monitoring Locations, Frequency, and Shut-down Conditions CRMWD Raw Water Production Facility Example diagram showing Monitoring Locations, Frequency, and Shut-down Conditions used at the CRMWD Raw Water Production Facility Reclamation Facility Effluent Nitrate - daily > 10 mg/L Nitrite – work daily > 1.0 mg/L E. coli – weekly > 0 CFU/L % of reclaimed water in Pipeline - 4 hrs > 50% DBPs - monthly MCL/SCL chemicals - quarterly > MCLs Giardia - monthly Cryptosporidium – monthly Total effluent produced - daily Ultraviolet Light MF Membranes MF Effluent Total water produced each unit – daily Monochlor. – weekly Total Cl 2 – weekly Free Ammonia - weekly RO Effluent TDS – continuously > 20% or 40 µS/cm over last reading Ultraviolet Light D val - 5 min < 100 mJ/cm 2 Flow - 5 min. ³ 7.39 MGD UVT - 4 hours < 40.3% Lamps off - 5 min. > 2 Big Spring WWTP Effluent Turbidity – continuous ³ 10 NTU Giardia – monthly Cryptosporidium – monthly Flow - 30 min Total WWTP effluent - daily E. Coli - weekly CRMWD Facility Reverse Osmosis Big Spring WWTP MF Units DIT – daily - fail IFE turbidity - 5 min > 0.15 NTU DIT after CIP - fail Flow through each unit - daily

The Future of Reuse in Texas Texas Water Development Board Reuse Resource Document can be used for those considering DPR Lessons learned so far: PWSs should evaluate all sources of water before moving forward with a reuse project The multiple barriers required for reuse projects are expensive, require experienced operators, and commitment to monitoring those parameters necessary to demonstrate adequate treatment is achieved

The Future of Reuse in Texas Lessons learned continued: DPR Projects include innovative treatment technologies which require either a pilot study or a full-scale verification test Due to the innovative nature of these projects, public water systems considering DPR should factor in adequate review time and coordination with the TCEQ

Questions? Joel Klumpp TCEQ