PP December 7, 2004 The RunII Calorimeter Pierre Pétroff and Norm Buchanan (For the Calorimeter Group) (taken largely from N. Parua’s tutorial) Cal-Muo.

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
CAL DQM SHIFT TODO and RELATED MATERIAL T. Schörner-Sadenius Hamburg University CAL Meeting, 13 October 2004.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
12 February 2002 Cal Mtg - D0 Collaboration Alan L. Stone Louisiana Tech University ICD LED Run Status Purpose ADC to GeV Conversion Basics of ICD LED.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
CALOR2000 Conference Annecy,France Oct Leslie Groer Columbia UniversityDØ Calorimeter Electronics Upgrade Columbia University New York DØ Calorimeter.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
Calorimeter Status Nirmalya Parua, Brook.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
EXAMINATION OF CORRUPTED DATA IN THE TILE CALORIMETER Stephanie Hamilton Michigan State University The ATLAS Collaboration Supervisor: Irene Vichou (U.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Installation and Commissioning of the ATLAS LAr Readout Electronics
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
DØ Algorithms Meeting March 9, Leslie Groer Columbia UniversityCalorimeter Online Software Status 1  Examines  Crate Unpacking  Calibration 
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
Nirmalya Parua March 17, 2003 The RunII Calorimeter Nirmalya Parua (For the Calorimeter Group) Shifter’s Tutorial March 17, 2003  Overview Of the D0 Calorimeter.
1 L1CAL for DAQ Shifter By Selcuk Cihangir 3/20/2007 Representing L1CAL group (slides from many people)
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
first results from EMCal test beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
Nirmalya Parua March 25-29, 2002 The RunII D0 Calorimeter Electronics Upgrade & Its Performance Nirmalya Parua State University of New York Stony Brook.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
2000 IEEE NSS Lyon,France Oct Hervé Lebbolo LPNHE ParisDØ Calorimeter Electronics Upgrade DØ Calorimeter Electronics Upgrade for Tevatron Run II.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Calibration Workshop 8 Sept Calorimeter Calibration: Calibration procedure and Database Definition Ursula Bassler, Mrinmoy Bhattacharjee, Leslie.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
CALICE, CERN June 29, 2004J. Zálešák, APDs for tileHCAL1 APDs for tileHCAL MiniCal studies with APDs in e-test beam J. Zálešák, Prague with different preamplifiers.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
Calorimeter Task Force Workshop February 10, 2003 Leslie Groer, Columbia UniversityCalorimeter Software Status 1 Past Calorimeter Software Improvements.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
on behalf of ATLAS LAr Endcap Group
CALGO: Software Tasks cal software:
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Shift instructions August 16, 2017 Antoni Aduszkiewicz
BESIII EMC electronics
J. Rutherfoord & P. Schacht 17 May 2004
Calorimeter Upgrade The Tevatron and Dzero Upgrades
Presentation transcript:

PP December 7, 2004 The RunII Calorimeter Pierre Pétroff and Norm Buchanan (For the Calorimeter Group) (taken largely from N. Parua’s tutorial) Cal-Muo Shifter’s Tutorial December 7, 2004  Overview of the D0 Calorimeter and the FE electronics  Shifter’s tasks before begin of run during the run at the end of the run when NO BEAM in the machine

PP December 7, 2004 Overview of Detector

PP December 7, 2004 Calorimeter Overview y z x

PP December 7, 2004 Overview of the Calorimeter Liquid argon sampling Stable (no amplification !), uniform response, rad. hard, fine spatial seg. LAr purity important < 1-2 ppm Uranium absorber (Cu or Steel for coarse hadronic) Compensating e/   1, dense  compact but bad sampling frequency ! Uniform, hermetic with full coverage  < 4.2 (   2 o ),  int  total) Energy Resolution e:  E / E = 15% /  E  + 0.3%  :  E / E = 45% /  E + 4% test beam results Run II worse ! and not understood still:  E / E = 25% /  E*sin  )  + 3% EM No more compensation due to a shorter integration time (~450 ns) For more details # The D0 Detector ("The NIM paper") Nucl. Instr. and Methods, A338, 185 (1994) FERMILAB-PUB-93/179-E PS

PP December 7, 2004 Overview of the Calorimeter

PP December 7, 2004 Intercryostat Detector (ICD)  Design  Scintillator based with phototube readout.  16 supertile modules per cryostat with a total of 384 scintillator tiles  WLS fiber readout of scintillator tiles  Clear fiber light piping to region of low field ~40-50% signal loss over 5-6m fiber.  Readout/calibration scheme for electronics similar as for L. Ar. Calorimeter. ICD FPS

PP December 7, ” FET driverpreamp Readout Bank 1 Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep) Bank 0 Calorimeter Calibration 55k readout channels SCA(48 deep ) A n. B u f ADCADC 48 1 peak base Cable replaced for impedance matching

PP December 7, 2004 Preamplifier FET 2” driverpreamp New calorimeter preamp Hybrid on ceramic 48 preamps on a motherboard New low-noise switching power supplies in steel box Dual FET Frontend Compensation for Det. Cap. Faster Recovery Time New output Driver for terminated signal 1152 boards hybrids

PP December 7, 2004 Base Line Subtracter (BLS) ADC’s have 12 bit dynamic range. To achieve 15 bit dynamic range SCAs have low and high gain path for each readout channels (X8/X1) SCAs are not designed for simultaneous read/write operations. Two banks of SCAs, upper and lower (can’t see in the picture), for alternate read/write operation. Readout time ~6 µs (length of SCA buffers 132 X 46 >6 µs). Trigger tower formation 0.2 X 0.2 for Level 1. Trigger summers/Drivers 1152 BLS boards 4608 SCA cards SCAs Trig Summers

PP December 7, 2004 Cal-muo Shifter’s Tutorial, 2004 More on SCA’s           ….…. …          ….…. …                  x8 x1  L1 SCA up L2 SCA ADC down Mean value ADC counts L1 SCA up L1 SCA down L2 SCA

PP December 7, 2004 T&C cards Timing and control CardTrigger system BLSADC Pulser Calorimeter Preamplifier  Receives trigger, accelerator, clock information  Samples BLS shapers at the signal peak and base.  Keeps track of the memory location of crossings.  Generates busy signal when system is not ready.  Coordinates pulser calibration. 12 T&C boards and 1 controller board is used

PP December 7, 2004 General

PP December 7, 2004 Shifter’s task General: Locate the monitors and orient yourself. Open/login to the electronic logbook Recognize/start all calorimeter monitoring GUIs Careful survey of the alarms – all should be green (or yellow..not red !!) Careful survey of the examine programs (dq_calo and l1cal_examine) Report in log book run summary and plots from examine programs. Make sure archiver is running Run pedestal calibration when no beam in the machine (~each 2 to 3 days) Run pulser runs for NLC and gains of ADC’s measurement (with an expert)

PP December 7, 2004 start_cal in d0ol45 What component do you want to start ? alarm => starts calorimeter alarm display hv => starts high voltage GUI ioc => starts IOC (I/O controllers) GUI rmi => starts RMI (Rack Monitor Interface) GUI supply => starts PS supply & setup GUI taker => open a taker (to prepare for run, peds calib, pulser calib) D0run => open a session with d0run account l1examine_d0ol23 => open a session on d0ol23 for l1calexamine l1examine => starts l1 cal_examine rampwatcher => starts rampwatcher GUI ped_viewer => starts Pedestal History Display dq_calo => starts DQcalo with L1 Trigger Monitoring dq_monitor => starts DQcalo Monitoring with L1 Trigger Monitoring calib => starts the calib_manager and ped_quality GUI HCkiller => starts Hot Cell Killer GUI shifter => starts all shifter GUIs all => starts alarm, global PS and ReadOut, supply, timing and control, pulser GUIs

PP December 7, 2004 Shifter’s task >start_cal alarm

PP December 7, 2004 Shifter’s task >start_cal ioc >start_cal rmi platform counting rooms

PP December 7, 2004 Shifter’s task >start_cal supply

PP December 7, 2004 Shifter’s task

PP December 7, 2004 Shifter’s task

PP December 7, 2004 Shifter’s task

PP December 7, 2004 Shifter’s task

PP December 7, 2004 Shifter’s task Everything should be 0 during data taking.

PP December 7, 2004 Shifter’s task occ ADC 1.5 sigma cut ~7% to 12% off ! Ped file version Peds subtracted + 0 suppressed cut at 1.5  baseline subtracted -3 ticks (3x132ns) ADC error Status should be 0x10

PP December 7, 2004 Shifter’s task >start_cal hv Unlock-off (right status)-set- ramp-when holding- lock

PP December 7, 2004 Shifter’s task At the beginning of the Store  Download cal_prepare_for_run trigger and tell the captain and the DAQ shifter that the calorimeter can be included in the global run Modify->Change Trigger->Commissioning ->Cal->cal_prepare_for_run-xx (last one) DO NOT FREE THE TRIGGER !!!  verify that the pulsers are off  verify that there are no major alarms All at zero !

PP December 7, 2004 Shifter’s task At the beginning of a new Run  dq_calo starts automatically  start L1Cal_examine  look at examine program  Kill hotcells if necessary (on shift captain request ONLY !)  Monitor alarm display and take actions accordingly  Put all observations in the logbook (elog) IF SOMETHING LOOKS WEIRD CALL EXPERT !!! During the Run

PP December 7, 2004 Monitoring programmes dq_calo is a very sophisticated monitoring prog. proof of efficiency  problems fixed before our sleuths of the data quality detect it ! useful for offline analysis too  tag coherent noise Saturday May 8th 0 bias trigger Jet trigger occ Mean energy + Unsupressed trigger + All triggers

PP December 7, 2004 harness problem in crate 9 bad contacts in low voltage connectors at the level of BLS backplanes FIXED

PP December 7, 2004 DQ Calo

PP December 7, 2004

PP December 7, 2004 Running L1CalExamine start_cal l1examine_d0ol23 start_cal l1examine init start To stop the examine do stop quit

PP December 7, 2004 Killing HotCells If the hotcells are isolated in eta/phi and has E_T/events <5 GeV do not kill these cells. Note this information in the logbook If more than one adjacent cells have E_t/events > 2 GeV you may kill the cells..but CALL THE EXPERT !!! before  Cells are not killed untill downloaded using cal_prepare_for_run.  This requires the DAQ shifter to stop the run and free the trigger.  Talk to the captain about the hotcells and ask him when you should download new pedestals to kill those.  In any case call the on-call expert unless you are experienced

PP December 7, 2004 Hot cell Killer If counting rate increases at L3 due to the calorimeter shift captain can request you kill a hot cell/hot tower: 1- start_cal D0run 2- start_cal HCkiller 3- choice by geographical coordinates or electronic coordinates be sure you will kill the right cell/tower ! 4- when ready..run should be stopped and trigger free 5-kill and save 6- cal_prepare_for_run then restart the run

PP December 7, 2004 Shifter’s task – after the run stops Save the histograms and complete the run checklist in the logbook After the store ends put the muon HV to standby (discussed by Markus), DO NOT CHANGE THE CALORIMETER HV

PP December 7, 2004 Shifter’s task, between stores  If there is no beam (not even beam studies, or shot setup) and the last calibration run was taken more than 48 hours before Take a new calibration run  Ask the captain about the quiet time and duration  Also if there were an access and calorimeter experts worked on the hardware you must take a calibration run (In that case the cal_expert should ask you for the calibration run)  Download the pedestal and check for bad cells  Keep the system running and monitor errors  If there is a zero-bias run going on run all examines.

PP December 7, 2004 Taking pedestal Calib Run Open a new xterm  Start_cal D0run  Ask for SMT crates Open the calib manager GUI  setup d0online  start_cal calib  read the manual ! Click here Set to pedestal

PP December 7, 2004 Ped quality

PP December 7, 2004 Pedestal Log Entry Starting calorimeter pedestal calibration run. SMT is off. Run x8, run x1. These two runs went OK E-ped E-ped8 Calibration looks good to me so I Linked the Pedestals.

PP December 7, 2004 Summary All details of shifter duties and troubleshooting can be found in the CAL shifter’s guide (white binder or web) If in doubt… page expert!