Addressing Red Water in the Munger Place Area of Dallas Presented to Pipeline Program Design Group June 18, 2014 By RPS and Criado Associates, Inc.

Slides:



Advertisements
Similar presentations
City of San Jose General Services Department Fleet Management Division.
Advertisements

Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
GTI’s Composite Materials (CM) Program
Presentation for the Management Study of the Code Enforcement Process City of Little Rock, Arkansas August 3, 2006.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
By: Audella Eid Advisor: Dr. R. Zurayk Constructed Wetlands for Wastewater treatment.
Continuous Value Enhancement Process
Copyright © 2014 by the American Academy of Actuaries. All Rights Reserved. Michael E. Angelina, MAAA, ACAS Price Optimization Casualty Actuarial & Statistical.
Hurricane Scenario Office of Water (4608T) EPA 817-R September
Pipeline Hydraulics.
1 ALLOCATING POLICE RESOURCES FOR RESULTS. 2 As fiscal pressures on local governments increase, cuts to core services are being made without an adequate.
Auxiliary Services CWU Board of Trustees February 4, 2010.
Overview of Key Rule Features
Sterling Blvd Water Main Phase 2 IFB# WTR Pre-Bid Conference May 12, 2015.
Economics. Appraisal of Historic Property Appraisal Methods: Sales Comparison Approach Income Approach Cost Approach.
Quantifying Results Model Comparison Run models under various scenarios –Heavy load –Light load –Normal load Calculate cost reduction under new model.
Tasks in Step Two: Assess Hazard Vulnerability Session Name: Hazard Mitigation Planning II Coastal Hazards Management Course 2.1 Describe the community.
Simon Bunn – Derceto Inc
Repairing Our Cities’ Aging Pipelines Mayors’ Council on Pipeline Safety Conference May 2015 Kim Glas – Executive Director.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
Improving Safety of Crude Oil and Regional Water System Pipeline Crossings Pipeline Safety Conference November 5, 2010 Delvin E. DeBoer, Ph.D., P.E. South.
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Pipeline Replacement Project Why we need to replace the force main Silicon Valley Clean Water.
Hazardous Waste and Emergency Response
Fiscal Year 2009 Rate Adjustments Presentation to FPUA Board 1 March 3, 2009.
Excess Flow Valves – Implementation Challenges Bill Norton PIPES Act of 2006 PIPES Act of 2006 EFVs EFVs Anthony Cadorin City Of Mesa Sizing Procedures.
1 Fork Union Sanitary District Financial Overview January 6, 2010 (Updated for May 5, 2010)
I-15/LOS ALAMOS ROAD OVERCROSSING City Council Meeting January 17, 2012.
1 TOWN OF LOCKPORT FINANCIAL REVIEW Focus on the Sewer Plant and Sewer Collection Service.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
Wastewater Management
Why Use MONAHRQ for Health Care Reporting? May 2014 Note: This is one of seven slide sets outlining MONAHRQ and its value, available at
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Department of Water and Power City of Los Angeles Energy Cost Adjustment Factor Modification August 2009 MODIFIED PROPOSAL WILL BE SUBMITTED ON DECEMBER.
Shutting Down Nuclear Power Plants: Economic and Environmental Impacts 15 June 2011 Professor Paul Fischbeck Carnegie Mellon University
3M Water Infrastructure Space for 3M Montage © 3M All Rights Reserved. 3M Water Infrastructure General Overview Mayors Water Council Meeting 2009.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
Measuring Access to Community- Based Mental Health Services in California A Presentation to the California Mental Health Planning Council April 16th, 2009.
Central Petaluma Specific Plan TOD Marketplace September 29, 2006.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
East Lansing Public Schools PLANNING FOR THE FISCAL YEAR AND BEYOND March 28, 2005.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
Specific Applications Technical Reports Part II. Technical Reports Report structure is argumentative or chronological, what is the difference?Usually,
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
EPA Natural Gas Star Natural Gas Distribution Merrillville, IN June 3, 2003.
Writing an Outbreak Report Dr Noorhaida Ujang Epid Officer Muar Alor Setar,
© 2013 National Ecological Observatory Network, Inc. ALL RIGHTS RESERVED. UPDATE ON THE STATE OF NEON AND THE OPERATIONS AT TOOLIK FIELD STATION Faustine.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Water Rate Presentation City Council Meeting December 14, 2010.
WATER SYSTEM WORKSHOP February 27, 2012
Newport Beach City Council Meeting January 22, 2013 Agenda Item No. 16.
SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Providing Quality Water & Wastewater Services To the Coastal Communities.
Hydrotransport 15 Conference
Village of east aurora sycamore street water improvements
INTRODUCTION TO TRENCHLESS TECHNOLOGY
Adel M. Abdallah David E. Rosenberg
NC Division of Water Infrastructure Drinking Water Grant
Common Surveys Used For Commercial Real Estate Transactions
Facilities and Aggregate Planning
Water Department has Six Divisions
THE SKINNER COMPANY Product Review
Seattle Pipe Replacement Precedence
Adapting to Change: Utility Systems and Declining Flows
DAY 2 Single-Case Design Drug Intervention Research Tom Kratochwill
CONVENTIONAL FACILITIES LCLS Office Space
Lebanon Water Works National Optimization Goals Case Study - Meeting the Goals at the Lebanon Water Works Company Daren Thompson, MBA, MPM.
Presentation transcript:

Addressing Red Water in the Munger Place Area of Dallas Presented to Pipeline Program Design Group June 18, 2014 By RPS and Criado Associates, Inc.

Conditions Precedent 1. Established historic neighborhood, Munger Place 2. Cast iron pipelines up to 90 years old 3. Last 3-4 years, complaints of red water emerged 4. DWU has systematically begun assigning replacements of old cast iron pipelines in area 5. February 2014, DWU assigned design of major pipeline along Munger Boulevard to RPS 6. RPS hired Criado Associates, forming RPS Team

Features of Red Water Problems 1. Complex physical, chemical, biological interaction that does not respond to a single action in all systems 2. Three common characteristics -Prevalence of red water increases with pipe age -Stagnation time increases red water -Exposed iron pipe surface predictably is linear with red water generation

Table 1. Exposure Area of Typical Pipe Sizes to Corrosion

Table 2. DWU Assigned Project for Munger Place Service Area to RPS Team.

Table 4. Total Pipe and Exposed Iron Pipe Surface Remaining in Munger Place Area Nominal Pipe Size (in) Total Pipe Length (ft) Percent of Total Length (%) Approx. Total Square Footage of Exposure to Water (ft 2 ) Percent of Total Exposed Area (%) ≤ 36, , , , , , , , , , , , , , , , , , , , , , Total208, ,

Process for Decisions on Pipelines Recommended to be Replaced 1. Consider locations of alternatives relative to complaints area 2. Perform standard DWU design field review for all potentially affected pipelines 3. Use system model to confirm no major changes to system pressures or changes in direction of flow 4. Utilize size for targeting better iron water reduced interface

Recommended Improvements and Cast Iron Exposure Reduction

Table 6. Comparison of Open Cut to BOTOC

Improvement Options and Cost Comparison

Recommended Improvements and Methods

Procurement Options Traditional –Complete design –Advertisement –Council award Schedule = X months Buyboard –Pre-established specifications –Complete design –Application for purchasing through buyboard –Council award Schedule = (X- 1)months

Conclusions 1. Munger Place red water can be substantially reduced with this project 2. In most cases, BOTOC will result in lower costs and less community disruption 3. Caveat is that wastewater pipelines do not require replacement, though comparable costs for trenchless wastewater replacement will be less expensive than open cut

Questions

Table 8. Cost Estimate for Munger Blvd. & Henderson Ave. (Open Cut)

Table 9. Cost Estimate for Munger Blvd. & Henderson Ave. (BOTOC)

Table 10. Cost Estimate for I-30 Crossing & Beeman Ave. (Open Cut)

Table 11. Cost Estimate for I-30 Crossing & Beeman Ave. (BOTOC)

Table 12. Cost Estimate for Live Oak St. & Sycamore St. (Open Cut)

Table 13. Cost Estimate for Live Oak St. & Sycamore St. (BOTOC)

Table 14. Cost Estimate for Fitzhugh Ave. (Open Cut)

Table 15. Cost Estimate for Fitzhugh Ave. (BOTOC)

Table 16. Cost Estimate for Columbia Ave. (Open Cut)

Table 17. Cost Estimate for Columbia Ave. (BOTOC)

Title 35

Title 36