Earth-Sea Science Junction Boxes

Slides:



Advertisements
Similar presentations
MeDON meeting 09 mars IFREMER PROGRESS REPORT WP 3.5 dev & fabrication of the proof of concept architecture and description electronics and sofware.
Advertisements

Communication & Storage Front-end, 2 nd generation Jérôme Blandin, Julien Legrand, Laurent Gautier Ifremer COSTOF2 Handling large amounts of data with.
Antoine Lecroart Alcatel-Lucent
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ANTARES, CNRS, D.Lefevre,
Aloha Observatory Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE Jessica Craig, Oceanlab,
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Concepts for Integrating Ocean Science Sensors on Submarine Cables.
VLNvT workshop Amsterdam October 5-8th 2003 P. Lamare SACLAY DSM/DAPNIA Experience with electro-optic cable Wet mateable connection.
Ocean Technology Test Bed Colin Bradley, University of Victoria John Roston, McGill University NEPTUNE Canada VENUS.
Steven S. Thumbeck October 5-8, 2003 NIKHEF, Amsterdam VLV ν T Workshop "Technical Aspects of a Very Large Volume Neutrino Telescope in the Mediterranean.
Nexans experience in deployment of sensors in subsea cable systems
NEPTUNE Power System Low Voltage Circuit Preliminary Design Review Tim McGinnis Dec 4-5, 2003.
Amsterdam October 2003 M. Sedita VLVnT Installation and Maintenance of the submarine network The Maintenance aspect present some difficult as their.
Introduction to future synergy options Uli Katz ECAP, Univ. Erlangen Deep Ocean Cabled Observatories Amsterdam, May 2012.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
All Regions Workshop #2, 5-7 Oct , Paris, France G. Riccobene – LNS / INFN The East Sicily Node Facilities Giorgio Riccobene INFN-LNS, Catania
Inductive Power System for Autonomous Underwater Vehicles
IMPROUVEMENT OF COMPUTER NETWORKS SECURITY BY USING FAULT TOLERANT CLUSTERS Prof. S ERB AUREL Ph. D. Prof. PATRICIU VICTOR-VALERIU Ph. D. Military Technical.
1 Development of a Long Term Observatory Based on ESONET, VENUS, MARS and NEPTUNE Sponsored by StatOil To quantify fluid flow and carbon/methane oxidation.
ALCATEL Villarceaux, (France) Type of organisation: International Telecommunications Supplier Providing (amongst other things): Undersea Fiber Optics Cable.
ASMi-52L Ver – 2010 Slide 1 ASMi-52L v.2.01 GA.
A sensor architecture for neutrino telescopes on behalf of the KM3NeT consortium Els de Wolf Thank you, Claudio!
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
25 km E offshore Catania 2000 m depth TSS Frame Buoy Junction Box e.o. connection e.o. cable from shore Shore laboratory, Port of Catania e.o. cable.
Overview – HOT Site Hawaii Ocean Time-series “HOT” Site –3 Stations: Kahe, Kaena & ALOHA –monthly cruises for 15 years –ALOHA Station 100km N of Oahu.
 High-Availability Cluster with Linux-HA Matt Varnell Cameron Adkins Jeremy Landes.
The KM3NeT consortium ( - supported through the European Union's 6th framework programme in a 3-year Design Study - aims at the construction.
ALOHA Cabled Observatory Will use components from the earlier ALOHA- MARS Mooring project at APL-UW Seafloor secondary node Bottom instrument package with.
ALOHA-MARS Mooring Moorings called for in many OOI plans Features –Enables adaptive sampling –Distributes power, communications, time throughout the water.
Monterey Accelerated Research System
NEPTUNE Power Low Voltage Circuit Fall 2003 Quarterly Meeting Tim McGinnis Sept 11-12, 2003.
KM 3 Neutrino Telescope European deep-sea research infrastructure DANS – symposium Maarten de Jong.
Keck Meeting - UW10 January NEPTUNE – Technology Backbone system with branch units / hierarchy of Junction Boxes Power Parallel architecture -
NEMO-O DE NEMO First results from the NEMO Test Site G. Riccobene, for the NEMO Collaboration The NEMO Collaboration is performing the Phase 1 of the project,
VCL-SE IEEE-1588v2 PTP Protected Synchronous Packet-Optical Transport Interface Presentation.
Angelo Orlando for the NEMO collaboration VLV T08, Toulon, France April International Workshop on a Very Large Volume Neutrino Telescope for.
Status and Advances on the Acoustic Positioning System for KM3NeT Giuseppina Larosa, IGIC-UPV KM3NeT General Meeting, Nikhef 28-31/03/2011.
The sector of the Antares line to be deployed in the NEMO site Davide Piombo – INFN sez. Genova
KM3NeT-Toulon Infrastructure 22/06/121 NB: focus on latest developments, see February presentation in Catania for details KM3NeT meeting Erlangen,
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
The KM3NeT-IT sea bed infrastructure Collaboration meeting in Ischia, May 19th sea operations (see talk from Klaus) The new Cable Termination Frame Integration.
Seafloor Network KM3NeT Italia Strategy, Milestones and Cost R. Papaleo 22 june 2012.
Rosanna Cocimano for the NEMO collaboration VLV T08, Toulon, France April 2008 Rosanna Cocimano for the NEMO Collaboration A comparison of AC and.
Rosanna Cocimano Amsterdam, 5-6 July 2010KM3NeT WPF/L General Meeting Rosanna Cocimano INFN LNS Power plan for detector layout Presented in TDR.
M. Circella – ANTARES connectionINFN Comm. II, 5/6/2008 The ANTARES Connection Marco Circella --- INFN Bari 1.
SEA operations – June 2012 Short summary report R. Papaleo 22 june 2012.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
WPH goals: prepare the specifications for the main components of the deep-sea infrastructure: - Main electro-optical cable (MEOC); - Power transmission.
WP F/L Detection Unit Mechanical Structure and Deployment R. Papaleo 130/03/2011.
Calibration and Instrumentation: Overview and General Issues Robert Lahmann WPFL meeting Amsterdam 6-July-2010.
Seafloor Network Km3Net phase1 meeting R. Papaleo 30 jan 2013.
Deep sea infrastructure: ROV M. Musumeci KM3NET meeting Paris October 2008.
WP F/L Seafloor network, deployment vessels and ROVs for PPM P. Lamare – CEA Irfu 1WPF/L- PPM DU site- P. Lamare30/03/2011.
Status of the NEMO tower validation Integration Tests Improvements Deployment program M.Anghinolfi- km3-day meeting )
KM3NET-IT Tower Power System Rosanna Cocimano for KM3NET-IT Power Group 26 november
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
Aloha Observatory Design
Some developing ideas on Seafloor cabling and copper/fibreoptic split points where this talks builds and borrows from the work of VENUS, MARS, NEPTUNE.
Deep-sea neutrino telescopes
On behalf of Patrick Lamare
MARIGOLD the MEUST deep sea network
Write-up and Definitions for Cost Model
Marine and Environmental Agencies
Interdisciplinary Activity ANTARES
Expandable Seafloor Observatory
Data transport architecture over fiber and/or copper
Junction Boxes for KM3NeT
THE ANTARES SITE SECONDARY JUNCTION BOX
The Instrumentation Unit of The KM3NeT Calibration Unit
Presentation transcript:

Earth-Sea Science Junction Boxes Monty Priede Oceanlab University of Aberdeen WP9

Distributed junction boxes around the array KM3NeT Concept Distributed junction boxes around the array

Active Sensors Acoustic Optic KM3NET Safety Radius Benign Sensors only

4-5 km? KM3NET Safety Radius 1km

The Junction Box Footprint 1km <100Km

91 Towers Regular Hexagon Suggested Sea Floor Geometry of KM3NeT 91 Towers Regular Hexagon

Suggested Sea Floor Geometry of ES Science Junction boxes around KM3NeT A 0 : +2000 B -1732: -1000 B +1732: -1000 1000m 2000m Safety Radius

800 km loop

Neptune-Canada 400V 10kV 10kW

MARS Concept (Monterey)

MARS – NEPTUNE Junction Boxes

Neptune-Canada Junction Box http://www.neptunecanada.ca/jb_test/perf_reqs_junction_boxe_CV2_080620.pdf

Neptune-Canada Junction Box 10 individual instrument interfaces Ethernet or serial communication links. 1.5 kW of power to each instrument Variety of voltages to allow for maximum configurability switch supply up to 6kW at 400V for high power loads. The Junction Box connects to the node. Instruments up to 10 km away from the Node and at depths up to 3000m

Tests at Alcatel Greenwich Neptune-Canada Junction Box Oceanworks Tests at Alcatel Greenwich September 2008

Junction Box (JB) architecture example Yves Auffret Ifremer Switch(es) CoS, QoS, PTP Boundary clock, VLAN, LACP, port Trunk,… Eth 1000LX (fiber) – 400VDC – NTP/PTP Eth 1000LX (fiber) – 400VDC – NTP/PTP Applications: Daisy chain for another JB, power equipments: robotics, vertical profiler… network extension up to 20km Eth 100BT (copper) – 48VDC – NTP/PTP + PPS/NMEA Eth 100BT (copper) – 48VDC – NTP/PTP + PPS/NMEA Node or JB Extension modules (up to 4 modules): IP server RS232/422/485, VDSL2 modem… Applications: Ethernet scientific instruments, ex: Seismometer (OBS), still camera , video, hydrophone, crawler… RS232/422/485 – 48VDC – PPS/NMEA Applications: Serial scientific instruments ex: ADCP, piezometer (pore pressure sensor) , seismometer, CTD, chemical analyzer,… 400VDC + Eth 1000LX (fibre) 1 or 2 fibres (fail-over, load balancing,..) Or 400VDC + xDSL (few km network extension) VDSL2 Modem – 400VDC – NTP/PTP Applications: Network extension, measurements in water column, instrument or instrument cluster up to 5-6km (low cost extension (vs. fiber), seismic network, acoustic network,… PTP/IEEE1588 clock client (PPS + NMEA time code) Control/command power supplies – faults detection Réseaux câblés et systèmes instrumentaux October 13th, 2008 15 15

Neptune-Canada Junction Box http://www.neptunecanada.ca/jb_test/perf_reqs_junction_boxe_CV2_080620.pdf

1. Eth 1000LX (fiber) – 400VDC – NTP/PTP Applications: Daisy chain for another JB, high power equipment: robotics, vertical profiler… network extension up to 20km Daisy chain Extension to 20 km

Ethernet scientific instruments, 2. Eth 100BT (copper) – 48VDC – NTP/PTP + PPS/NMEA Ethernet scientific instruments, Seismometer (OBS), still camera , video, hydrophone, crawler… <1km

Serial scientific instruments 3. RS232/422/485 – 48VDC – PPS/NMEA Serial scientific instruments ADCP, piezometer (pore pressure sensor) , seismometer, CTD, chemical analyzer,… <1km

4. VDSL2 Modem – 400VDC – NTP/PTP Network extension, measurements in water column, instrument or instrument cluster up to 5-6km (low cost extension (vs. fiber), seismic network, acoustic network,…,… Up to 5-6km

KM3NET Sites 100km radius Potential Footprints ANTARES- Ligurian Sea 2475 m NEMO - Ionian Sea 3350m NESTOR - Ionian Sea 4500/5200m

2km and 12km radius footprints at Pylos

Junction box Mechanical Components ROV servicable Connection to Network Cable (In case of failure) Housing (In case of failure) Observatory & Extension Manifold Connections Wet-mateable (in case of failure – 6 month service interval) Foundation Frame (permanent)

MARS Concept (Monterey) Observatories distributed on the sea floor

DELOS Concept (Angola) Observatory Modules on a frame Modules serviced By ROV every 6 months 8m 25 year life 4m Mud mat Foundations

Neptune-Canada Junction Box The Vertical Profiler System is lowered into a wet testing tank at NGK Co. in Saitama Japan, 3 Sept 08

Earth-Sea Science Junction Boxes Key Steps for TDR Do we take Optical Fibre through to observatories? Details of wet mateable manifold connectors Safety of power management- switching loads ESS data portal