1 Status on ISMO, IRP2010 and New Generation Regulations.

Slides:



Advertisements
Similar presentations
Hydropower Development Policy & Regulatory Framework
Advertisements

Independent System & Market Operator (ISMO)
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
IRP – Commitments required now Our objectives – IRP alignment (water, security, emissions, cost etc.) – Legal diligence – Financial sustainability (buyer.
‘Regional Regulation between the SADC Countries’ Presentation to 18 th World Energy Congress Round Table 10 – B 23 October 2001 Xolani Mkhwanazi Chief.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
LEARNING OBJECTIVES Relate Food Security Policies (FSPs) to a framework for action to combat hunger and alleviate food insecurity in a country; Explain.
World Class Minerals and Energy sectors for the benefit of all Overview of the Electricity Regulation Bill.
NERC LICENSING AND REGULATORY FRAMEWORK Dr. Steven Andzenge, MON Commissioner Legal, Licensing & Enforcement, NERC Abuja, 29 th November, 2011.
18 September 2012 Independent System and Market Operator Bill. Progress Report on further Due Diligence incorporating transfer of assets.
Electricity Reforms and Regulations in Nepal Navin Dahal South Asia Watch on Trade, Economics & Environment (SAWTEE)
Electricity Industry Deregulation in Taiwan I. Summary of the Framework of Electricity Industry Liberalization in Taiwan.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
Breaking Legal Grounds…. Implementing a PCF Project Sao Paulo, Brazil - November 20, 2002 Charlotte Streck, PCF.
AFRICAN UTILITY WEEK Cape Town – 8 May Contents The legislative context for energy regulation –Relevant Acts –Regulatory Functions –Regulations.
Department of Finance Workshop with private sector Merger Implementation Group 16 July 2013 Merger of Synergy and Verve Energy.
MONRE UNEP-RISO NATIONAL WORKSHOP ON CAPACITY DEVELOPMENT FOR CDM Hanoi, 27-28/11/2002 Proposal for establishing National Authority on CDM in Vietnam Dr.
INTRODUCTION ELECTRICITY DISTRIBUTION MAINTENANCES SUMMIT 9 & 10 JUNE 2008 GALLAGHER ESTATE – MIDRAND CLLR: S. Mashilo NATIONAL EXECUTIVE COMMITTEE MEMBER.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
2 nd National Energy Efficiency Strategy Review EELN Consultation Workshop 24 April
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 Click to edit Master subtitle style 5/24/12, Version Control South African Electricity Supply Sector ISMO Bill Independent System and Market Operator.
Regulation and Sustainability A set of tasks and responses – varying by structure and stage Dennis Volk Programme Officer.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Briefing on Progress made with regard to Prevention and Management of Child Abuse and Neglect Especially Child Sexual Abuse Presentation at the Portfolio.
PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ON TRADE AND INDUSTRY 14 NOVEMBER 2012 IPAP 2012/10.
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
SMART ELECTRICITY Planning and building a modern infrastructure for South Africa SMART Electricity Planning a healthy, modern, affordable electricity supply.
Background The Department has adopted an IRP with 42% target of electricity generation from renewable energy sources 03 rd August 2011 the Department.
PRESENTATION TO PARLIAMENT’s PORTFOLIO COMMITTEE ON TRANSPORT 16 th February 2005 REVISED TAXI RECAPITALISATION PROJECT.
Session 2 Laws and Regulations Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
Annual Report, Financial Performance and Eskom Price Review 2005 PRESENTATION BY THE NATIONAL ELECTRICITY REGULATOR (NER) TO THE PARLIAMENTARY PORTFOLIO.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Medical Schemes Amendment Bill, 2002 Department of Health Briefing to Portfolio Committee on Health 3 September 2002.
1 ELECTRICITY REGULATION AMENDMENT BILL. 2 BACKGROUND Industry structure Electricity value chain Consequences of unregulated “reticulation” History in.
Presentation to Select Committee on Economic Development
DEVELOPING THE WORK PLAN
Establishing the Independent System & Market Operator. (ISMO) 30 January 2013.
Establishing the Independent System & Market Operator (ISMO) March 2012.
Infrastructure Development Corporation Limited Risk Mitigation through Project Development Focus on Safer Airplanes in addition to better Parachutes Pradeep.
BRIEFING ON SCHOLAR TRANSPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON TRANSPORT By Mr George Mahlalela Director General 12 April April 2011.
6 th Zimbabwe Mining and Infrastructure Indaba 8-10 October 2014 Harare, Zimbabwe.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON HUMAN SETTLEMENTS 25 JULY 2013 PROGRESS IN RE GOVERNMENT’S INTERVENTION IN THE LENASIA HOUSING PROBLEM 1.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
IPP Bidders Conferance LICENSING OF IPP PREFERED BIDDERS DoE IPP BIDDERS CONFERENCE – Presented by TAMAI HORE.
Integrated Resource Plan 1
Portfolio Committee- Trade and Industry – 11 March 2015
Establishing the Independent System & Market Operator (ISMO)
2014 Adjustment Appropriation
Independent System and Market Operator Bill.
Overview of the Electricity Regulation Bill
Overview of the Electricity Regulation Bill
NEDLAC REPORT TO THE NATIONAL ASSEMBLY PORTFOLIO COMMITTEE ON ENERGY
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
IPP Office: Role and Mandate
Oman’s Electricity Sector: A Hidden Gem for Investments
SACF Comments on the ECA Amendment Bill B
DEPT OF TRANSPORT BRIEFING ON SCHOLAR TRANSPORT TO THE PARLIAMENTARY PORTFOLIO COMMITTEE ON TRANSPORT 30 AUGUST 2011.
Presentation to the Parliamentary Portfolio Committee
Director-General: Mr. E Africa
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

1 Status on ISMO, IRP2010 and New Generation Regulations

2 Table of Contents The Regulatory Framework Electricity Regulator Act Regulations under the ERA New generation capacity regulations The Buyer Integrated Resource Plan (IRP) Conclusion

3 Regulatory Framework  Energy regulator Act  National Energy Act  Electricity Regulator Act Electricity Regulator Act –Provides for licensing of generation, transmission, distribution and trading. –Allow for development of the Integrated Resource Plan (IRP) by the government. –Allows the regulator to issue generation license in line with the IRP. –Provides the promulgation of various regulations by the Minister. Regulations under the ERA –Expropriation regulation –Regulations on norms and standards for reticulation services –New generation capacity regulations

4 New Generation Capacity Regulations Provide a framework for: –Procurement of new generation capacity through:  IPP bid programme  REFIT programme –The development of the Integrated Resource Plan (IRP) Note that the REFIT programme is a programme designed to meet the immediate renewable target The role of the regulator, SO and the plans are outlined whilst the buyer remain undetermined In terms of the Act and the regulations, the Minister must determine the buyer of power emanating from the two programmes.

Who is the buyer? –The Minister needs to do the determination in accordance with the ER Act and the regulations –Discussions are taking place at Inter-Ministerial Committee on energy on how best to establish an independent buying function –The Department of Energy is currently negotiating a Bill at the inter- governmental level for the establishment of an Independent System and Market Operator.

The Integrated Resource Plan (IRP) –IRP 1 was completed with a 3 year window lifespan –IRP 2 is close to completion –Assumptions for the IRP 2 were completed and consulted with stakeholders –A base case has been completed and presented to the IMC on energy –A policy and risk adjusted IRP will be out for stakeholder comment shortly –IRP 2 approval is expected in late November 2010 and it will be valid for 20 years. –The IRP2 may be reviewed as and when necessary.

Conclusion It should be noted that the whole regulatory framework is under review to allow for easy participation of IPPs in electricity generation In the absence of an independent buyer, the Department will facilitate the documentation for the procurement of the IPPs. After the Ministerial determination, all procurement documentation will be transferred to the designated buyer.