Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry.

Slides:



Advertisements
Similar presentations
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Advertisements

RockSat-C 2012 CoDR Minnesota Sound Wreckers Conceptual Design Review University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Team Name Conceptual Design Review Team Members Date Fall 2011 Rev A
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Preliminary Design Review Northwest Nazarene University Advisor: Dr. Lawrence Chad Larson Ben Gordon Seth Leija David Vinson Zach Thomas Drew Johnson.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
University of Wyoming Charles Galey, Nicholas Roder, Peter J. Jay, William Ryan 10/14/
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
2012 CoDR Nitric Oxide and Piezo Dust Detector Probe Conceptual Design Review Virginia Tech Presented by Stephen Noel November 18,
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Good Vibrations Conceptual Design Review University of Wyoming James Richey, Justin Thornton, Luke Voss, Jake Thatcher, Tony Allais Oct 27, 2008.
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Rock Sat-C Conceptual Design Review The New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Mike Giglia, Ethan.
Space Cowboys. Mission Overview Objective – Accurately measure flight parameters including ambient and skin temperatures, pressure, acceleration, spin.
Team Name Launch Readiness Review Team Members Date Fall 2011 Rev A
Team Name Final Presentation Team Members Date Rev
2011 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Tres Volcanus “Team V” Conceptual Design Review Community College of Aurora Adam Kim Ian Jones Dani Strohmier 06/10/10.
NORTHWEST NAZARENE UNIVERSITY CHAD LARSON, BEN GORDON, DAVID VINSON, SETH LEIJA, ZACH THOMAS, DREW JOHNSON NNU Team Conceptual Design Review.
RockSat-C 2011 CoDR Harding Flying Bison ROCKSAT-C Team Conceptual Design Review Harding University Ed Wilson, Mentor, Will Waldron, Student 2, Student.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
LSU 10/09/2007System Design1 Project Management Unit #2.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Critical Design Review Team Name University/Institution Team Members Date.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
2014 CDR Team Name Critical Design Review CDR CDR Delieverables 1.Mechanical drawings in pdf format 2.Electrical schematics in pdf format 3.Completed.
MINNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Tom Thoe Bryce Doug Carlson 11/14/2008.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
User notes: –Please use this template to create your Proposal Analysis Review –You may reformat this to fit your design, but make sure you cover the information.
LSU 01/17/2006Spring LaACES Schedule For the semester and the next few weeks.
Team Parro Project HUSP. Team Members Jason Rollins – Project Manager / Electrical Design Jason Rollins – Project Manager / Electrical Design Shawn Mullins.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
MNROCK CONCEPTUAL DESIGN REVIEW University of Minnesota William Ung Scott Balaban Bryce Schaefer Tom Thoe 11/3/2008.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Team Name Preliminary Design Review
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
2016 FMSR Team Name Full Mission Simulation Review (FMSR) University/Institution Team Members Date 1.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Preliminary Design Review Metro State College of Denver Matthew Hanley, Daniel Bass 14 November 2008.
Tethered Aerostat Program Preliminary Design Review Team Name Preliminary Design Review College Team Members Date.
Tethered Aerostat Program Critical Design Review Team Name Critical Design Review College Team Members Date 1.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
2016 PDR Team Name Preliminary Design Review University/Institution Team Members Date 1.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
About the Program ●Program Goals ●Community/public support.
Planetary Lander PDR Team Name
Team Name Preliminary Design Review
Team Name Critical Design Review
Team Name Conceptual Design Review
Team Name Conceptual Design Review
FRIDAY SLIDES TEMPLATE
SUNDAY SLIDES TEMPLATE
<Your Team # > Your Team Name Here
Project Management Unit #2
<Your Team # > Your Team Name Here
<Your Team # > Your Team Name Here
Presentation transcript:

Tethered Aerostat Program Concept Design Review College of Menominee Nation Conceptual Design Review College of Menominee Nation Marilyn Madosh, Larry Madden, Alex Adamski,Travis Spice, Ariel Sanapaw, Amy Jozwiak, Ricki Dodge, Lincoln Peters March 21, 2015

Tethered Aerostat Program Concept Design Review Template Notes: You can reformat this template to fit your design, but you must cover all the information requested on the following slides This template contains all of the information you are required to convey at the CoDR level. If you have questions, please contact your advisor or Dan Hawk,

Tethered Aerostat Program Concept Design Review Template Notes The Goals of the CoDR are: Clearly present a Concept of your payload Science objectives (theory, background, and what mission will prove) are understood and well-defined Preliminary mission requirements are defined and traceable to science objectives Understand concept of operations Understand mechanical and electrical interfaces

Tethered Aerostat Program Concept Design Review CoDR Presentation Content Section 1: Mission Overview Mission Statement Mission Objectives Theory and Concepts Concept of Operations Expected Results Section 2: Design Overview Science Design Engineering Design Functional Block Diagram Payload Layout (sketches) Tethered Aerostat/Payload User’s Guide Compliance

Tethered Aerostat Program Concept Design Review CoDR Presentation Contents Section 3: Management Team Organization Schedule Budget Mentors (Faculty, industry) Risks/Worries Contact and Availability Matrices Section 4: Conclusions jessicaswanson.com

Tethered Aerostat Program Concept Design Review Mission Overview: Mission Statement CMN’s TAP Mission is to measure the pulse of the forest. We will develop methods to monitor and assess our forest resources. We would like to discover the effects of climate change on a one hectare plot already being monitored from the ground. This data will become part of a larger project funded primarily through USDANIFA Tribal Research Grant Program titled “ Measuring the Pulse of the Forest.”

Tethered Aerostat Program Concept Design Review Mission Overview: Mission Objectives Mission Objectives  derived from mission statement Find out what type of data we can collect Figure out what equipment we need to collect the data Build a payload with this equipment Launching and Collecting Data Analyze the data Share information with the greater project Collaboratively analyze the data

Tethered Aerostat Program Concept Design Review Mission Overview: Theory and Concepts Climate Change is causing a strange phenomenon in tree species. The warming is causing certain species of tress to die out in regions that they have lived for hundreds of years. Many species of trees are losing their competiveness over environments and therefore allowing newcomers to move in and replace them. Trees have adapted to specific environments, including temperature, cold-tolerance, and other factors. However, as those environments change these species could lose their competitive edge and begin to decline or even die out completely. Research is already happening. A one hectare wooded plot was surveyed and being monitored for total trees, tree species, and average DBH(Diameter at Breast Height) Plant data is also being collected, this data includes plant identification. Results at

Tethered Aerostat Program Concept Design Review Mission Overview: Concept of Operations After determining what data we can collect, we can figure out what equipment will be needed. This will be determined at Workshop #2 Saturday, March 21, Build and Test Payload equipment by April 1, We would like to do a launch by May 1, 2015.

Tethered Aerostat Program Concept Design Review Mission Overview: Expected Results Go over what you expect to discover and what you data might look like Ex. What wavelengths do you expect to see? How many particles do you expect to measure? How many counts of radiation? Etc. This is vital in showing you understand the science concepts

Tethered Aerostat Program Concept Design Review Design Overview: Science Design Summarize the instrumentation/sensors/devices that will be used to complete your science mission Present a concept of HOW your science hardware will work to achieve your mission

Tethered Aerostat Program Concept Design Review Design Overview: Engineering Design Describe/summarize your current design used to support your Science Design Be sure to cover major subsystems like Structures, Power, Command and Data Handling, Software Utilization of heritage elements (designs/features used on previous flights) defined. Major technology dependencies?

Tethered Aerostat Program Concept Design Review Design Overview: Functional Block Diagram Functional block diagram Shows HOW subsystems interact with each other Shows HOW data will be recorded and stored Shows HOW power and data flow through subsystems Example on following slide I will spend a lot of time on this diagram with each team and it will be referred to all the way up until launch so make it good

Tethered Aerostat Program Concept Design Review

Tethered Aerostat Program Concept Design Review Design Overview: Payload Layout Initial drawings/sketches/layout of your deck Conceptual idea of how and where things will be mounted Show where electronics boards (~how many?), sensors, power will be mounted Rough dimensions and weight estimates

Tethered Aerostat Program Concept Design Review Management Team organization chart Preliminary schedule for the semester Monetary budget Team mentors (industry, faculty)? Contact Matrix Team Availability (MDT) Matrix

Tethered Aerostat Program Concept Design Review Risks/Worries: What are your biggest worries or potential failure points with your conceptual design? Items identified should be completely mitigated through your design effort and fully addressed by CDR

Tethered Aerostat Program Concept Design Review Next steps for your team to get to PDR Anything you need to investigate further? Begin requirement flow down process for system and subsystems Conclusion