LHC LHC Wire Scanners: Updates on Measurement Accuracy Emittance Meeting 18 November 2015 Maria Kuhn – 18 November 2015 Many thanks to G. Baud, E. Bravin,

Slides:



Advertisements
Similar presentations
Low x workshop Helsinki 2007 Joël Feltesse 1 Inclusive F 2 at low x and F L measurement at HERA Joël Feltesse Desy/Hamburg/Saclay On behalf of the H1 and.
Advertisements

Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
ECFA-DESY workshop, NIKEF 1 st April, 2003Nick Walker, DESY Energy Spread Measurement in the TESLA Extraction Line Nick Walker - DESY.
PS wirescanner calibration Student Meeting 10/03/2014 Carolina Bianchini BE-BI-BL.
LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
AAC 2006V.Shiltsev 1 Electron beam generation and control in Tevatron Electron Lenses Vladimir Shiltsev, R.Hively, V.Kamerdzhiev, G.Kuznetsov, H.Pfeffer,
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
LHC Emittance Measurement Preparation during LHC Commissioning LBOC Meeting February 17, 2015 Maria Kuhn – February 17, 2015.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
LHC First LHC Emittance Measurements at 6.5 TeV IBIC15 Melbourne, Australia 2015 Maria Kuhn 1,2 – September 16, 2015 F. Antoniou 2, E. Bravin 2, B. Dehning.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Beam Commissioning WG, 10 August Luminosity Scans in the LHC S. White.
Muon-raying the ATLAS Detector
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Coping with Emittance Measurement Challenges in the LHC after LS1 Gentner Day October 2014 An Overview of Control and Data Flow Related to LHC Emittance.
LHC LHC Emittance Measurements and Preservation LBOC Meeting July 28, 2015 Maria Kuhn – July 28, 2015 Many thanks to G. Baud, E. Bravin, B. Dehning, J.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Beam Dynamics Meeting Bolko Beutner, DESY Summary of new FLASH CSR studies Bolko Beutner, DESY Beam Dynamics Meeting
G. Trad on the behalf of the BSRT team LHC BI 2015 summary 13/11/2015.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
LHC LHC performance with low-emittance h=9 beam Focus on emittance preservation M. Kuhn, H. Bartosik, B. Dehning, A. Guerrero Ollacarizqueta, V. Kain,
LHC Emittance Preservation MD 3 - Preliminary Results M. Kuhn, V. Kain, G. Arduini, J. Emery, W. Hofle, A. G. Ollacarizqueta, F. Roncarolo,
Wire Scanners Observations In SPS & LHC G. TRAD Emittance working group 26/08/2015.
LHC Updates on the LHC Wire Scanner Application --- Transverse Emittance Blow-up during the LHC Ramp Verena Kain, Maria Kuhn 1 11/12/2013.
LHC First LHC Emittance Measurements at 6.5 TeV Emittance Meeting August 26, 2015 Maria Kuhn – August 26, 2015 Many thanks to G. Baud, E. Bravin, B. Dehning,
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Twin bunches at FACET-II Zhen Zhang, Zhirong Huang, Ago Marinelli … FACET-II accelerator physics workshop Oct. 12, 2015.
BI MD# BSRT Measurements Beam 1 and 3.5 TeV 2 bunches with different emittances Bumps: -4, -2,0,2,4 mm Results: 3.5TeV.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
First Ideas – New Wire Scanner GUI - LHC V. Kain, G. Crockford, M. Kuhn Emittance Working Group 6/26/
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Statistics 2015 Fixed Target CT/MTE and LHC BRIGHTNESS Eric Veyrunes, Johan Dalla-Costa, Diego Perez.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
LHC Wire Scanner Calibration
M. Kuhn, P. Hopchev, M. Ferro-Luzzi
Beam-beam effect with an external noise in LHC
Electron Cooling Simulation For JLEIC
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
MD #453 Effect of low frequency noise
Emmanuel Tsesmelis TS/LEA 26 January 2007
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Lebanese Teacher Programme 18/04/2017
Field quality to achieve the required lifetime goals (single beam)
Tuesday Nov 16th Fill 1492 into physics around 07.30
LHC Emittance Measurements and Preservation
Beam Optics Set-Up at SLAC End Station A
Summary of Space-Charge Measurements, 2011
Transverse emittance measurements from FWS
e+ Vertical Beam Size during CESR-c Collisions
e+ Vertical Beam Size during CESR-c Collisions
I-LHC NOMINAL ions beam in 2007
Injector Setup for G0 and HAPPEX & Lessons Learned
Studies on orbit corrections
Measurement of the beam (transverse) emittances
ATLAS full run-2 luminosity combination
Beam Stability of the LHC Beam Transfer Line TI 8
Monday 152 bunch operation summary
Presentation transcript:

LHC LHC Wire Scanners: Updates on Measurement Accuracy Emittance Meeting 18 November 2015 Maria Kuhn – 18 November 2015 Many thanks to G. Baud, E. Bravin, B. Dehning, J. Emery, V. Kain, E. Piselli, G. Trad

LHC Outline Accuracy of LHC emittance measurements with wire scanners: oProblem: scan-to-scan beam size spread oSolution: new fitting method to reduce the position measurement uncertainty oUpdated scan-to-scan beam size spread oComparison with simulations oUnsolved: beam 2 vertical emittance fluctuations at 6.5 TeV 2 M. Kuhn - 18 November 2015

LHC Scan-to-Scan Emittance Spread oExample measurement with wire scanners at the beginning of the 2015 LHC proton run oLarge absolute emittance spread from scan to scan – WHY? − More emittance spread at higher energies 3 M. Kuhn - 18 November 2015

LHC Scan-to-Scan Beam Size Spread oAbsolute beam size spread larger at lower energies! − But in terms of emittance spread is larger at 6.5 TeV than at 450 GeV oRelative beam size spread ~ 10 % for all scanners and energies 4 M. Kuhn - 18 November 2015 ScannerB1H2B1V2B2H1B2V1 450 GeV  [  m]  [  m] 100  [  ] TeV  [  m]  [  m] 20  [  ] 9686

LHC Problem: Position Measurement oWire position measurement read out is noisy! 5 M. Kuhn - 18 November 2015 Why is the wire position more noisy at larger revolution number?

LHC New Fitting Method – from George 6 M. Kuhn - 18 November 2015 ScannerB1H2B1V2B2H1B2V1 450 GeV  [  m]  [  m]  [  ] TeV  [  m]  [  m]  [  ] Problem in beam 2 remains! G. Trad

LHC Comparison with Simulations (1) oSimulated 40  m Gaussian distributed noise on wire position read out − For profile at 450 GeV (1000  m) and 6.5 TeV (300  m) 7 M. Kuhn - 18 November 2015

LHC Comparison with Simulations (2) oSimulated 40  m noise on wire position read out − For profile at 450 GeV (1000  m) and 6.5 TeV (300  m) oComputed statistical fluctuations for 1000 scans: − looking for 30  m spread at 450 GeV and 10  m spread (B1) at 6.5 TeV 8 M. Kuhn - 18 November 2015 Can simulate beam size spread for small , but not for large .

LHC Comparison with Simulations (3) oNeed to include Gaussian distributed scaling error on profile amplitude read out − Error gradually increases from profile centre 9 M. Kuhn - 18 November 2015 Position [mm]< > 2 Error

LHC Comparison with Simulations (4) oNeed to include Gaussian distributed scaling error on profile amplitude read out − Error gradually increases from profile centre oComputed statistical fluctuations for 1000 scans: − looking for 30  m spread at 450 GeV and 10  m spread (B1) at 6.5 TeV 10 M. Kuhn - 18 November 2015 Can simulate beam size spread for small , but not for large .

LHC M. Kuhn - 18 November 2015 Wire Scanner 6.5 TeV (1) oObserve large beam size fluctuations at flattop energy − Only for wire scanner B2V1 (on a smaller scale also for B2H1) 11

LHC M. Kuhn - 18 November 2015 Wire Scanner 6.5 TeV (2) oObserve large emittance fluctuations at flattop energy − Visible over long periods of time − Not seen with BSRT 12 G. Trad BSRT bunch 1 BSRT bunch 2 WS bunch 1 WS bunch 2

LHC Summary oLarge beam size spread from scan to scan observed at all energies − More  spread for larger beam sizes oPartially due to wire position read out noise − When fitting the position measurement error could be reduced from 10 to 3 % in beam 1 − Beam 2 still shows large spread at flattop energy oSimulation cannot fully reproduce the picture − Even when including scaling error on profile amplitude read out oAlso observing large fluctuations of B2V1 beam size at 6.5 TeV − Very difficult to determine absolute emittance at flattop energy, for example to compare to OP scans 13 M. Kuhn - 18 November 2015