Diversification of Energy Power Plants in the North of Chile Matías Raby.

Slides:



Advertisements
Similar presentations
Support of renewable energy: Prices versus quantities GIN 2006, Cardiff Jeroen De Paepe University of Ghent.
Advertisements

Capital Budgeting.
Chapter 25 Risk Assessment. Introduction Risk assessment is the evaluation of distributions of outcomes, with a focus on the worse that might happen.
Chapter 10 Dealing with Uncertainty Introduction ---exacerbated by regulatory & environmental uncertainty Restructuring of the electric industry,
Power Plant Development Options in Abu Dhabi Application Portfolio ESD.71 Engineering Systems Analysis for Design Kyle Frazier December 2007.
Capital Budgeting. Cash Investment opportunity (real asset) FirmShareholder Investment opportunities (financial assets) InvestPay dividend to shareholders.
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Operations management Session 17: Introduction to Revenue Management and Decision Trees.
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Strategy and Analysis in Using NPV (Chapter 8) Financial Policy and Planning MB 29.
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating.
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
Chapter 11 Cash Flow Estimation & Risk Analysis. 2 Topics Estimating cash flows: Relevant cash flows Working capital treatment Risk analysis: Sensitivity.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Unit 2 – Measures of Risk and Return The purpose of this unit is for the student to understand, be able to compute, and interpret basic statistical measures.
1 Real Options Analysis Office Tower Building Portfolio Presentation Fall 2008 ESD.71 Professor: Richard de Neufville Presented by: Charbel Rizk.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Generation Expansion Daniel Kirschen 1 © 2011 D. Kirschen and the University of Washington.
Value of Flexibility an introduction using a spreadsheet analysis of a multi-story parking garage Tao Wang and Richard de Neufville.
Japan Energy Update Kae Takase Senior Economist Governance Design Laboratory.
Portfolio Management Lecture: 26 Course Code: MBF702.
Future of Renewables in Victoria Dr Jeff Washusen Marsden Jacob Associates VPELA 30 April 2012.
A Balanced Energy Plan for Alaska’s Railbelt Opportunities for End-Use Efficiency/Conservation and Renewable Energy Prepared for the Alaska Clean.
Identification and Quantification of Incremental Market Risk By Sy Sarkarat Ph. D.* * Dr. Sarkarat is professor of economics at WVU-Parkersburg, his research.
A2 Business Studies Objectives and Strategy –Unit 6 Decision Trees.
IPM Overview Elliot Lieberman U.S. Environmental Protection Agency Washington, D.C
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
Economics of Alternative Energy Sources and Globalization Nov Orlando, Florida The Economic Feasibility of Bio-energy Generation for Peak Demand.
KEC Electricity Committee, March 12, 2008 Benefit Cost Study of the Governor’s 2015 Wind Challenge: 1,000 MW by 2015 Bob Glass KCC Utilities Division,
Fixed cost, Financing and Limited Liability. Financing and Uncertainty The necessity of fixed cost often raises the question of financing. Sometimes financing.
1 Prentice Hall, 1998 Chapter 11 Cost of Capital.
© Prentice Hall, Corporate Financial Management 3e Emery Finnerty Stowe Cost of Capital.
MIT SLOAN SCHOOL OF MANAGEMENT Class Evaluating projects (3) Class 5 Financial Management,
The Economics of Alternative Energy Sources and Globalization: The Road Ahead Embassy Suites Airport, Orlando, FL 1.
Economics of electricity production and competitiveness of nuclear energy Prof. Dr.-Ing. Alfred Voß Institute of Energy Economics and the Rational Use.
Economic Planning – Theory and Current Practice Dan Woodfin Director, System Planning Joint PLWG/CMWG Meeting 2/4/2011.
Capital Budgeting.
Natural Gas and Power Generation Natural Gas and Power: A Look at Prices Carbon Legislation and Power Generation The future of Power Generation and the.
Application Portfolio for ESD.71 Kevin Ferrigno Professor: Richard de Neufville TA: Michel-Alexandre Cardin.
© Copyright 2004, Alan Marshall1 Real Options in Capital Budgeting.
ECONOMICAL VIABILITY OF THE NUCLEAR OPTION IN MEXICO Instituto Nacional de Investigaciones Nucleares.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
Contemporary Engineering Economics
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
PORTFOLIO RISK ANALYSIS BASED GENERATION EXPANSION PLANNING Presenter: Nguyen Xuan Phuc Asian Institute of Technology School of Environment, Resources.
Heating System for a Group of Condominiums Rory Clune Dept. of Civil & Environmental Engineering, Massachusetts Institute of Technology ESD.71 Application.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
1 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating projects with embedded options Valuing real options in projects.
Electricity Market Game Review 13ELP044&644 CREST, Loughborough University.
Real Options Valuation of a Power Generation Project: A Monte Carlo Approach Bruno Merven ( 1 ), Ronald Becker (2) ( 1 )Energy Research Centre-University.
CHAPTER 8 DIVIDEND POLICY. Concept of Dividend Policy Dividend policy involves the decision to –pay out earnings to shareholders –retain them for reinvestment.
ELECTRICITY SECTOR IN CHILE ADJUSTMENT IN TIMES OF CHANGE
Contents Introduction Focus area Wind scenarios
Introducing Real Options
ENGINEERING ECONOMIC DECISION CHAPTER 1
Chapter 10 - Monte Carlo Simulation and the Evaluation of Risk
ESD 71 Final Project: Second-Mile Internet Data Backhaul in Kenya
Application Portfolio: Fort Carson Solar Project
Garage case: Simulation Example
Flexibility in an Aircraft Assembly Plant
Abu Dhabi Transport System
Option Valuation for National Retailer
ESD 71 Final Project: Second-Mile Internet Data Backhaul in Kenya
Management Accounting
Production and Operations Management
INVESTING IN HUMAN CAPITAL
Presentation transcript:

Diversification of Energy Power Plants in the North of Chile Matías Raby

Introduction Matías Raby SING Demand for electricity in the SING is expected to increase considerably during the following years. SING depends 99.6% on fossil fuels. Government planning to diversify energy generation matrix. Nuclear is an interesting option.

The System Matías Raby Evaluation of two investment options of energy power plants for the SING. Fixed Option: Large nuclear power plant with a capacity of 1,200 MW with no potential to be expanded in the future. Flexible Option: Medium size nuclear plant with a capacity of 600 MW. This system has the potential to be expanded in the future to either of the following alternatives: 1.Additional medium size nuclear power plant with a capacity of 600 MW. 2.Additional medium size gas-fired power plant with a capacity of 600 MW.

Uncertainties Matías Raby Future demand of electricity. Future price of natural gas. Government regulation of carbon emissions.

Structure of Analysis Matías Raby Evolution of uncertainties. Excel Simulation. Multidimensional comparison of the results.

Future Demand of Electricity Matías Raby Two sources of uncertainties: Annual volatility: 10% based on historical data. Variability in projection of demand: 36% based on CNE forecast.

Future Demand of Electricity Matías Raby 1. Exponential model in excel to calculate static projection of demand (based on parking garage example).

Future Demand of Electricity Matías Raby 2. Exponential model + 36% variability in projection

Future Demand of Electricity Matías Raby 3. Exponential model + 36% variability in projection + 10% annual volatility.

Future Price Natural Gas Matías Raby From historical data: Grow rate: 4.3% Volatility: 34.11%

Future Price Natural Gas Matías Raby From historical data, I calculated lattice parameters u, d and p. Used excel model based on Lattice Analysis, considering p=0.56, u=1.41, d=0.71. Logic: If random number < 0.56, then *u, otherwise *d.

Regulation of Carbon Emissions Matías Raby No clear position from Chilean Government. Assumed 30% chance of being implemented each year and once implemented is never repealed. Excel model. Logic: If random number < 0.3, then Approval, otherwise Rejection.

Excel Simulation Plant Specifications (MIT Center Energy & Env. Policy Research) DEMAND NAT. GAS PRICE CARBON TAXES Uncertainties

Excel Simulation Matías Raby Sample result for Fixed Option Simulation

Excel Simulation Matías Raby Sample result for Flexible Option Simulation Nuclear – Nuclear Option Nuclear – Gas Option

Results Comparison in terms of ENPV It is clear that flexible option is more favorable in this case. Results affected considerable while changing decision rule that set when to expand. Best results obtained when decision to expand is taken when demand 30% higher than installed capacity (DR 3). Effect of the Discount Rate

Results Matías Raby Comparison in terms of Value at Risk and Gain ENPV (millions) P 5 Value (millions)P 95 Value (millions) Fixed Option$1,166$ -767$2,608 Flexible Option$2,325$ 943$3,509

Conclusions Matías Raby Since both options presented positive ENPV’s, it might be worth to analyze this possibility in Chile. Flexible option is more favorable option in terms of profit, risk and return of investment. In this case, a certain delay in the decision to expand was beneficial in terms of ENPV because the DR reduced effect of the capital cost of the second plant. This “benefit” outweighed the losses caused by producing less during this time. Study provides initial guidance of whether a nuclear (20.3%) or gas power plant (79.7%) is going to be more appropriate if decision to expand turns up. Still, investor have to keep observation in time to take advantage of the flexible design.