World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application.

Slides:



Advertisements
Similar presentations
CONTROLS OF SUPER CRITICAL BOILERS
Advertisements

Energy Efficient Steam Systems
Boiler Operation Procedures
402 COMFORT CONTROL LOGIC. Questions SUB BASE Up to 16 wires may be required.
Lokotrack ST352 Presentation
① The output signal of a room thermostat is ON or OFF according to changes of room temperature ② The power supply to a motorized valve is ON or OFF according.
Advanced Boiler Control for Biomass/Solid Fuel Boilers
Unit Test Calibration Training
Superheaters.
Engineer Presentation
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Fuel Evaporation in Ports of SI Engines P M V Subbarao Professor Mechanical Engineering Department Measure of Useful Fuel …..
UTSW Thermal Energy Plants, Power Generation and Electrical System What do we do to meet the Emission Reduction, Energy usage Reduction and Electrical.
AccuMax Multi-Point Injection Mechanics
STEAM HEATING.
1 BARRY DUNGEY General Manager Engineering & Maintenance June 2008 Loy Yang Power Station Control System Upgrade.
Homeowner Support Hotline:
„ Save Energy and Resources with BRAUMAT Analysis and Options.
Legacy Remote I/O Upgrade to Ethernet
Melcotel TM Features and Benefits Melcotel - Introduction New features –Links with up to 250 room units –Settings reset –Automatic switch OFF –Setback.
HYDRONIC HEATING AQUASTATS
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
TECHNICAL TRAINING INVERTER-Y
Topic 5 Enhanced Regulatory Control Strategies. In the previous lecture…  Plant test  Interacting loops.
1 System planning 2013 Lecture L9: Short term planning of thermal systems Chapter Contents: –General about thermal power –Production cost –Start.
World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions PID Control (P)roportional (I)ntegral Internal Stat PID (D)erivative Further.
World Leaders in Combustion Management Solutions Training School Autoflame Training 2013 PID.
World Leaders in Combustion Management Solutions Taiwan introduction.
World Leaders in Combustion Management Solutions ModuleScreenshots Normal Operation Features Commissioning The Mk7 MM System.
New Product Developments World Leaders in Combustion Management Solutions Mk.7 Data Transfer Interface (D.T.I.) THE MK7 DATA TRANSFER.
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
New Product Developments World Leaders in Combustion Management Solutions Mk.7 Data Transfer Interface (DTI) Autoflame Training 2014.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
Intelligent Boiler Sequencing
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
World Leaders in Combustion Management Solutions Water Level System Autoflame Training Water Level System.
New Product Developments World Leaders in Combustion Management Solutions New Products New Products.
World Leaders in Combustion Management Solutions New Product Developments Autoflame Sales Meeting 2011 New Product Developments.
Service Section Technical Training December 2005.
World Leaders in Combustion Management Solutions Mini Mk7 Evolution Autoflame Training Mini Mk.7 Evolution.
World Leaders in Combustion Management Solutions End User Guide Lockout Codes Pressure Sensors Error Codes Flame Safeguard UV.
World Leaders in Combustion Management Solutions Remote Monitoring & Data Logging C.E.M.S I/O Modules DTI Autoflame Training,
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Advanced control strategies. CONTROL SYSTEMS The process parameters which are measured using probes described in the previous sections may be controlled.
PROGRAMMABLE LOGIC CONTROLLER
ClearFire-LC Hydronic Boiler Solution. ClearFire Family Capacities from 400 to 12,000 MBH 2 ClearFire-H - Steam ClearFire-C - Condensing ClearFire-V -
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
Central Processing Unit 0500 with ECO
Fan Coil Controller FC/S 1.1
EPC3000 Controllers Helping deliver an efficient and secure process Maintain the highest standard of production quality and ease your.
Heat-Timer Control Options
Roof Top Unit Overview (MAGNUM)
Chiller Plant Manager (CPM)
Digital Chart Recorder Operation
NEW ARISTON STORAGE BOILERS March, 2009.
Universal Interrupted Electronic Oil Primary R7184U Training Module
easYgen-3000XT Series Training
Presentation transcript:

World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application Autoflame Training, 2011 Lead-Lag Control

World Leaders in Combustion Management Solutions OverviewExplanationFurther InformationApplication Further Information Explanation Introduction Agenda Objectives Explanation and Set-up Procedure Mk7 communication features Other Information and Illustrations

World Leaders in Combustion Management Solutions OverviewExplanationFurther InformationApplication Further Information Explanation Introduction Overview of System Operation: Features and Benefits The principal objective of Lead-Lag Control is to ensure that the minimum number of boiler/burner units are in operation at any one time. The benefits from using Lead-Lag Control include: –Increased savings in electrical costs –Reduction in thermal stresses on the boiler –Increased overall plant efficiency There are 2 variations of Lead-Lag software –One for Heating Boilers –One for Steam Boilers

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Lead-Lag Control A maximum of 10 MM modules may be interconnected by a 2 wire screened data cable Methods to identify the “lead” boiler by –Connecting a mains voltage onto terminal #88 –Instructing the modules via the D.T.I. Module by software Once a lead boiler has been selected it works in the following way –Lead boiler identifies it’s own firing rate –Lead-Lag software calculates the amount of heat being contributed to the system by this boiler

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Options that must be set for both forms of Lead-Lag  Option #16 must be set to #1 or #3.  Option #33 (MM identification) must be set correctly. Each MM unit must have its own individual number (from #1 to #10). If this is not set then the MM units with the same ID will turn off and on repeatedly.  The fuel flow metering must be entered. This is how the MM units turn on and off, based on the firing rate of the burners.  To enter the fuel flow metering press ENTER when option #57 is set to #1 and this is displayed on the MM screen.  The next time the burner starts the fuel flow metering program will continue. The fuel valve angular position will be displayed and the heat input must be entered. This is done from high fire (position #1) down to low fire (position number #10).

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Setting the Burner Rating Options #34 and #77 Both of these options set the rating of the burner. Option #34 sets the value (e.g. 5) and option #77 selects the units (e.g. MBtu/Horse Power/Mega Watt). Example: –Option #34 = 20 –Option #77 = 9 –Rating of burner = 20 MBtu’s –Option #34 = 20 –Option #77 = 2 –Rating of burner = 20 MW

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Sequence Scan Time and its Importance Option #35 The sequence scan time has critical effect on the responsiveness of the system, as it dictates how often the Lead can make judgements to turn burners on and off. It is important to change this option, especially on steam applications when there is a dynamic load. Sequence scan time too long- sudden demand can cause the header pressure to drop, e.g. a sudden steam demand from an Autoclave Sequence scan time too short- the system may bring another boiler on when the previous boiler to be turned on had not yet begun to contribute to the requirements, e.g. the sequence scan time is set shorter than the purge time of a burner.

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Steam Boiler Sequential Control Option #41 1 st state is “on-line/lead” - is when the boiler is operating purely under the control of the MM module’s internal P.I.D. load controller 2 nd state is “standby warming” – the header valve is shut. The boiler operates at a reduced set point that is an offset from the required value. In standby warming condition the burner can only run at low fire and only runs for a number of minutes each hour 3 rd state is “off-line” – is with the burner shut down and the boiler cold.

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Lag Boiler Operation in Standby Mode Phantom set point only operates on the on times, option 54

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Phantom Setpoint

3-State Sequencing

World Leaders in Combustion Management Solutions OverviewExplanationApplicationFurther Information Application Further Information Explanation Introduction Steam Boiler Sequential Control Parameter #87- change up threshold: if the total capacity of the lead boiler reaches 95% (or value set in this parameter) then the 1 st lag burner will start to fire. If the total capacity for both boilers is 95% then the 2 nd lag boiler will start to fire. Parameter #86- change down threshold: if the total capacity of 3 boilers goes below 85% (or the value set in this parameter) then the 2 nd lag boiler will turn off. The lead and 1 st lag boiler are able to cope with the load requirements. If the total capacity of the 2 remaining boilers goes below 85% then the 1 st lag boiler will turn off since the lead boiler can cope with the load.

2-State Sequencing

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Low Pressure Steam Applications If the setpoint is set to 20 psi (2bar) or less then low pressure steam control is implemented

3-State Low Pressure Sequencing

2-State Low Pressure Sequencing

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Shuffle Sequencing

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Potential Applications 3 twin burners 3 single furnace boilers 1 twin burner & 2 single furnace boilers

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Hot Water Sequencing/Lead Lag Control Hot Water Sequencing The following options must be set correctly for hot water sequencing to function correctly: Option #53 – 0 Option #41 – 0 Ensures that boilers that are switched “off line” do not contribute return temperature to the water flow header and thus diluting the flow temperature to the building

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Parameter 57 increased comms Set this to the highest MM ID you are using. The bus driver will then only request data from the number of units as set in Parameter 57.

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Further Parameters

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction IBS Diagnostic

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction IBS Diagnostic (Continued) IBS screen shot showing diagnostic Par 83,84

World Leaders in Combustion Management Solutions ExplanationApplicationFurther InformationOverview Application Further Information Explanation Introduction Bus Driver IBS screen shot showing bus driver (diagnostic) Par 83,84 When using the lead-lag intelligent boiler sequencing (IBS), the bus driver is now determined by the lowest MM ID number, as set in Option 33. Previously this was always the lead boiler. This assists in speeding up the communications between boilers when sequencing and also with the DTI when used for shuffle sequencing.

World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application Trouble Shooting Make sure only 1 lead boiler is selected –Either via the DTI or a live input on terminal #88 (lead boiler select switch) Fuel Flow Metering is correctly set –This must be calculated and entered for all boilers It is very important that the correct cable is used for communication between boilers (Beldon 9501) –Use a daisy chain configuration (only connecting the screen at one end of the wire)

World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application Trouble Shooting (continued) Make sure only that there is no input on #94 &95 all units must be in auto (modulating) Make sure that option 47 (cold start routine) is not optioned Make sure that the reduced set point is not set, all boilers should use the required set point or phantom set point (standby warming)

World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application Trouble Shooting (continued) Difficulties with maintaining load can often be overcome by making minor alterations to the sequence scan time (option 35). Significant alterations to sequence scan time, will have a significant effect on the systems responsiveness If using shuffle sequencing ensure parameter #101 is set correctly

World Leaders in Combustion Management Solutions OverviewExplanationFurther Information Application Further Information Explanation Introduction Application Thank you for listening.