LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research.

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
LARP MSM Conductor, Cable and Procurement - A. Ghosh1 Strand, Cable and Procurement BNL -FNAL - LBNL - SLAC Magnet Systems Meeting Jan 09, 2014.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Oct , 2013, CDP D.R. Dietderich LARP Conductor & Cable Review 1 Conductor Development Program Support for LARP and HiLumi LARP- HiLumi Conductor.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Quality assurance of the QXF- Q2 Nb 3 Sn cable mass production C. Scheuerlein, 6 November 2014 HL-LHC/LARP International Review of the Superconducting.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
LARP DOE Review, 7/9/2012Magnet Systems Introduction – G. Sabbi 1 Magnet Systems Overview and HQ Program GianLuca Sabbi 2012 DOE Review of LARP SLAC, July.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
D.R. Dietderich Frascati, Italy Nov , 2012 RRP-NbSn Conductor for the LHC Upgrade Magnets RRP-Nb 3 Sn Conductor for the LHC Upgrade Magnets A. K.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
HE-LHC, 10/14/2010GianLuca SabbiUS LARP Magnet Development LHC Accelerator Research Program Magnet Development GianLuca Sabbi for the US LARP collaboration.
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
LARP Meeting, Oct. 6, 2005 D.R. Dietderich, LBNL1 LARP Cable R&D FY05 & FY-06 Plans D.R. Dietderich, LBNL Geneva, IL October 5-6, 2005 bnl – fnal – lbnl.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
US-side contributions to the EUCARD2 collaboration Planning video meeting May 16, 2013.
HL-LHC/LARP Cable Review, CERN, Nov Lessons Learnt in LARP- A. Ghosh 1 Lessons Learnt from LARP experience Arup. K. Ghosh HL-LHC/LARP International.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
LARP review, Fermilab, 6/10/2013Magnet Project Overview – G. Sabbi 1 HL-LHC IR Quadrupole Magnet Project Overview GianLuca Sabbi Internal Review of proposed.
LARP Review, June 10, 2013Magnet Cost and Schedule – M. Kaducak 1 IR Quadrupole Cost and Schedule Marc Kaducak LARP Review June 10, 2013.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
LARP DOE Review July 13-14, 2009Materials – Conductor Support - A. Ghosh1 LARP DOE Review July , 2009 FNAL 2.4 Materials – Conductor Support Arup.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
DOE Review, 7/15/2010GianLuca SabbiMagnet Systems - Progress and Plans Magnet Systems Summary Progress and Plans GianLuca Sabbi DOE Review of the LHC Accelerator.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
Procurement of Nb 3 Sn strand, cable fabrication, and quality control for the U.S. Hi-Lumi LHC Accelerator Upgrade Project Lance Cooley, Fermilab L3 manager.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
Lessons learnt from CERN experience
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF cable with RRP wires for Q2
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
MQXF Planning Paolo Fessia, Frederic Savary, Ezio Todesco, Lucio Rossi - CERN Mike Anerella, Peter Wanderer - BNL Giorgio Ambrosio, Mark Kaducak - FNAL.
CERN Conductor and Cable Development for the 11T Dipole
MQXF Short Models Status and Plans
Procurement of Nb3Sn strand for coils assembled at CERN
MQXF cable with RRP wires for Q2
MQXF updates P. Ferracin October 9th, 2014.
New Magnets for the IR How far are we from the HL-LHC Target?
Presentation transcript:

LARP Collaboration Meeting 15 Nov 1-3, 2010 Conductor Procurement and Qualification Arup K. Ghosh (BNL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program

Nov 8-10, Arup Ghosh2 Outline Conductor Procurement Specifications Planned purchase Present Inventory Conductor qualification Ti-Ternary conductor Summary

Nov 8-10, Arup Ghosh3 Nb 3 Sn HQ-Strand Specification LARP-MAG-M-8002 Rev-E RRP 108/127 with increased Copper 108/127

Nov 8-10, Arup Ghosh4 Conductor Procurement In FY10 –Took delivery of 88 Kg of wire Initial spec for 54/61  Changed to 108/127 Delivered in Jan’10 –Took delivery of 67 kg of 108/127 wire Next delivery of 67 kg  Dec’10 –On order 800 kg of 108/127 wire Delivery in CY 2011 In FY 2011 –Plan to order 380 kg –Additional 200 kg (from contingency) –Delivery in CY 2012

Nov 8-10, Arup Ghosh5 Conductor Inventory Nov kg of 0.7 mm wire for 2-3 UL’s of LQ 60 kg of 54/ mm wire from five billets available for practice coils and cable RRP 108/127 (increased spacing) –11 kg at 0.7 mm RRP 108/127 (increased spacing) –27 kg at 0.8 mm (some in short lengths)

Nov 8-10, Arup Ghosh6 Strand Production and Cabling Plan Cable ID ending in R denotes cable made using standard 2-pass method Cable ID without R denotes cable made using 1-pass with annealed strand Cable ID ending in C denotes cable made with annealed strand with core. HQ1: 1 m HQ, HQ4 : 4 m LHQ 1 UL of HQ1 requires 18 kg, HQ4: 72 kg The cable for the latter series of HQ1 coils will likely be made with a core.

Nov 8-10, Arup Ghosh7 Conductor Qualification -1 Billets from OST HQ-cable fabrication Coil Winding & HT Ic Cable Qualification Delivered to LARP HT Witness Sample Test Magnet Fabrication Magnet Test Billet Qualification

Nov 8-10, Arup Ghosh8 Conductor Qualification -2 Billet Qualification –Rely on OST data –Meets minimum performance specification –Low field stability current I s not measured. –Does LARP need further testing ? Cable Qualification –This is important and needs to be completed prior to coil winding. –Minimum 3 extracted strand and one round wire –HT as specified for coil reaction –HQ cables were checked during the development phase and for the first few cable runs. No formal documentation implemented.

Nov 8-10, Arup Ghosh9 Conductor Qualification -3 HT Qualification –Witness sample tests of extracted strands –Tests done at two measurement labs ? –Minimum of three extracted strand and one round wire at each site. Is this sufficient ? –1.9 K tests ?

Nov 8-10, Arup Ghosh10 Ti-Ternary RRP 108/127 There are new results from a study of Ti-doped RRP wires that indicate that Ti-doped wires are more tolerant than Ta-doped wire in tensile strain –Wire for study used CDP developed billets 54/61 (9415), 90/91 (8079), 108/127(9416) and 54/61 Nb-Ta-Ti-Sn (9362) –There are additional billets being produced by OST in FY10 under the CDP program –90 kg scheduled to be delivered in Mar’11 What should be the strategy to qualify this type of conductor for the future ?

Nov 8-10, Arup Ghosh11 Summary Present Procurement Plan –All wire will be of the RRP 108/127 type mm –The planned purchases through FY’11will satisfy the needs of the HQ program, and initial demands of the 4m magnets –Long term plan to increase strand inventory to support LHQ magnet development Is there sufficient strand ? –Lead time for strand is now months Note: OST has very significant ITER production work ITER work will be conclude mid-2012 However, they can handle kg of RRP for LARP Conductor qualification plan needs to be formalized –How much QA is essential to mitigate risk ? Cable quality, HT verification of the coil –How much QA is desirable ?