Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.

Slides:



Advertisements
Similar presentations
1 Project X Proton Driver David Neuffer September 2011.
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Muon Coalescing 101 Chuck Ankenbrandt Chandra Bhat Milorad Popovic Fermilab NFMCC IIT March 14, 2006.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Ion Accelerator Complex for MEIC January 28, 2010.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Muon Collider 2011 Workshop Jun 27-July 1 in Telluride, CO Gollwitzer & Nagaitsev presented Attending: Ankenbrandt, Lebedev, Pasquinelli, Popovic, and.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
F Project X Overview Dave McGinnis October 12, 2007.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
December 5, Chuck Ankenbrandt Fermilab Muon Collider Design Project X as a Hi-Rep-Rate Driver for a Muon Collider Chuck Ankenbrandt.
Muon Collider Design Workshop, BNL Dec-09112/01/2009 C.W. Linac Options (talk not much different from talk at High Intensity Proton Accelerator Application.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Proton Delivery to Target Keith Gollwitzer Accelerator Division Fermilab MAP 2012 Winter Meeting March 7, 2012.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
F Project X Overview Dave McGinnis August 8, 2007.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
Proton Beam for PRISM Keith Gollwitzer Accelerator Division Fermilab 5 th Workshop Project X Physics – Muons November 8, 2010.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
Slide 1 The Heavy Ion Fusion Science Virtual National Laboratory Why heavy ions? Target requires: 3.5 – 6 MJ in ~ 10 ns  500 TW Range ~ 0.02 – 0.20 g/cm.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Working Group 7 Pulsed Linac and Injection Summary D. Johnson, S. Nagaitsev, D. Raparia for Working Group 7 participants September 9, 2010.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Booster/Muon Campus Stage 1+ 1 GeV Nuclear/Booster-Muon Campus Stage 1 3 GeV Linac/1GeV program Stage 2 3 GeV 3-Way split Stage 2 3 GeV-8 GeV Linac Stage.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
F Sergei Nagaitsev (FNAL) Webex meeting Oct ICD-2 chopper requirements and proposal #1.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
UK Neutrino Factory Conceptual Design
+-- Collider Front end- Balbekov version
Alternative/complementary Possibilities
Progress in the Multi-Ion Injector Linac Design
Linac possibilities for a Super-B
Muon Acceleration using 8 GeV Proton Driver Linac
Meson Production Efficiencies
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
Multi-Ion Injector Linac Design – Progress Summary
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011

Project X Mission Goals Provide a neutrino beam for long baseline neutrino oscillation experiments based on a capability of targeting at least 2 MW on proton beam power at any energy between GeV. Provide MW-class, multi-GeV, proton beams supporting multiple kaon, muon and neutrino based precision experiments. Simultaneous operations of the rare processes and neutrino programs are required. Provide a path toward a muon source for possible future Neutrino Factory and/or Muon Collider. Provide Options for implementing a program of Standard Model tests with nuclei and/or nuclear energy applications. Accelerator Advisory Committee, Nov. 7-9,

MAP Layout based upon Project X Accelerator Advisory Committee, Nov. 7-9, ?? Accumulator Ring Compressor Ring 4MW Target

MAP Proton Beam Requirement IDS-NF Muon Collider is same except  1 Bunch per train at Hz Accelerator Advisory Committee, Nov. 7-9, ParameterValue Kinetic Energy5-15 GeV Average Beam Power4MW (3.125 x protons/s) Repetition Rate50 Hz Bunches per train3 Total Time for bunches240 μs Bunch Length (rms)1-3 ns Beam Radius (rms)1.2 mm Geometric Emittance (rms)< 5 μm β* at target> 30 cm

Project X RDR Reminder CW Linac will support average beam current of 1 mA to 3 GeV Pulsed Linac (3-8 GeV) will have a ~5% duty factor Possible 8 GeV beam power of 320 kW Programmable Chopper System (part of H- source) will provide appropriate bunch structure for the linac experiments as well as fill the appropriate part of the RF buckets in the accumulating Recycler Ring Accelerator Advisory Committee, Nov. 7-9,

Project X – MAP Task Force Project X Director Steve Holmes and MAP Director Steve Geer initiated a task force Membership (see extra slide) comes from Project X and Muon Accelerator Program Charge (see extra slide) is to outline a plausible solution to allow Project X become part of a Proton Driver  Upgrade of Project X How affect RDR?  Feasibility of proton beam reformatting Can it be done? Task Force is a result from 2010 AAC recommendations Accelerator Advisory Committee, Nov. 7-9,

Task Force Steps Taken With desired proton energy range, obvious to start with increasing beam power out of pulsed linac at 8 GeV Project X upgrade  Increase particles Per linac bunch & average beam current to 5 mA  Increase pulsed linac duty factor Increase to 10% Beam Reformatting  Accumulation Stripping  Bunch Compression  Delivery to target Final Focus NF bunch train MC beam line trombone Discussing instability limitation for rings Accelerator Advisory Committee, Nov. 7-9, ?? Accumulator Ring Compressor Ring 4MW Target

Project X Upgrade Proton Driver - 1 Accelerator Advisory Committee, Nov. 7-9, Front End (warm) H- ion source, LEBT, RFQ, MEBT, Programmable Chopper System Initially 5mA Run at 10mA (Ion source is capable) Programmable Chopper Capable of bunch by bunch 162.5MHz Will suppress beam to limit beam current down stream to 5mA 1mA average

Ion Source Accelerator Advisory Committee, Nov. 7-9,

RFQ Accelerator Advisory Committee, Nov. 7-9,

Collimation Project X systems designed to intercept beam will have to be able to handle the increased number of particles  Factor of 2 prior to chopper system  Factor of 5 downstream of chopper Will also need to be able to handle increase in beam size  See previous slide for 45-60% in RFQ Accelerator Advisory Committee, Nov. 7-9,

Project X Upgrade Proton Driver - 2 Accelerator Advisory Committee, Nov. 7-9, GeV CW SRF Linac Average beam current 1mA 5mA 325 and 650MHz Retuning of couplers to be efficient May set initially for higher current

Future CW Linac Worst Case Accelerator Advisory Committee, Nov. 7-9, GeV physics program stay with average beam current of 1 mA.  10% at 5 mA and 90% at 1 mA average current

650 MHz RF Power Accelerator Advisory Committee, Nov. 7-9,

Project X Upgrade Proton Driver - 3 Accelerator Advisory Committee, Nov. 7-9, Pulsed Linac 1.3GHz SRF 3-8 GeV 10% 5% duty factor at 10Hz 15Hz More RF power Upgrade of couplers More cryo capicity

Pulsed Linac Accelerator Advisory Committee, Nov. 7-9,

Project X Upgrade Proton Driver - 4 Accelerator Advisory Committee, Nov. 7-9, Conventional facilities  More water cooling  Building space More cryo capacity More Klystrons An upgrade re-uses >75% of RDR cost

Rings’ Concepts & Concerns Accelerator Advisory Committee, Nov. 7-9, Simple numbers to start  T rev ~ 800 ns  f rf ~ 10 MHz  h = 8  Injection scheme ~50 ns beam ON followed by ~50 ns NO beam Evolution of design  Increase of circumference (~300m)  Space for RF and Injection/Extraction components  Several designs and will settle on one  Concerns Injection: Stripping Instabilities Beam size in Compressor Ring after bunch rotation Accumulator Ring Compressor Ring 4MW Target

Ring Concern: Injection/Stripping Stationary foil will not survive Solutions are being investigated by other groups; will have to keep informed of progress  Will need to build upon Project X R&D for stripping at 8 GeV in to Recycler/Main Injector  Rotating foils  Laser Should not forget about un-stripped beam (~1%) needs to be “absorbed” Accelerator Advisory Committee, Nov. 7-9,

Ring Concern: Instabilities Lots of charge – few bunches Cursory look at different stability criteria For example, maximum power per bunch for longitudinal stability (Lebedev: space charge, round beam, round vacuum chamber) Accelerator Advisory Committee, Nov. 7-9, Final Bunch Parameters (Compressor Ring) Initial Ring Bunch Parameters (Accumulator Ring)

Possible Beam Delivery Schemes Accelerator Advisory Committee, Nov. 7-9, Accumulate beam at 15 Hz; different number of bunches Neutrino Factory (12 bunches accumulated)  Transfer 3 bunches to Compressor ring Transfers occur at 60Hz  Rotate bunches  Extract to target a bunch every 120 μs Muon Collider (4 to 8 bunches accumulated)  Transfer all bunches to Compressor Ring  Rotate bunches  Extract all bunches  sending each bunch to a different length beam line  all bunches arrive at target simultaneously

Muon Collider Trombone Accelerator Advisory Committee, Nov. 7-9,

Plans Design final focus optics  Design Muon Collider trombone delivery Set rings and beam lines lattice  Start studies of instabilities Deliver Task Force report on feasibility by the New Year Accelerator Advisory Committee, Nov. 7-9,

Extras Accelerator Advisory Committee, Nov. 7-9,

Project X – MAP Task Force Membership Alexahin, Yuri Ankenbrandt, Chuck Chase, Brian Gollwitzer, Keith Jenner, Leo Kourbanis, Ioanis Lebedev, Valeri Nagaitsev, Sergei Neuffer, Dave Palmer, Bob Popovic, Milorad Yakovlev, Slava Zisman, Mike Accelerator Advisory Committee, Nov. 7-9,

Project X – MAP Task Force Charge Neutrino Factories and Muon Colliders require high power (~4MW) proton beams with an energy in the range 5-15 GeV, packaged into short bunches (<3ns), incident upon a liquid Hg jet target. The required repetition rate differs between Neutrino Factories and Muon Colliders, the most demanding (lowest rate) being for a Muon Collider which typically requires a repetition rate of 12 Hz. It is desired that a viable scheme be identified that would enable Project X to be upgraded to meet these requirements. The Project X – Muon Accelerator Program Joint Task Force should: 1. Identify the challenges. 2. Outline possible solutions, including basic calculations required to establish plausibility. 3. Identify the main technical challenges that must be met to implement the possible solutions. 4. Identify any changes to the existing Project X baseline design that are needed to make the possible solutions achievable. An initial status report should be ready for presentation at the time of the Muon Collider meeting in Telluride (27 June – 1 July 2011). A final report should be completed by January 1, Accelerator Advisory Committee, Nov. 7-9,