Goals for this meeting Marcello A. Giorgi Università di Pisa & INFN Pisa Isola d’Elba XIII General Meeting June 1, 2009.

Slides:



Advertisements
Similar presentations
INFN Node – ITALY A. Masiero Univ. and INFN, Padova INFN Sections involved in the node: PADOVA ( coordinating Section – A. Masiero) TRIESTE ( SISSA + ICTP.
Advertisements

1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Sergio Grancagnolo Activity Summary 9 Jan work in BaBar The apparatus Physics with BaBar Data analysis.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
87 th Plenary ECFA Meeting July 2, 2010 SuperB update M.A.Giorgi INFN & Universita’ di Pisa.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Momentum Corrections for E5 Data Set R. Burrell, G.P. Gilfoyle University of Richmond, Physics Department CEBAF The Continuous Electron Beam Accelerating.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
2 nd workshop on SuperB 17.03,2006 LNF Marcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa Closeout Remarks 2nd Workshop on SuperB FRASCATI.
RaDIATE Meeting February /20/13P. Hurh RaDIATE February 2013 Meeting 1.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
1 May 10, 2007 Detector group organization For the CDR writing we had identified subsystem editors/conveners  This structure has concluded its function.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
SuperB project. The origin: infn roadmap 2006 early motivations – e+ e- after Dafne at LNF – SuperB’s synergy with ILC damping rings.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
1 Guy Wormser LAL Orsay On behalf of the SuperB Project SuperB Information Day, Strasbourg, 23 September 2011 Status of SuperB Project.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Elisa manoni SuperB meeting June 17, SuperB meeting, Physics + Computing session July 17, 2009 B reco studies in FastSim: status report Elisa Manoni.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
Supported by Italian Ministry for Foreigner Affaires Sponsored by Academy of Scientific Research and Technology of the Arab Republic of Egypt (ASRT) CM.
XV SuperB General Meeting Caltech Dicember , 2010 SuperB Today M.A.Giorgi INFN & Universita’ di Pisa.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
Update on & SVT readout chip requirements
Opening talk Annecy, March 16 , 2010 Guy Wormser LAL Orsay 15 Feb,2009
SUPERB site status report
Status of MEG-I physics analysis
SUPERB site status report for layout v12
Ti/SS transitions A.Basti INFN-PISA*
The VIRGO DATA ANALYSIS Fulvio Ricci
Meeting closeout Guy Wormser LAL Orsay Orsay February 18,2009
IFR Status Summary W. Baldini on behalf of the IFR Group
Marcello A. Giorgi Università di Pisa & INFN Pisa
Gybe The superB flagship project failed getting the extra support needed to meet the financial planning of a fresh costing reassessment, even in the case.
Introduction to the Workshop
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
HEP with Accelerators Outline Physics in progress Organization
Close out M.A.Giorgi INFN & Universita’ di Pisa
Marcello A. Giorgi Università di Pisa & INFN Pisa
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
3rd Workshop on SuperB SLAC June , 2006
SVT detector electronics
Marcello A. Giorgi Università di Pisa & INFN Pisa
High Granularity Calorimeter Upgrade Studies
V SuperB Workshop ENS May 9-11, 2007
Resistive Plate Chambers performance with Cosmic Rays
X-Ray Endstations Update
Summary of Washington DOE Review
Integrated Safety and Environmental Management
SVT – SuperB Workshop – Frascati Sept. 2010
Marcello A. Giorgi Università di Pisa & Pisa
with colliding electron-positron beams (Super Charm-Tau Factory, SCT)
Perugia SuperB Workshop June 16-19, 2009
Update on the JLEIC pCDR
Marcello A. Giorgi Università di Pisa & INFN Pisa
Presentation transcript:

Goals for this meeting Marcello A. Giorgi Università di Pisa & INFN Pisa Isola d’Elba XIII General Meeting June 1, 2009

MOU Mou’s ready and approved by Giunta of INFN with : SLAC In2p3 BINP

People The convention between INFN and IN2P3 for making possible hiring people by LAL that can work in the italian Labs for SuperB: Detector Accelerator Computing Has been approved by Giunta of INFN and will become active at the end of June.

After Annecy Collaboration in a good shape…

After Annecy

Progress A part from progress on political side in the approval process: SuperB first as flagship in the approved National Plan of Research. SuperB as part of the Italy-Russia agreement: ( Italian participation to Ignitor for nuclear fusion in Russia and reciprocal Russian participation to the SuperB in Italy). Positive signals expect funding in very near future.

Progress in the White Papers White papers are almost ready. Detector Accelerator CDR update Physics white paper is ready.

Progress in the White Papers White papers are almost ready. Detector Accelerator CDR update Physics white paper is ready. BUT improvements in Accelerator in detect and in physics understanding doesn’t stop.

Good News On accelerator: Sometimes it will fit in my garden! Pantaleo is continuing the optimization of the machine. The length is decreasing more and more. GOOD! is continuing the optimization of the machine.

Good News On detector: Better understanding of background. Layer 0 of SVT moving bact to striplets.

Good News On Physics: White paper is ready. But ! Understanding of sensitivities doesn’t end

Example …… Better understanding of polarization contribution in background reduction for  →  channel, using the  → h  tag. Remember the Valencia plot? BUT improvements in Accelerator in detect and in physics understanding doesn’t stop.

Example using the correct generator with polarized beam Rho tag Pion tag Muon tag

Goals In the past month I have circulated to the coordinators of Detecto, Accelerator, Computing and to the Project Board an hypothesis of funding almost flat and strting with 20M Euros in The table that I have circulated is not pessimistic. By the end of this meeting we expect a preliminary exercise to be refined in the near future on how we can deal with this profile for the construction of accelerator, detector and computing. We keep in mind that inside the INFN framework we can dilute some spending, but not too much!! We expect the funding very soon!

Goals day after approval Decide site! Technical and political decision, Site should be technically acceptable: Geological structure of ground, logistic (power, cooling, roads...), space and legal limitation to tunnelling and to the maximum volume of civil contructions, environmental impact. Procedure to arrive “soon” to freeze the foot print of the machine. Startup of procedure for shipping BABAR and part of PEPII components to Italy. Start procurement for those parts of Utilities and detector that are not controversial. NO RELAX ! We have a narrow window for the success and we need a very aggressive path!

We already spent a lot of energy so far. I acknowledge the sincere effort and dedication of all of you.

We will need more from all of us from now on.

END

Rho tag

Pion tag Signal Background

Pion tag