Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management www.lrms.co.nz Regional Presentations Update on.

Slides:



Advertisements
Similar presentations
What is Business Architecture?. Overview Agility matters today more than yesterday Previous methods for managing change were designed for the needs of.
Advertisements

Implementation of the PA Core Standards. Effective Communication Guiding Principle 1 Design and establish systems of effective communication among stakeholders.
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
Quick Recap. Quick Recap The Project Plan Plan Your Work, then Work Your Plan.
Applying the NSDI Framework Transportation Standard for Data Exchange Facts and Fallacies.
May 2014 Operations Planning Construction Design VISION Process 1.Receive design files from Projectwise -Create Maps to determine ownership and maintenance.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
E. Hosseini Aria & R. Ahooee Islamic Azad University, Iran.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
Client/Server Databases and the Oracle 10g Relational Database
HTC Infrastructure Management Specialists; a Montgomery Watson Harza Company Experiences With Kinematic GPS Surveys in Developing Countries Dr Christopher.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
1 Data Strategy Overview Keith Wilson Session 15.
Washington Metropolitan Area Transit Authority Voliya Arakkal Sr.GIS Analyst GIS in Public Transportation Conference September 15, 2011 Linear Referencing.
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
The BIM Project Execution Planning Procedure
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
Qatar Planning Council 1 Best Statistical Information to Support Qatar’s Progress Statistical Capacity Building for Information Society in Qatar.
WVDOT GTI SECTION Status Update for Miss Utility.
Solution Overview for NIPDEC- CDAP July 15, 2005.
NIST Special Publication Revision 1
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
Building Change Capability ‘To put in place the processes and people to support change within STFC’ Draft Blueprint Design v0.1 Project Manager: Steve.
A Summary of State DOT GIS Activities Presented at the 2004 AASHTO GIS-T Symposium Rapid City, SD.
Roles and Responsibilities
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
1 BENEFITS OF A MULTI-YEAR TRAVEL MODEL NETWORK CODING ENVIRONMENT TRB Planning Applications Conference Monday, May 7, 2007.
Mark Nelson, Program Manager for Statewide Planning and Data Analysis TRB International Partnership Meeting January 14, 2015.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
W.D.M. Limited North View, Staple Hill, Bristol BS16 4NX Telephone: Web: IMPROVED LOCATIONAL ACCURACY OF SCRIM DATA USING GPS.
Esri UC 2014 | Technical Workshop | Esri Roads and Highways: Integrating and Developing LRS Business Systems Tom Hill.
Esri Roads and Highways: An Introduction to Roadway Reporter
A Summary of State DOT GIS Activities Presented at the 2003 AASHTO GIS-T Symposium Colorado Springs, CO.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Measure 50 Mobility Improvements Katerina Oktabcova Usti nad Labem Municipality.
N atural R esource I nformation S ystems. ObjectivesObjectives  NRIS Water Overview  Spatial Data in NRIS Water  Integration of NHD data.
A Summary of State DOT GIS Activities Presented at the 2005 AASHTO GIS-T Symposium Lincoln, NE.
1 Standard Student Identification Method Jeanne Saunders Session 16.
River Corridor Closure Project Safety People Results End State and Final Closure Jeff A Lerch Manager, Long Term Stewardship June 1 and 2, 2006.
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
SIGNZ V3.1 Overview Sales Information Systems (NZ) Limited
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Jessica D. Perkins GIS Programmer Analyst 2 Geospatial Transportation Information Section Program Planning & Administration Division of Highways West Virginia.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Copyright 2010, The World Bank Group. All Rights Reserved. Managing processes Core business of the NSO Part 1 Strengthening Statistics Produced in Collaboration.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
SAON Operational Activities Draft proposal Jan René Larsen SAON Board Meeting, January 2012, Tromsø,
Preparing VDOT’s GIS data for the Implementation of Bentley Superload Brian Young – GIS Technical Lead (ARS) Paul Bucher – Quality Assurance Officer Jean.
Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on.
Data Collection for HDM Christopher R. Bennett EASTE.
Introduction to SPA Trade Services PDA Work Flow Management Systems The Era of Change.
Overview of SAP Application Services By Accely. Introduction Developed organizations in any business industry will invest in SAP programs to offer progressive.
I P M 1 City Council Presented by Ken Hall, IPM Program Manager, CH2M HILL October 21, 2008 I n t e g r a t e d P r o g r a m M a n a g e m e n t Executive.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
Creating a Work Breakdown Structure with Microsoft Project.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Software Configuration Management
Improving Crash Data Location
Project Initiatives Identified by the CIA Project
Pryaska Veramoothea André Breytenbach
Overview of Oracle Site Hub
Esri Highway Data Maintenance Solutions: An Introduction
Executive Project Kickoff
Executive Sponsor: Tom Church, Cabinet Secretary
Presentation transcript:

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations Update on the LRMS Project and Impact on Current Field Practice

LRMS Infrastructure Management Regional Presentations Presentation Contents 1. LRMS Background 2. Project Overview 3. Changes to Field Signage 4. Interfacing with RAMM 5. Spatial Data 6. Further Information

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations 1. LRMS Background

LRMS Infrastructure Management Regional Presentations Project Beginnings 1996 Common Highway Location Referencing –SISP Vol.2 Issue 2, October 1996 The Referencing System Must: Provide a recognisable field location system for contractors, consultants, LTSA, Police etc. be compatible with current (and developing) database technology used by Transit be a quality controlled system with high integrity meet timeliness requirements be able to handle complex motorway environment manage databases by internal processes

LRMS Infrastructure Management Regional Presentations Objectives of LRMS “To specify consistent and accurate methods of location referencing, supported by quality systems with timely and appropriate office and field procedures, to provide accurate and consistent referencing on the State Highway network over time.” Catalyst IT Report

LRMS Infrastructure Management Regional Presentations Project Framework Location Referencing Methodology and Procedures LRS Where are we? LRMS The Foundation for Managing the New LRS Management of LRS

LRMS Infrastructure Management Regional Presentations LRMS tells us Where we Are A single location can have a number of references depending on the LRS Method adopted

LRMS Infrastructure Management Regional Presentations Data TMS PROMAN RAMMEtc. Data Database Application Communication User Interface Oracle: Network Model (Based upon LRS) GIS exor Highways exor Highways will become the Referencing Platform Project Vision: “LRMS will be the Integrator for Transit’s asset information systems and will be the Hub for the Road Information Management System” - Dave Robertson

LRMS Infrastructure Management Regional Presentations Benefits from LRMS Project Enhanced Location Referencing Methods Improved business practices Quality assured processes Timeliness of recorded changes to the network information Better understanding by the users A core database for Location Reference Information for all Transit Systems Spatial representation of the Highway Network

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations 2. Project Overview

LRMS Infrastructure Management Regional Presentations A Lot has been Happening Behind the Scenes Much of the project development will not be seen by the general practitioners LRMS Workshop LRMS

Infrastructure Management Regional Presentations Progress is on Schedule 100% 98% 60% 10% Key Milestones Reached –Reviewed existing LRMS and proposed new system (Field and Data Model) –Reviewed Business Processes and identified improvement opportunities –Developed interface methodology

LRMS Infrastructure Management Regional Presentations Project Deliverables Include Task 2000 –Business Process Analysis Task 2100 (draft) –Principles of Location Referencing Task 2200 (draft) –Spatial Referencing Requirements Task 2300 (draft) –Location Referencing Requirements in Transit Task 2400 (draft) –Highways by Exor Gap Analysis Task 2500 (draft) –Implementation Strategy for LRMS

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations 3. Changes to Field Signage

LRMS Infrastructure Management Regional Presentations Existing Field Signs 1. Reference Stations (RS) –Benchmarks along highway –Start of displacement measurements –Established at: Region Boundaries SH Intersections Approximately 16km intervals

LRMS Infrastructure Management Regional Presentations Existing Field Signs 2. Established Route Position (ERP) –Intermediate Benchmarks –Installed to  0.1% –Established at: Ramps Dual or Divided Carriageways Approximately 3-5km intervals

LRMS Infrastructure Management Regional Presentations Existing Field Signs 3. Route Position Marker (RPM) –Intermediate Reference “flags” –Also called km markers –Installed to  100m –Established at: 1km offsets from RS

LRMS Infrastructure Management Regional Presentations Existing Field Signs 4. Bridge Position Marker (BPM) –Unique bridge reference –Sign displays bridge position to 10m –Established at both ends of bridge –Can double as ERP (letters ERP included below number)

LRMS Infrastructure Management Regional Presentations Other Aspects Ramps also marked with ERPs Roundabouts not treated as separate roads OFF RAMP

LRMS Infrastructure Management Regional Presentations New Signage 1. Reference Stations (RS) –Remain Unchanged –“I” and “D” added for dual carriageways OFF RAMP

LRMS Infrastructure Management Regional Presentations New Signage 2. Kilometre Markers –Install on separate post to edge marker –Include SH shield –Not used for referencing (+/- 100m “flags”) –Remove green band OFF RAMP

LRMS Infrastructure Management Regional Presentations New Signage 3. Established Route Position (ERP) –Install new signs at exact km (3-5) existing sign positioning phased out –Displacements from distance marked on sign (e.g. 3.00km) –Add green “referencing” band Retrofit existing OFF RAMP

LRMS Infrastructure Management Regional Presentations New Signage 4. Ramp Identification –Introduce Interchange numbering –Ramps given unique reference –Displacements from 0m at signs –Include green “referencing” band –Include SH shield OFF RAMP

LRMS Infrastructure Management Regional Presentations New Signage OFF RAMP 5. Bridge Identification –Bridges given unique reference –Reference will not change –No link to LRS RAPID system used to create ID

LRMS Infrastructure Management Regional Presentations New Signage OFF RAMP 6. Roundabout Identification –Roundabouts are separate roads with break in main road referencing –Signs same function as Ramp identifiers –Displacements from 0m at sign –Roundabouts treated as separate roads Many TLA’s reference this way

LRMS Infrastructure Management Regional Presentations Summary of Principles All location referencing (LRS) signs have green bands KM Markers are only reference “flags” and not to be used for measurement Only LRS signs have distances Further Information in Task 2300 Report OFF RAMP

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations 4. Interfacing with RAMM

LRMS Infrastructure Management Regional Presentations Multiple IT Platforms Requiring Location Referencing These are used to support its business, for example: –RAMM (Road Asset Maintenance Management) –dTIMS (Multi-year Programming and Optimisation) –LAR (Local Access Roads) –NOMAD (Forward Works Programming) –TOPS (Overweight Permits) –PROMAN (Project Management) –TMS (Traffic Monitoring Information System)

LRMS Infrastructure Management Regional Presentations Transit’s “Vision” is for an Enterprise Data Environment

LRMS Infrastructure Management Regional Presentations LRMS also provides an opportunity to improve Processes Information Exchanged Between existing Transit Applications

LRMS Infrastructure Management Regional Presentations Highways by Exor Being Implemented for: –Ability to manage the network over time (i.e. roll back the clock) –Ability to better manage underlying inventory when changes to the network –Seamless Spatial and Linear referencing methods

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations 5. Spatial Data

LRMS Infrastructure Management Regional Presentations Spatial Data Project undertook assessment of role of spatial data in Transit Recommended that: –Existing linear referencing system be maintained as primary reference –Only those data most suited to spatial referencing shall be spatially referenced Reference stations and other key referencing features Road centreline Bridges Off-road objects such as signs

LRMS Infrastructure Management Regional Presentations Transit’s Centreline Captured in kinematic GPS surveys by WDM Two years of data available; third survey just started 2000 survey evaluated for Wellington network Estimated that 95% of data suitable for LRMS with little corrections

LRMS Infrastructure Management Regional Presentations Adding a Spatial Dimension

LRMS Infrastructure Management Regional Presentations SH53 - Martinborough

LRMS Infrastructure Management Regional Presentations SH 58 - Pauatahanui

LRMS Infrastructure Management Regional Presentations Serving Centreline Data

Infrastructure Management Location Referencing Management System Project LRMS Infrastructure Management Regional Presentations 6. Further Information

LRMS Infrastructure Management Regional Presentations Open to public Linked from Transit’s web site Repository for general details on project Contains material for download (final reports, etc.)

LRMS Infrastructure Management Regional Presentations Contacts Stephen Dol –Project Manager Dave Robertson –Project Owner Chris Bennett –Team Leader Glenn Fawcett –Deputy Team Leader Richard Ellis –Exor